GENERAL SWPPP REQUIREMENTS AND NOTES:
<br />THE CONTRACTOR AND ALL SUBCONTRACTORS INVOLVED WITH A CONSTRUCTION ACTIVITY THAT DISTURBS SITE SOIL OR WHO IMPLEMENT A POLLUTANT CONTROL
<br />MEASURE IDENTIFIED IN THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) MUST COMPLY WITH THE REQUIREMENTS OF THE NATIONAL POLLUTION
<br />DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL PERMIT (DATED AUGUST 1, 2013 # MNR100001 PAGES 1-35) AND ANY LOCAL GOVERNING AGENCY HAVING
<br />JURISDICTION CONCERNING EROSION AND SEDIMENTATION CONTROL.
<br />PART III STORMWATER DISCHARGE DESIGN REQUIREMENTS
<br />SWPPP (PART III.A)
<br />THE NATURE OF THIS PROJECT WILL BE CONSISTENT WITH WHAT IS REPRESENTED IN THIS SET OF CONSTRUCTION PLANS AND SPECIFICATIONS. SEE THE SWPPP
<br />PLAN SHEETS AND SWPPP NARRATIVE (ATTACHMENT A: CONSTRUCTION SWPPP TEMPLATE) FOR ADDITIONAL SITE SPECIFIC SWPPP INFORMATION. THE PLANS
<br />SHOW LOCATIONS AND TYPES OF ALL TEMPORARY AND PERMANENT EROSION PREVENTION AND SEDIMENT CONTROL BMP'S. STANDARD DETAILS ARE ATTACHED TO
<br />THIS SWPPP DOCUMENT.
<br />THE INTENDED SEQUENCING OF MAJOR CONSTRUCTION ACTIVITIES IS AS FOLLOWS:
<br />1. INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCE
<br />2. INSTALLATION OF SILT FENCE AROUND SITE
<br />3. INSTALL ORANGE CONSTRUCTION FENCING AROUND INFILTRATION AREAS.
<br />4. CLEAR AND GRUB FOR TEMPORARY SEDIMENT BASIN / POND INSTALL
<br />5. CONSTRUCT TEMPORARY SEDIMENT BASIN / POND (PART 111.6)
<br />6. CLEAR AND GRUB REMAINDER OF SITE
<br />7. STRIP AND STOCKPILE TOPSOIL
<br />8. ROUGH GRADING OF SITE
<br />9. STABILIZE DENUDED AREAS AND STOCKPILES
<br />10. INSTALL SANITARY SEWER, WATER MAIN STORM SEWER AND SERVICES
<br />11. INSTALL SILT FENCE / INLET PROTECTION AROUND CB'S
<br />12. INSTALL STREET SECTION
<br />13. INSTALL CURB AND GUTTER
<br />14. BITUMINOUS ON STREETS
<br />15. FINAL GRADE BOULEVARD, INSTALL SEED AND MULCH
<br />16. REMOVE ACCUMULATED SEDIMENT FROM BASIN / POND
<br />17. FINAL GRADE POND / INFILTRATION BASINS (DO NOT COMPACT SOILS IN INFILTRATION AREAS.) (PART III.C)
<br />18. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED BY EITHER SEED OR SOD/LANDSCAPING, REMOVE SILT FENCE AND RESEED ANY
<br />AREAS DISTURBED BY THE REMOVAL.
<br />RECORDS RETENTION (PART III.E):
<br />THE SWPPP (ORIGINAL OR COPIES) INCLUDING, ALL CHANGES TO IT, AND INSPECTIONS AND MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING
<br />CONSTRUCTION BY THE PERMITTEE WHO HAS OPERATIONAL CONTROL OF THAT PORTION OF THE SITE. THE SWPPP CAN BE KEPT IN EITHER THE FIELD OFFICE OR IN
<br />AN ON SITE VEHICLE DURING NORMAL WORKING HOURS.
