Laserfiche WebLink
ATTACHMENT A: SITE SPECIFIC SWPPP DOCUMENT <br />1 0 C014 0 a . bite <br />CA R 0 U P - <br />Minnesota Pollution Attachment A■ <br />Control Agency <br />9 y <br />tC t <br />R SWPPP is Site Specific D men <br />� � 4 <br />520 Lafayette aid North h o t <br />St. Paul, MN 5535.5-41195 Stormwater Pollution Prevention Plan (SWPPP) <br />To comply with the General stormwater Permit for Construction Activity <br />Doc Type: Stormwater Pollution Prevention Plan <br />Construction Activity Information <br />Project name: IVY PLACE <br />Project location (Briefly describe where construction activity occurs. include address if available.) <br />Address or describe area: 36001VY PLACE <br />City or Township: ORONO State: MN Zip code: 55391 <br />Latitudellongitude of approximate centroid of project: 44.9260341, -93-613450 <br />Method of collection of €atttudellongitude: <br />❑ GPS N Ontine tool ❑USGS Topographic map <br />All cities where construction will occur: ORONO <br />All counties where construction will occur: HENNEPIN <br />All townships where construction will occur: <br />Project size {number of acres to be disturbed)- 1-7 <br />Project type: <br />N Pesidentiial ❑ ComrnerciaUlndustrial ❑ Pead construction <br />❑ Residential and road construction ❑ Other (describe): <br />Cumulative Impervious surface: <br />Existing area of impervious surface: 0.0 (to the nearest tenth acre) <br />Post construction area of impervious surface: 0.4 (to the nearest tenth acre) <br />Total new area of impervious surface: 0.4 (to the nearest tenth acre) <br />Receiving waters <br />TypeI Special water? I Impaired Water?" <br />(ditch, pond, wetland, lake, (See Stormwater Permit (See Stormwater Permit <br />ID, <br />I I I LJ Yes U No I U Yes U No <br />- <br />Water i r i <br />' Walsr Body ldenfiiffcaflon (it]j might not he available for all wets bodies. Use the Speen and Impaired Waters Search Too) at: <br />uwut_aca.srate mn.ors/warerisfowaterlstarmwater-r..htmf. <br />Impaired wafer for the following pofiulant(s) or sfressor(s): phosphorus, turbidity, dfssofved axygen, or biotin impairment. <br />www.pca.state.mn-us - 651-296-6300 - 800-657-3854 . TTY 651-2112.5332 or 800-557-3864 - Available in alternative formats <br />wq-strm2.12 - 4113109 Fr 8176113 Page T of 7 <br />iv ite <br />CiR 01 U P - <br />Dates of construction (Briefly describe where construction activity occurs, Include address if available.) <br />Construction start date: 04/0112018 Estimated completion date: 0410 1 12 01 9 <br />General Construction Project Information <br />Describe the construction activity (what will be built, general timellne, etc): THE PROJECT WILL BE THE DEVELOPMENT <br />OF TWO SINGLE FAMILY HOMES ON A EXISTING VACANT SITE. <br />Describe soil types found at the project: THE EXISTING SOILS AT THE SITE ARE PRIMARILY SANDY LEAN CLAYS. <br />Site Location map - Attach maps (U.S. Geologic Survey 7.5 minute quadrangle.. National Wetland Inventory maps or <br />equivalent) showing the location and type of ail receiving waters., including wetlands, drainage ditches, stormwater ponds <br />or basins, etc. that will receive runoff from the project. Use arrows showing the direction of flow and distance to the water <br />body <br />ng <br />Par k <br />rr -- <br />* CARMAN <br />BAY <br />71 71 <br />www.pca.state.mn_us - 651-296-6300 - 800.657-3864 - TTY 651-282.5332 or 800-657-3864 • Available in alternative formats <br />wq-strm2-12 • 4113109 & 8116113 Page 2 of 7 <br />,e-'% 1v11te <br />G R C� U P - <br />Generat Site Information (III.A) <br />1. <br />Describe the location and type of all temporary and permanent erosion prevention and sediment control Best Management <br />Practices (BMPs). Include the timing for