My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-17-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
06-17-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 8:40:55 AM
Creation date
6/18/2019 8:19:09 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LA19-000039 <br /> June 17,2019 <br /> Page 7 of 9 <br /> compared to the impairment or impact of generally permitted uses; The use fits <br /> with the large scale of the property and allowing the adoption of the Master Plan is <br /> not expected to impact the enjoyment of the property in the area. <br /> 10) Provided with screening and buffering adequate to mitigate undesirable views and <br /> activities likely to disturb surrounding uses; This is met. <br /> 11) Not create a nuisance which generates smoke, noise,glare,vibration, odors,fumes, <br /> dust, electrical interference, general unsightliness, or other means; Staff has not <br /> received complaints regarding the use of the property, and the minor expansion of <br /> the use should not create any nuisances on the property. <br /> 12) Not cause excessive non-residential traffic on residential streets, parking needs that <br /> cause a demonstrable inconvenience to adjoining properties,traffic congestion,or <br /> unsafe access; Parking needs are being addressed on site. There are multiple <br /> entrances to facilitate staff and employees parking and access as well as separate <br /> visitor and drop off areas. <br /> 13) Designed to take into account the natural,scenic, and historic features of the area <br /> and to minimize environmental impact; The Master Plan is proposed to project the <br /> nature features of the property and lake. <br /> 14) All exterior lighting shall be so directed so as not to cast glare toward or onto the <br /> public right-of-way or neighboring residential uses or districts;This is met with a <br /> condition for approval. and <br /> 15) Not detrimental to the public health, public safety, or general welfare.This is met. <br /> A CUP may be granted subject to such conditions as the Council may prescribe. Additionally, <br /> a CUP shall remain in effect as long as the conditions imposed by the City Council are <br /> observed, but nothing in this section shall prevent the city from enacting or amending official <br /> controls to change the status of conditional uses. <br /> Building Code Review: <br /> The Building Official has reviewed the submitted application and has provided a memo attached <br /> as Exhibit K. <br /> Practical Difficulties Statement <br /> Applicant has provided supporting documentation regarding the applicable Practical Difficulties <br /> attached as Exhibit B, and should be asked for additional testimony regarding the application. <br /> Practical Difficulties and Conditional Use Permit Analysis <br /> Staff finds the Master Plan to meet all the requirements for a Conditional Use Permit. The <br /> commission should review the items for consideration to address the proposed variances. The <br /> bluff area covers most of the shoreline limiting the accessibility and use of the property. The <br /> proposed storage shed within the 75' lakeyard would be used to house lifejackets, paddles and <br /> lake use accessories, consistent with water oriented storage permitted, though in a larger scale. <br /> The building proposed in the bluff setback are shown to be built on stilts to give a tree house <br /> cabin feel and protect the grading and bluff area. The overall proposed Master Plan is using the <br /> land in a reasonable manner and taking into considerations the unique characteristics of the <br /> property. The variance from the 1 year action on the variance appears appropriate in this <br /> situation as the applicant has developed a comprehensive master plan intended to take years to <br /> fully implement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.