My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-2017 Council Packet
Orono
>
City Council
>
2017
>
09-11-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 8:02:13 AM
Creation date
5/29/2019 7:49:04 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Orchard Hill of Orono - Project Narrative 06/27/2017 <br />or passive use as is suited to the needs of the residents. The Orchard Hill of Orono project will include <br />roughly 24 acres of set aside including natural wetland areas, wetland buffers (as required by watershed <br />and city standards), and conservation dedications. These areas will be protected by both easement and <br />protective covenant restrictions. In addition, the proposal includes a trail dedication which will connect <br />the cul-de-sac within the new public right of way with the Luce Line Regional Trail along the property's <br />southern edge. In total, the recreational area set aside will exceed 60 percent of the gross land area and <br />will include both active and passive provisions. <br />Ownership/Control. The RPUD district addresses the need for unified ownership and control to ensure <br />that the project is implemented as approved by the City. As stated, the owner and land developer for <br />the project will be the YMCA of the Greater Twin Cities. <br />The YMCA will be responsible for all submissions and approvals required from the City and other local <br />jurisdictions, as well as the Metropolitan Council. The YMCA will further be the responsible party for <br />implementing all subdivision improvements necessary to carry the land development phase of the <br />project through to successful completion. Gordon James Construction is assisting the YMCA with the <br />development process, architectural and builder standards and the sale of lots. Gordon James will be the <br />lead builder of a small group of premium builders allowed to build within the development. <br />Neighborhood Impacts. The developer and builder will manage the development process to minimize <br />impact to adjacent properties. All construction related parking, equipment and material will be handled <br />on-site to minimize impacts to Orono Orchard Road and the surrounding area. In addition, a rock <br />construction driveway and periodic street sweeping will be utilized to control soils being carried onto <br />Orono Orchard Road. City regulations regarding hours of operation will be adhered to for all <br />construction activity. <br />Long term traffic impacts on Orono Orchard Road are expected to be minimal. The City's transportation <br />component of the Comprehensive Plan denotes Orono Orchard Road as a "local road" with about 2,500 <br />vehicles per day. The development is anticipated to add approximately 120 to 150 total new trips per <br />day. <br />Home and Landscape Architectural Standards. The home and landscape architectural quality of the <br />project will be in keeping with the high standards established by Gordon James Construction. The <br />company's attention to careful planning and detailed design orientation results in homes of exceptional <br />quality with elegant interiors and refined exteriors. Each home will be a custom design project resulting <br />in floor plans with approximately 4,000 to 6,000 square feet of finished floor area plus multi -car <br />attached garages. The overall effect is intended to be an upscale neighborhood with homes of <br />compatible size, quality, and outstanding design characteristics. The market approach for the project is <br />to deliver turn -key, custom homes in the price range of approximately $1.4M and $3.5M and up. Please <br />see Architectural Exhibits provided as part of this sketch plan submittal package. <br />The over-all site design concept, consistent with our project's name, is a neighborhood of fine -homes <br />nestled in a lovely orchard -like setting. In addition to quality boulevard tree plantings , project designers <br />will focus on common -area and supplemental tree stands which will emphasize flowering ornamental <br />
The URL can be used to link to this page
Your browser does not support the video tag.