Laserfiche WebLink
L, 'a ...ICPiA 0 k.;:,1.Y11�� <br /> T <br /> 0 Homebu 1 ld ers Inc . Deport ( cont. <br /> Size of septic tanks needed 2-1000 gallon sealed tanks <br /> These tanks should be pumped out every 2-3 years <br /> Phe present sites are ropoed off to prevent any construction from <br /> compacting the sites , this prcocedure should be continued. <br /> There is some concern that the alternate site might be distubed during, <br /> construction due to the location of the house. Therefore another soil <br /> borinw was done north of the primary site indicating the following results ; <br /> SB-1A 0-16"Topsoil ( Black Loam) 10 Yh 2/1 <br /> 16-60 " Park Frown Clay 10 • YR 3/4 <br /> "ottled soil was encounter at 26 inches. <br /> herefore another mound system could be installed in this area <br /> however the perc . tests will have to be done in the spring when the <br /> frost is out of the ground to obtain accurate results. <br /> * ,,otc the land slope in this area is 6 % , which conforms to the <br /> local codes and the Finn. Rules 7080. <br /> rite Evaluator <br /> Robert A. Koch M. PC .A . # 193 <br /> • .t It "'i i • i i • <br />