<br />ALL OWNER(S) MUST KEEP THE SWPPP, ALONG WITH THE FOLLOWING ADDITIONAL RECORDS, ON FILE FOR THREE (3) YEARS AFTER SUBMITTAL OF THE NOT AS
<br />OUTLINED IN PART II.C. THIS DOES NOT INCLUDE ANY RECORDS AFTER SUBMITTAL OF THE NOT.
<br />1. THE FINAL SWPPP;
<br />2. ANY OTHER STORMWATER RELATED PERMITS REQUIRED FOR THE PROJECT;
<br />3. RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION (SEE PART IV.E. INSPECTIONS AND MAINTENANCE);
<br />4. ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED, INCLUDING ALL RIGHT OF WAY, CONTRACTS, COVENANTS AND
<br />OTHER BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCE; AND
<br />5. ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STORMWATER MANAGEMENT SYSTEMS.
<br />SWPPP IMPLEMENTATION RESPONSIBILITIES:
<br />1. THE OWNER AND CONTRACTOR ARE PERMITTEE(S) AS IDENTIFIED BY THE NPDES PERMIT.
<br />2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ON-SITE IMPLEMENTATION OF THE SWPPP, INCLUDING THE ACTIVITIES OF ALL OF THE CONTRACTOR'S
<br />SUBCONTRACTORS.
<br />3. CONTRACTOR SHALL PROVIDE A PERSON(S) KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF EROSION PREVENTION AND SEDIMENT CONTROL
<br />BMPS TO OVERSEE ALL INSTALLATION AND MAINTENANCE OF BMPS AND IMPLEMENTATION OF THE SWPPP.
<br />4. CONTRACTOR SHALL PROVIDE PERSON(S) MEETING THE TRAINING REQUIREMENTS OF THE NPDES PERMIT TO CONDUCT INSPECTION AND MAINTENANCE OF
<br />ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS IN ACCORDANCE WITH THE REQUIREMENTS OF THE PERMIT. ONE OF THESE INDIVIDUAL(S) MUST BE
<br />AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY MPCA. CONTRACTOR SHALL PROVIDE TRAINING DOCUMENTATION FOR THESE
<br />INDIVIDUAL() AS REQS UIRED BY THE NPDES PERMIT. THIS TRAINING DOCUMENTATION SHALL BE RECORDED IN OR WITH THE SWPPP BEFORE THE START OF
<br />CONSTRUCTION OR AS SOON AS THE PERSONNEL FOR THE PROJECT HAVE BEEN DETERMINED. DOCUMENTATION SHALL INCLUDE:
<br />4.1. NAMES OF THE PERSONNEL ASSOCIATED WITH THE PROJECT THAT ARE REQUIRED TO BE TRAINED PER PART III.F.1 OF THE PERMIT.
<br />4.2. DATES OF TRAINING AND NAME OF INSTRUCTOR AND ENTITY PROVIDING TRAINING.
<br />4.3. CONTENT OF TRAINING COURSE OR WORKSHOP INCLUDING THE NUMBER OF HOURS OF TRAINING.
<br />5. FOLLOWING FINAL STABILIZATION AND THE TERMINATION OF COVERAGE FOR THE NPDES PERMIT, THE OWNER IS EXPECTED TO FURNISH LONG TERM
<br />OPERATION AND MAINTENANCE (0 & M) OF THE PERMANENT STORM WATER MANAGEMENT SYSTEM.
<br />PART IV. CONSTRUCTION ACTIVITY REQUIREMENTS
<br />CONSTRUCTION ACTIVITY FIELD REQUIREMENTS:
<br />1. ALL FIELD REQUIREMENTS SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THE NPDES PERMIT AND STORMWATER POLLUTION
<br />PREVENTION PLAN (SWPPP).
<br />2. THE CONTRACTOR MUST IMPLEMENT THE SWPPP AND PROVIDE BMPS IDENTIFIED IN THE SWPPP IN AN APPROPRIATE AND FUNCTION MANNER.
