My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: Hse issues
Orono
>
Property Files
>
Street Address
>
T
>
Truffula Trail
>
125 Truffula Trail - 33-118-23-44-0041
>
Correspondence
>
Re: Hse issues
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:53:18 PM
Creation date
7/1/2019 9:49:16 AM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Truffula
Street Type
Trail
Address
125 Truffula Trail
Document Type
Correspondence
PIN
3311823440041
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N1r.Roger Olson <br /> September 2, 19911 <br /> Page 2 of 2 <br /> Heating system must be balanced to provide adequate air flow to all rooms. A report <br /> must be submitted to the City of Orono from the heating contractor upon completion. <br /> _ Roofing problem area - as discussed previously, the installvalle meetson t requires <br /> requirements but because of the configuration of the roof an Y <br /> special attention to prevent ice back up and leaking. As discussed and recommended <br /> by several roofing contractors,a one piece pan should be manufactured and installed <br /> in the two problem areas. <br /> The mound septic system, was not installed per the designers plan and must be <br /> enlarged to meet City and State standards.The downslope dike width is undersized <br /> by between i' and 51. The overall dike width is 13' to 16' and must be at least 19' <br /> wide_ When the mound is opened up it can be determined how much additional <br /> width will be required. The rock bed length can not be verified due to the dry <br /> conditions,but it must be 55' per the design. The rock bed length must be verified <br /> when the mound is opened up. The drainfield height appears to be correct based on <br /> a probing through the center of the drainf eld on the upslope side. The mound is <br /> designed to be 3.5'high and the elevation currently is 3.9'. <br /> Exterior doors must have caulking below sills. <br /> An area of the roof above the garage doors is irregular in that there are bumps and <br /> dips. It appears that the trusses may be off set from one another. This is not a code <br /> violation or something the City is requiring to be fixed,however I would like to call <br /> it to your attention as poor workmanship. <br /> The above corrections must be completed before 10-14-98. If this deadline is not met the City will <br /> initiate legal action. Feel free to contact me at my office to discuss any of these items. We would <br /> also be happy to meet you in my office or on site if you wish. Your cooperation in putting this <br /> project behind us would be greatly appreciated. <br /> Sincerely, <br /> Lyle Oman <br /> Building Official <br /> LO/jlg <br /> cc: Bruce L. Vang,Field Inspector <br /> Steve Weckman, On-Site System Manager <br /> Mike & Lori Arne, 125 Truffula Trail,Orono,MN 55356 <br />
The URL can be used to link to this page
Your browser does not support the video tag.