Laserfiche WebLink
' r <br /> LABURATURIES <br /> 1325 North 108th East Avenue <br /> Tulsa,OK 74116 <br /> un I E R T I F I G A I I O N TESTING INSPECTION 918-437-8333 ph. 1 918-437-8487 fx. <br /> Lc� <br /> CLIENT: Nova Industries <br /> 8011 North 154th East Ave <br /> Owasso, OK 74055 <br /> Test Report No: TJ 1768-4 Date: June 26, 2014 <br /> SAMPLE ID: Duct Armor <br /> SAMPLING DETAIL: Test samples were submitted to the laboratory directly by the client. No special sampling <br /> conditions or sample preparation were observed by QAI. <br /> DATE OF RECEIPT: Samples were received at QAI on April 22, 2014. <br /> TESTING PERIOD: 6/16/14 — 6/25/14 <br /> AUTHORIZATION: Signed Proposal Number SP060713-2 by Tim Borgne. <br /> TEST PROCEDURE: The units were evaluated in accordance with ASTM E 1494-12, Annex 1 (Test Method to <br /> Determine the Cohesion/Adhesion Properties of Friable Spray or Trowel Applied <br /> Asbestos-Containing Surfacing Materials). No revisions to this report will be allowed <br /> after 90 days of the report date. <br /> TEST RESULTS: The evaluated Duct Armor coating meets the requirements for "Encapsulated Surfacing <br /> Materials" as defined in Section 6 of ASTM E 1494-12.. <br /> PREPARED BY SIGNED FOR ON BEHALF OF <br /> QAI LABORATORIES INC. <br /> Rocky Hale Jarred L. Johnson <br /> Material Test Technician Quality Manager <br /> Page 1 of 3 <br /> THIS REPORT IS THE CONFIDENTIAL PROPERTY OF THE CLIENT ADDRESSED.THE REPORT MAY ONLY BE REPRODUCED IN FULL.PUBLICATION OF EXTRACTS FROM THIS REPORT IS <br /> NOT PERMITTED WITHOUT WRITTEN APPROVAL FROM QAI.ANY LIABILITY ATTACHED THERETO IS LIMITED TO THE FEE CHARGED FOR THE INDIVIDUAL PROJECT FILE REFERENCED. <br /> THE RESULTS OF THIS REPORT PERTAIN ONLY TO THE SPECIFIC SAMPLE(S)EVALUATED. <br /> WWW.QAI.ORG <br /> info @qai.org <br />