My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-11-2017 Council Packet
Orono
>
City Council
>
2017
>
12-11-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:13:20 AM
Creation date
5/29/2019 10:50:36 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Streets <br />Project <br />Detail / Scope <br />Justification <br />Estimated <br />Funding <br />Cost <br />Source <br />Sign Inspections <br />This activity includes the inspection all of <br />Annual preventive maintenance <br />$ 17,400 <br />Streets <br />and Maintenance <br />the street signs in maintenance area 5 <br />Operating <br />ROW Tree <br />Tree trimming within the Rights of Way <br />Maintain safety of ROW <br />$ 12,000 <br />Streets <br />Trimming <br />for District 5. <br />Operating <br />Forest Arm Lane <br />Reconstruction of 1700 ft of roadway. <br />The pavement is in very poor condition <br />$ 240,280 <br />PMF <br />Reconstruction <br />Reclaim 6" of existing material, shaping <br />(PCI 44) <br />the reclaimed material and paving with the <br />3.5" of pavement in the city typical <br />section as well as drainage improvements. <br />Wildhurst Trail <br />Reconstruction of 2240 ft of roadway. The <br />The pavement is in very poor condition <br />$ 309,500 <br />PMF <br />Reconstruction <br />new pavement section will consist of <br />(PCI 55) <br />geotextile fabric laid over the subgrade, 8" <br />of aggregate base, and 3.5" of bituminous. <br />Drainage improvements, subgrade work, <br />and restoration will be limited to the <br />extent possible. <br />Vine Place Mill and <br />Mill and overlay 600 feet of pavement. <br />The pavement is in poor condition (PCI <br />$ 34,000 <br />PMF <br />Overlay <br />Work includes milling 1.5" of the existing <br />64) <br />surface and replacing it with 1.5" of new <br />bituminous to prolong the overall life of <br />the road. <br />West Lafayette <br />Reconstruction of 1050 ft of roadway. <br />The pavement is in very poor condition <br />$ 187,500 <br />PMF <br />Reconstruction <br />The new pavement section will consist of <br />(PCI 54) <br />geotextile fabric laid over the subgrade, 8" <br />of aggregate base, and 3.5" of bituminous. <br />Old Crystal Bay <br />Reconstruction of 3200 feet of roadway; <br />Improve the safety and function of the <br />$1,600,000 <br />MSA <br />Road (CAH 112- <br />reconfiguration of access points; <br />roadway. <br />CSAH 6) <br />development of turn lanes; pedestrian <br />Reconstruction <br />crossing improvements and possible <br />signals <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.