installation and procedures used to establish additional temporary SMPs as <br />necessary. (III.A.4.a) <br />THE PROJECT WILL BE PROTECTED BY TWO (2) MAiN BMP"S, SILT FENCE AND INLET PROTECTION DEVICES. <br />THE SILT FENCE WILL BE INSTALLED AT THE DOWNHILL LOCATIONS OF THE SiTE AND MONITORED AS <br />NECESSARY. INLET PROTECTION DEVICES WILL BE INSTALLED IN ALL CATCH BASINS ON THE SITE AND ANY <br />OFF SITE THAT WILL RECEIVE STORMWATER RUNOFF FROM THIS SITE. AS THE PROJECT PROGRESSES <br />ADDITIONAL BMP'S SUCH AS EROSION CONTROL BLANKET MAY BE UTILIZED. <br />2. Attach to this SWPPP a table with the anticipated quantities for the life of the project for all erosion prevention and sediment <br />control BMPs (III. A. 4.b) <br />SEE PAGE SW1.3 <br />3. Attach to this SWPPP a site map that includes the following features (III.A.3.b - f): <br />• Existing and final grades, including dividing lines and direction of flow for all pre and post -construction stormwater <br />runoff drainage areas located within the project limits. <br />• Locations of impervious surfaces and soil types. <br />■ Locations of areas not to be disturbed. <br />• Location of areas of phased construction <br />■ All surface waters and existing wetlands within one mite from the project boundaries that will receive stormwater <br />runoff from the site (identifiable on maps such as USGS 7.5 minute quadrangle maps or equivalent). Where <br />surface waters receiving runoff associated with construction activity will not fit on the plan sheet, they must be <br />identified with an arrow, indicating both direction and distance to the surface water. <br />Methods to be used for final stabilization of all exposed soil areas. <br />4. Were stormwater mitigation measures required as the result of an environmental, archaeological, or other required local, <br />state, or federal review of the project? ❑ Yes N No <br />If yes, describe how these measures were addressed in the SWPPP. (III.A.6.) <br />N/A <br />S. Is the project located in a karst area such that additional measures would be necessary to protect drinking water supply <br />management areas as described in Minn. R. chapters 7050 and 70607 ❑ Yes N No <br />If yes, describe the additional measures to be used. (III.A.7.) <br />NIA <br />6. Does the site discharge to a calcareous fen listed In Minn. R. 7050.0180, subp. 6.b.? ❑ Yes N No <br />If yes, a letter of approval from the Minnesota Department of Natural Resources must be obtained prior to application for <br />this permit. (Part i B.6 and Part III.A:B) <br />7. Does the site discharge to a water that is listed as impaired for the following pollulant(s) or stressor(s): phosphorus, <br />turbidity, dissolved oxygen or biotic impairment? Use the Special and Impaired Waters Search Tool at: <br />www.pca.state.mn.ustwaterlstormwaterlstormwater-c.html. ❑ Yes N No <br />If no, skip to Training. <br />Does the impaired water have an approved Total Maximum Daily Loads (TMDL) with an Approved Waste Load Allocation <br />for construction activity? ❑ Yes ® No <br />If yes: <br />a- List the receiving water, the areas of the site discharging to it, and the pollutant(s) identified in the TMDL. <br />b- List the BMPs and any other specific construction stormwater related implementation activities identified in the <br />TMDL. <br />If the site has a discharge point within one mile of the impaired water and the water flows to the impaired water but no <br />specific BMPs for construction are identified in the TMDL, the additional SMPs in Appendix A (C.1, C.2, C.3 & (C.4 -trout <br />stream)) must be added to the SWPPP and implemented. (iiI.A.7), The additional BMPs only apply to those portions of the <br />project that drain to one of the identified