Laserfiche WebLink
1. The Grading Plan should be revised to indicate perimeter erosion control measures(silt fence, bio logs,etc.) <br /> down gradient from proposed work. Measures must be installed by the Contractor and inspected by the City <br /> prior to any work.Contractor must provide a minimum 24 hour notice prior to inspection. <br /> 2. Wetlands are depicted on the landscape plan but no the survey/grading plan. <br /> 3. A stormwater basin (sub surface) is depicted on the landscaping plan but not the survey/grading plan. <br /> Adam <br /> Adam T. Edwards, P.E. <br /> Director of Public Works/City Engineer <br /> City of Orono <br /> (962)249-4661 <br /> aedwards@ci.orono.mn.us <br /> 3 <br />