My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-17-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
06-17-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 8:40:55 AM
Creation date
6/18/2019 8:19:09 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LA19-000039 <br /> Exhibit L <br /> PC <br /> From: Roger Peitso <br /> To: Laura Oakden <br /> Subject: Camp Teko improvements <br /> Date: Monday,June 3,2019 4:24:23 PM <br /> Attachments: Chapter 1306 Subo.2.odf <br /> Laura, <br /> These comments are items that the designers for this project need to be aware of and some are <br /> requirements that will need to be met for approval of this project <br /> 1. The City of Orono has adopted the optional Chapter 1306 subp. 2 of the 2015 Minnesota <br /> Building Code. <br /> a. In essence new buildings more than 2,000 square feet or floor area will need to have fire <br /> sprinklers installed throughout. <br /> b. Additions to existing building that have an aggregate floor area of more than 2,000 <br /> square feet for new and existing will be required to have fire suppression installed in <br /> both new and existing. <br /> c. Any building more than 2,000 of floor area that has a change of use would need to have <br /> fire suppression installed. <br /> 2. Because there is no City water available at Camp Teko wells and water storage tanks would <br /> be necessary for the fire suppression systems. <br /> 3. All ADA requirements will need to be met for all new buildings and expansion of available <br /> parking. <br /> 4. All remodeling of existing structures may need to spend up to 20%of the remodeling costs <br /> to bring the existing structure to become more ADA compliant to today's standards. <br /> Items 1. and 2. would need to be addressed before the City could grant approval for any proposed <br /> alterations. <br /> See the attached document for the requirements of Chapter 1306 of the 2015 Minnesota Building <br /> Code. <br /> Thanks, <br /> City of Orono <br /> Roger Peitso <br /> Building Official <br /> Phone: 952-249-4600 <br /> Direct: 952-249-4625 <br /> Email: rpeitso@ci.orono.mn.us <br /> Fax: 952-249-4616 <br />
The URL can be used to link to this page
Your browser does not support the video tag.