discharge points. <br />www.Pc a. state. mn.Lis - 651.295-6300 - 800-657-3864 - TTY 651482.5332 or 800-657-3864 - Available in alternative formats <br />wq-strm2.12 - 4113109 it 8116173 Page 3 of 7 <br />G1v11ite _ <br />G R Q 1.1 P <br />NIA <br />9. Identify adjacent public waters where the Minnesota Department of Natural Resources (DNR) has declared "work in water <br />restrictions" during fish spawning timeframes <br />N/A <br />Selection of a Permanent Stormwater Management System (11I.D,) <br />1v1Ulte <br />G R O U P - <br />5. Describe Methods to be used for energy dissipation at pipe outlets (e.g., rip rap, splash pads, gabions, etc. <br />RIP RAP WILL BE UTILIZED AT PIPE OUTLETS. <br />6. Describe Methods to be used to promote infiltration and sediment removal on the site prior to offsite discharge, unless <br />infeasible (e.g., direct stormwater flow to vegetated areas): <br />DISCONNECTED IMPERVIOUS AREA AND INFILTRATION AREAS WILL BE UTILZED. <br />7 For drainage or diversion ditches, describe practices to stabilize the normal wetied perimeter within 200 lineal feet of th <br />e <br />property edge or point of discharge to surface water. The last 200 lineal feet must be stabilized within 24 hours after <br />connecting to surface waters and construction in that portion of the ditch has temporarily or permanently ceased for all <br />discharges to Special, Impaired or "work in water restrictions". All other remaining portions of the temporary or permanent <br />ditches or swales within 14 calendar days after connecting to a surface water, property edge and construction in that area has <br />temporarily or permanently ceased. <br />N/A - NO DITCHES ON SITE <br />S. Describe additional erosion prevention measures that will be implemented at the site during construction (e.g., construction <br />phasing, minimizing soil disturbance, vegetative buffers, horizontal slope grading, slope draining/terracing, etc.)' <br />OTHER EROSION CONTROL PRACTICES INCLUDE BUT NOT LIMITED TO; MINIMIZE SITE EXPOSURE WHEN <br />POSSIBLE, <br />9. If applicable, include additional requirements in Appendix A Part C.3 regarding maintaining a 100 -foot buffer zone or installing <br />redundant BMPs for portions of the site that drain to special waters). <br />N/A <br />10. If applicable, describe additional erosion prevention BMPs to be implemented at the site to protect planned infiltration areas <br />MINIMIZE SITE EXPOSURE IN AREAS ADJACENT TO INFILTRATION AREA. <br />Sediment Control Practices (IV.C� <br />Describe the methods of sediment control EMI's to be Implemented at this site during construction to minimize sediment <br />impacts to surface waters, including curb and gutter systems <br />1. Describe Methods to be used for down gradient perimeter control: <br />SILT FENCE WILL BE INSTALLED AROUND THE ENTIRE PERIMETER OF THE SITE. <br />2. Describe Methods to be used to contain soil stockpiles: <br />SEED AND MULCH AS WELL AS EROSION CONTROL BLANKETS WILL BE UTILIZED AS NECESSARY. <br />3, Describe Methods to be used for storm drain inlet protection: <br />SEE INLET PROTECTION DETAILS. <br />4. Describe Methods to minimize vehicle tracking at construction exits and street sweeping activities: <br />THE PROJECT WILL UTILIZE A ROCK CONSTRUCTION ENTRANCE. <br />5. Describe Methods, If applicable, additional sediment controls (e.g., diversion berms) to be installed to keep runoff away from <br />planned infiltration areas when excavated prior to final stabilization of the contributing drainage area: <br />INFILTRATION AREAS ARE NOT PROPOSED AS PART OF THiS PROJECT, <br />6. Describe methods to be used to minimize soil compaction and preserve top soil (unless infeasible) at this site: <br />LIGHT TRACKED EQUIPMENT WILL