My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-13-2017 Council Packet
Orono
>
City Council
>
2017
>
11-13-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 10:45:59 AM
Creation date
5/29/2019 10:22:15 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
No <br />dr 1 <br />dr 2 <br />U1 T Or ORONO WELL NO. <br />Item <br />Well Bid Dual Rotary <br />MOBILIZATION/DEMOBILIZATION, SITE CLEANUP <br />DRILL & DRIVE 24" CASING <br />4 <br />Unit <br />LS <br />LF <br />JOB # 30US93 <br />Unit Price <br />$37,810.00 <br />$165.00 <br />PAY APPLICATION # 6-FINAL <br />TOTAL BILLING TO <br />Estimated DATE PAY APP 6 <br />A rox Qty <br />1 <br />293 <br />Bid Amount <br />37,810.00 <br />48,345.00 <br />QuantityPrice <br />1 <br />3311 <br />37810.00 <br />54615.00 <br />%COMP <br />100% <br />113% <br />Quantity <br />0.25 <br />Price <br />9452.50 <br />dr 3 <br />DRILL 23" (NOMINAL) OPEN HOLE FROM 204 TO <br />1500 FT <br />LF <br />$125.00 <br />207 <br />25,875.00 <br />34 <br />4250.00 <br />16% <br />dr 4 <br />GAMMA LOG <br />LS <br />$1,300.00 <br />1 <br />1,300.00 <br />1 <br />1300.00 <br />100% <br />dr 6 <br />FURNISH & INSTALL 18" CASING <br />LF <br />$95.00 <br />365 <br />34,675.00 <br />365 <br />34675.00 <br />100% <br />dr 7 <br />GROUT BETWEEN 24" AND 18" CASING <br />CY <br />$575.00 <br />21 <br />12,075.00 <br />19 <br />10925.00 <br />90% <br />dr 8 <br />IHI QUE SCREEN <br />LF <br />$245.00 <br />145 <br />35,525.00 <br />133 <br />32585.00 <br />92% <br />dr 9 <br />PACKER WITH GRAVEL DEVICE <br />EA <br />$2,917.00 <br />1 <br />2,917.00 <br />1 <br />2917.00 <br />100% <br />dr 10 <br />FILTER PACK <br />CF <br />$25.00 <br />450 <br />11,250.00 <br />400 <br />10000.00 <br />89% <br />dr 11 <br />FURNISH, INSTALL AND REMOVE WELL <br />DEVELOPMENT EQUIPMENT <br />LS <br />$4,500.00 <br />1 <br />4,500.00 <br />1 <br />4500.00 <br />100% <br />dr 12 <br />DEVELOP WELL SCREEN <br />HR <br />$325.00 <br />80 <br />26,000.00 <br />96 <br />31200.00 <br />120% <br />dr 13 <br />FURNISH, INSTALL AND REMOVE TEST PUMP <br />WITH DISCHARGE PIPING <br />LS <br />$4,850.00 <br />1 <br />4,850.00 <br />1 <br />4850.00 <br />100% <br />dr 14 <br />ADDITIONAL TEST PUMP INSTALL AND <br />REMOVAL <br />LS <br />$850.00 <br />1 <br />850.00 <br />dr 15 <br />TEST PUMPING <br />HR <br />$185.00 <br />50 <br />9,250.00 <br />50 <br />9250.00 <br />100% <br />dr 16 <br />WATER SAMPLING AND CHEMICAL ANALYSIS <br />LS <br />$1,250.00 <br />1 <br />1,250.00 <br />1 <br />1250.00 <br />100% <br />dr 17 <br />TELEVISING SURVEY OF FINISHED WELL <br />LS <br />$1,300.00 <br />1 <br />1,300.00 <br />1 <br />1300.00 <br />100% <br />dr 18 <br />DISINFECT THE FINISHED WELL <br />LS <br />$125.00 <br />1 <br />125.00 <br />1 <br />125.00 <br />100% <br />dr 19 <br />PITLESS UNIT, ENCLOSURE, PAD, BOLLARDS, <br />AND PIPING <br />LS <br />$51,000.00 <br />1 <br />51,000.00 <br />1 <br />51000.00 <br />100% <br />0.15 <br />7650.00 <br />dr 20 <br />PUMP AND MOTOR <br />LS <br />$45,000.00 <br />1 <br />45,000.00 <br />1 <br />45000.00 <br />100% <br />dr 21 DROP PIPE AND WIRE LF $120.00 200 <br />Non-Well LuTg Sum Bid Allowance <br />C.2 Non-Well Lump Sum Bid + Allowance LS $ 178,571.00 1 <br />24,000.00 <br />178,571.00 1 <br />$556,468.00 <br />200 <br />0.9764 <br />SUB: <br />24000.00 <br />174356.72 <br />535908.72 <br />100% <br />98%1 <br />0.0764 <br />SUB: <br />13642.82 <br />30745.32 <br />TOTAL: 53 5,908.72 TOTAL: 30.745.32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.