Laserfiche WebLink
Leaf Street <br />Rehabilitation (Reclamation) of 2700 feet <br />The pavement is in poor condition (PCI <br />$ 210,000 <br />MSA <br />of roadway. Work will include <br />69) <br />reclamation/ removal of existing <br />pavement, subgrade corrections, <br />replacement and stormwater <br />improvements. <br />Minnetonka <br />Mill and overlay 1100 feet of pavement. <br />The pavement is in poor condition (PCI <br />$ 62,000 <br />PMF <br />Highlands Mill and <br />Work includes milling 1.5" of the existing <br />62) <br />Overlay <br />surface and replacing it with 1.5" of new <br />bituminous to prolong the overall life of <br />the road. <br />2018 Seal Coating <br />Preventive maintenance. Chip seal 13,050 <br />A seal coat provides a waterproof <br />$ 108,122 <br />PMF <br />(Chip Seal) Project <br />feet of road. Chip Sealing includes the <br />membrane that not only slows down the <br />Deferred due to <br />application of asphalt emulsion followed <br />oxidation process from the sun but also <br />insufficient funding <br />immediately with an aggregate cover. Seal <br />helps the pavement shed water, <br />coats waterproof the surface, provide low- <br />preventing it from entering the base <br />severity crack sealing, and restore surface <br />material. When asphalt is exposed to sun, <br />friction. <br />wind, and water, the asphalt <br />hardens/oxidizes becoming brittle leading <br />to cracking. <br />2018 Crack Sealing <br />Preventive maintenance. Select Streets <br />Crack sealing is a routine preventive road <br />$ 40,000 <br />PMF <br />shall have their cracks and routed, cleaned <br />maintenance. Sealing cracks in asphalt - <br />and sealed. Spot sealing will be required <br />surfaced roads helps prevent moisture <br />on areas with a concentration of small <br />from infiltrating the pavement structure. <br />cracks. <br />This moisture weakens the structural <br />subsurface layers and is a primary cause <br />of pavement deterioration. <br />Linden Lane <br />Realignment of the last 500 feet of Linden <br />The last 500 ft of Linden Lane begins to <br />$ 10,000 <br />PMF <br />Realignment <br />lane so that it is fully within the right of <br />stray out of the right of way to the west. <br />way. <br />Lyric Avenue <br />Mill and overlay 615 feet of pavement <br />The pavement is in poor condition (PCI <br />$ 40,000 <br />PMF <br />(Livingston to <br />60) <br />Blaine) Overlay <br />14 <br />