BE USED, TOPSOIL WILL BE STRIPPED AND STOCKPILED. <br />7. Describe plans to preserve a 50 -foot natural buffer between the project's soil disturbance and a surface water or plans for <br />redundant sediment controls if a buffer is infeasible: <br />DOUBLE ROW OF SILT FENCE WILL BE INSTALLED ALONG WETLAND. <br />THIS PROJECT WILL DISTURB WITHIN WETLANDS BUT WILL WORK TO MINIMIZE IMPACTS <br />S. Describe plans for use of sedimentation treatment chemicals (e.g.. polymers, flocculants, etc.) see Part iV.C.10 of the permit: <br />N/A <br />www.pca.state.mn-us - 651-296-6300 - 800.657.3854 . TTY 651.282.5332 or 800.657-3MA • Available in alternative formats <br />w4q•strm2-12 • 4113109 fr 8176113 Page 5 of 7 <br />1v1IS1te <br />G R C3 t.J P - <br />9, Is the project required to install a temporary sediment basin due to 10 or more acres draining to a common location or 5 acres <br />or more if the site Is within 1 mile of a special or impaired water? ❑ Yes N No <br />If yes, describe (or attach plans ) showing how the basin will be designed and constructed in accordance with Part III.0 of the <br />permit. <br />N/A <br />ivld lte <br />G R 40 U P - <br />Pollution Prevention Management Measures (IV.I=) <br />1. Describe practices for storage of building products with a potential to leach pollutants to minimize exposure to stormwater <br />ALL BUILDING PRODUCTS WILL BE SEALED AND STORED IN A MANNER TO MINIMIZE EXPOSURE. <br />2. Describe practices for storage of pesticides, herbicides, insecticides fertilizers treatment chemical. and landscape materials: <br />ALL LANDSCAPE TREATMENT CHEMICALS WILL BE SEALED AND STORED iN A MANNER TO MINIMIZE EXPOSURE. <br />3. Describe practices for storage and, disposal of hazardous materials or toxic waste (e.g., oil, fuel, hydraulic fluids, paint <br />solvents, petroleum-based products, wood preservative, additives, curing compounds, and acids) according to Minn. R. ch. <br />7045, including restricted access and secondary containment: <br />ALL HAZARDOUS WASTE WILL BE APPROPRIATELY DISPOSED OF OFF SITE ACCORDING TO LOCAL AND STATE <br />LAWS. <br />4. Describe collection, storage and disposal of solid waste in compliance with Minn. R. ch. 7035: <br />ALL CONSTRUCTION DEBRIS AND SOLiD WASTE WILL BE APPROPRIATELY DISPOSED OF OFF SITE ACCORDING <br />TO LOCAL AND STATE LAWS, <br />S. Describe management of portable toilets to prevent tipping and disposal of sanitary wastes in accordance with Minn. R. ch. <br />7040: <br />SANITARY AND SEPTIC SERVICES WILL BE PROVIDED TO WORKERS WITH PORTABLE FACILITIES MAINTAINED AS <br />NEEDED BY THE PROVIDER. <br />6. Describe spill prevention and response for fueling and equipment or vehicle maintenance: <br />EMPLOYEES WILL BE TRAINED IN TECHNIQUES DESIGNED TO MINIMIZE SPILLS. VEHICLES AND EQUIPMENT <br />SHALL BE CHECKED FOR LEAKS. <br />7. Describe containment and disposal of vehicle and equipment wash water and prohibiting engine degreasing on the site: <br />ALL CONSTRUCTION VEHICLES SHALL BE WASHED OFF SITE- <br />S. Describe storage and disposal of concrete and other washout wastes so that wastes do not contact the ground: <br />ALL CONCRETE WASHOUT SHALL OCCUR OFF SITE. <br />Final Stabilization (IV.G) <br />1. Describe method of final stabilization (permanent coven of all disturbed areas: <br />FINAL STABILIZATION WILL BE ACOMPLISHED WiTH PAVEMENT. SOD AND LANDSCAPE MATERIALS <br />2. Describe procedures for completing final stabilization and terminating permit coverage (see Part IV.G.1-5): <br />UPON FINAL STABILIZATION DESCRIBED ABOVE, THE CONTRACTOR AND OWNER SHALL MUTUALLY TRANSFER <br />THE NPDES PERMIT TO THE NEXT OWNER WITH DOCUMENTS DESCRIBING THE NATURE OF TERMINATION <br />PROCEDURE. <br />Documentation of infeasibility: (if Applicable) <br />www.pca.state.mn.us - 651-296-6300 - 800-657.3864 TTY 651-282-5332 or 800-657-3864 - Available in alternative formats <br />wq-strm2.12 • 4113109 & 8176113 Page 7 of 7 <br />1. Will the project create anew cumulative impervious surface greater than or equal to one acre? ❑ Yes N No Dewatering and Basin Draining (IV.D) ' <br />COR7 <br />00� Rt <br />a n © U P <br />4931 W. 35TH ST. SUITE 200 <br />ST. LOUIS PARK, MN 55416 <br />CivilSiteGroup.com <br />Matt Pavek Pat Sarver <br />763-213-3944 952-250-2003 <br />LAKE W <br />�EST <br />DEVELOPMENT, LLC <br />If yes, a water quality volume of one inch of runoff from the cumulative new impervious surfaces must be retained on site (see 1• Will the project include dewatering or basin draining? ❑ Yes N No U <br />LLJ <br />Part IIID of the permit) through infiltration unless prohibited due to one of the reasons in Part III -D.1 -j- If infiltration is prohibited If yes, describe measures to be used to trealldispose of turbid or sediment -laden water and method to prevent erosion or <br />identify other method of other volume reduction (e.g., filtration system. Wet sedimentation basin, regional ponding or scour of discharge points (see Part iV, D of the permit): 0 <br />equivalent method <br />d <br />2. Describe which method will be used to treat runoff from the new impervious surfaces created by the project (IILD): <br />• Wet sedimentation basin <br />• Infiltration/Filtration <br />Regional ponds <br />• Combination of practices <br />Include all calculations and design information for the method selected. See Part IILD of the permit for specific requirements <br />associated with each method. <br />I N FI LTRATI O NIF I LTRAT ION <br />Calculations are within the Site Storm Water Management Report and part of this SWPPP as Attachment D. <br />3. If it is not feasible to meet the treatment requirement for the water quality volume, describe why. This can include proximity to <br />bedrock or road projects where the lack sof right of way precludes the installation of any permanent stormwater management <br />practices. Describe what other treatment, such as grasses swales, smaller ponds, or grit chambers, will be implemented to <br />treat runoff prior to discharge to surface waters. (iII.C) <br />IT IS FEASIBLE TO MEET REQUIREMENT FOR WATER QUALITY VOLUME. <br />4. For projects that discharge to trout streams, including tributaries to trout streams, identify method of incorporating temperature <br />controls into the permanent stormwater management system. <br />N/A <br />Erosion Prevention Practices (IV.B) <br />Describe the types of temporary erosion prevention BIIfIPs expected to be implemented on this site during construction: <br />1. Describe construction phasing, vegetative buffer strips, horizontal slope grading, and other construction practices to minimize <br />erosion. Delineate areas not to be disturbed (e.g., with flags, stakes, signs, silt fence, etc.) before work begins. <br />SILT FENCE WILL BE INSTALLED AT THE DOWNHILL LOCATIONS OF THE SITE. <br />2. Describe Methods of temporarily stabilizing soils and soil stockpiles (e.g., mulches, hydraulic tackifiers, erosion blankets, etc.): <br />TEMPORARY EROSION PROTECTION WILL BE SEED AND MULCH AND EROSION BLANKETS WHERE REQUIRED, <br />WITH PERMANENT COLTER BEING EITHER SOD OR LANDSCAPE FEATURES. <br />3. Describe Methods of dissipating velocity along stormwater conveyance channels and at channel outlets (e.g., check dams, <br />sediment traps, rip rap, etc.): <br />SOD WILL BE UTILIZED ALONG CHANNELS AND RiP RAP AT CHANNEL OUTLETS. <br />4. Describe Methods to be used for stabilization of ditch and Swale wetted perimeters (Note that mulch, hydraulic soil tackfiers, <br />hydram