Laserfiche WebLink
N1r.Roger Olson <br /> September 2, 19911 <br /> Page 2 of 2 <br /> Heating system must be balanced to provide adequate air flow to all rooms. A report <br /> must be submitted to the City of Orono from the heating contractor upon completion. <br /> _ Roofing problem area - as discussed previously, the installvalle meetson t requires <br /> requirements but because of the configuration of the roof an Y <br /> special attention to prevent ice back up and leaking. As discussed and recommended <br /> by several roofing contractors,a one piece pan should be manufactured and installed <br /> in the two problem areas. <br /> The mound septic system, was not installed per the designers plan and must be <br /> enlarged to meet City and State standards.The downslope dike width is undersized <br /> by between i' and 51. The overall dike width is 13' to 16' and must be at least 19' <br /> wide_ When the mound is opened up it can be determined how much additional <br /> width will be required. The rock bed length can not be verified due to the dry <br /> conditions,but it must be 55' per the design. The rock bed length must be verified <br /> when the mound is opened up. The drainfield height appears to be correct based on <br /> a probing through the center of the drainf eld on the upslope side. The mound is <br /> designed to be 3.5'high and the elevation currently is 3.9'. <br /> Exterior doors must have caulking below sills. <br /> An area of the roof above the garage doors is irregular in that there are bumps and <br /> dips. It appears that the trusses may be off set from one another. This is not a code <br /> violation or something the City is requiring to be fixed,however I would like to call <br /> it to your attention as poor workmanship. <br /> The above corrections must be completed before 10-14-98. If this deadline is not met the City will <br /> initiate legal action. Feel free to contact me at my office to discuss any of these items. We would <br /> also be happy to meet you in my office or on site if you wish. Your cooperation in putting this <br /> project behind us would be greatly appreciated. <br /> Sincerely, <br /> Lyle Oman <br /> Building Official <br /> LO/jlg <br /> cc: Bruce L. Vang,Field Inspector <br /> Steve Weckman, On-Site System Manager <br /> Mike & Lori Arne, 125 Truffula Trail,Orono,MN 55356 <br />