ulches, etc. are not acceptable soil stabilization methods for any part of a drainage ditch or Swale) <br />FINAL STABILIZATION OF SWALES WILL BE SOD, <br />2, Will the project include use of filters for backwash water? ❑ Yes N No <br />if yes, describe how filter backwash water will be managed on the site or properly disposed (see Part 111.D.3, of the permit)-. <br />Additional BMPs for Special Waters and .Discharges to Wetlands (Appendix A, Parts C and D) <br />1, Special Waters. Does your project discharge to special waters' ❑ Yes N No <br />2. If proximity to bedrock or road projects where the lark of right of way precludes the installation of any of the pennanent <br />stormwater management practices, then other treatment such as grassed swales smaller ponds, or grit chambers €s required <br />9 P 9 P 9 q <br />prior to discharge to surface waters. Describe what other treatment will be provided. <br />N/A <br />3. Describe erosion and sediment controls for exposed soil areas with a continuous positive slope to a special waters, and <br />temporary sediment basins for areas that drain five or more acres disturbed at one time - <br />N/A <br />4. Describe the undisturbed buffer zone to be used (not less than 100 linear feet from the special water). <br />N/A <br />S. Describe how the permanent stormwater management system will ensure that the pre and post project runoff rate and volume <br />from the 1, and 2 -year 24-hour precipitation events remains the same. <br />6. Describe how the permanent stormwater management system will minimize any increase in the temperature of trout stream <br />receiving waters resulting in the 1, and 2 -year 24-hour precipitation events. <br />N/A <br />7. Wetlands, Does your project discharge stormwater with the potential for significant adverse impacts to a wetland (e.g., <br />conversion of a natural wetland to a stormwater pond)? ❑ Yes N No <br />If Yes, describe the wetland mitigation sequence that will be followed in accordance with Part D of Appendix A. <br />N/A <br />Inspections and Maintenance (IV.E) <br />Describe procedures to routinely inspect the construction site: <br />• Once every seven (7) days during active construction and, <br />• Within 24 hours after a rainfall event greater than 0.5 inches in 24 hours, and within seven (7) days after that,. <br />inspections must include stabilized areas, erosion prevention and sediment control BMPs, and infiltration areas. <br />INSPECTOR WILL FOLLOW REQUIREMENTS SPECIFIED ABOVE AND FILL OUT "ATTACHMENT B - CONSTRUCTION <br />STORMWATER INSPECTION CHECKLIST." <br />www.pca.state.mn.us 651-296-6300 - 800-657-3864 . TTY 651-282.5332 or 800-657-3864 - Available in alternative formats www.pca.state.mn-us - 651-296-6300 - 800-657-3864 . TTY 651-282.5332 or 800-657-3854 - Available in alternative formats <br />wq•strm2.12 • 4113109&8116113 Page 4 of 7 wq-strm2-12 • 4113109 fr 8116173 Page 6 of 7 <br />c`7 <br />to <br />L() <br />O <br />0 <br />O <br />LUU <br />J <br />tl <br />O <br />O <br />O <br />C) <br />Ln <br />J � <br />M <br />J to <br />Li') <br />Z <br />Z Y <br />W z <br />2° <br />a. LUZ <br />Z <br />O <br />J2i <br />Wt -6Q0 <br />N <br />W w <br />U) <br />U <br />W a <br />W z <br />Lf') <br />QN <br />Lf) <br />d' <br />J <br />I HEREBY CERTIFY THAT THIS PLAN, <br />SPECIFICATION, OR REPORT WAS <br />PREPARED BY ME OR UNDER MY DIRECT <br />SUPERVISION AND THAT I AM A DULY <br />LICENSED PROFESSIONAL ENGINEER <br />UNDER THE LAWS OF THE STATE OF <br />MINNESOTA. <br />- Matthew R. Pavek <br />DATE 07/19/17 LICENSE NO. 44263 <br />ISSUE/SUBMITTAL SUMMARY <br />REVISION SUMMARY <br />PROJECT NO.: 17059 <br />PRELIMINARY SWPPP <br />- ATTACHMENTS <br />SW1 m4 <br />©COPYRIGHT 2017 CIVIL SITE GROUP INC. <br />