<br />3. THE CONTRACTOR SHALL RESPOND TO CHANGING SITE CONDITIONS AND IMPLEMENT/SUPPLEMENT EROSION PREVENTION AND SEDIMENT CONTROL
<br />MEASURES UTILIZED TO PROVIDE ADEQUATE PROTECTION OF DISTURBED SOILS AND ADEQUATE PREVENTION OF SEDIMENT TRANSPORT OFF-SITE. AT A
<br />MINIMUM, THE FOLLOWING STORMWATER POLLUTION PREVENTION CONSTRUCTION ACTIVITY FIELD REQUIREMENTS SHALL BE FURNISHED BY THE
<br />CONTRACTOR.
<br />EROSION PREVENTION (PART IV.B):
<br />THE CONTRACTOR IS RESPONSIBLE FOR PLANING FOR AND IMPLEMENTING APPROPRIATE CONSTRUCTION PHASING, VEGETATIVE BUFFER STRIPS, HORIZONTAL
<br />SLOPE GRADING, AND OTHER CONSTRUCTION PRACTICES THAT MINIMIZE EROSION, SO THAT THE INSPECTION AND MAINTENANCE REQUIREMENTS OF PART IV.E
<br />ARE COMPLIED WITH. THE LOCATION OF AREAS NOT TO BE DISTURBED MUST BE DELINEATED (E.G. WITH FLAGS, STAKES, SIGNS, SILT FENCE ETC.) ON THE
<br />DEVELOPMENT SITE BEFORE WORK BEGINS.
<br />ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO LIMIT SOIL EROSION BUT NO LATER THAN THE END OF THE NEXT WORK DAY WHEN
<br />EARTH -DISTURBING ACTIVITIES WILL CEASE FOR AT LEAST 14 DAYS. TEMPORARY STOCKPILES WITHOUT SIGNIFICANT SILT, CLAY OR ORGANIC COMPONENTS (E.G.,
<br />CLEAN AGGREGATE STOCKPILES, DEMOLITION CONCRETE STOCKPILES, SAND STOCKPILES) AND THE CONSTRUCTED BASE COMPONENTS OF ROADS, PARKING LOTS
<br />AND SIMILAR SURFACES ARE EXEMPT FROM THIS REQUIREMENT BUT MUST COMPLY WITH PART IV.C.5.
<br />SOILS WITHIN 200 FEET OF A PUBLIC WATER (AS DESIGNATED BY THE MINNESOTA DNR) MUST BE STABILIZED WITHIN 24 HOURS DURING FISH SPAWNING TIMES.
<br />THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE THAT DRAINS WATER FROM ANY PORTION OF THE
<br />CONSTRUCTION SITE, OR DIVERTS WATER AROUND THE SITE, MUST BE STABILIZED WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF
<br />DISCHARGE INTO ANY SURFACE WATER. STABILIZATION OF THE LAST 200 LINEAL FEET MUST BE COMPLETED WITHIN 24 HOURS AFTER CONNECTING TO A SURFACE
<br />WATER.
<br />STABILIZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY OR PERMANENT DITCHES OR SWALES MUST BE COMPLETE WITHIN 14 DAYS AFTER CONNECTING
<br />TO A SURFACE WATER AND CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY OR PERMANENTLY CEASED.
<br />TEMPORARY OR PERMANENT DITCHES OR SWALES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT SYSTEM (WITH PROPERLY DESIGNED ROCK DITCH
<br />CHECKS, BIO ROLLS, SILT DIKES ETC.) DO NOT NEED TO BE STABILIZED. THESE AREAS MUST BE STABILIZED WITHIN 24 HOURS AFTER NO LONGER BEING USED AS A
<br />SEDIMENT CONTAINMENT SYSTEM.
<br />PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS AFTER CONNECTION TO A SURFACE WATER.
<br />SEED NOTES (PART III.A,4.A):
<br />ALL SEED MIXES AND APPLICATION SHALL BE IN ACCORDANCE WITH THE MNDOT SEEDING MANUAL.
<br />GENERAL RECOMMENDATIONS:
<br />IMMEDIATELY BEFORE SEEDING THE SOIL SHALL BE TILLED TO A MINIMUM DEPTH OF 3 INCHES.
<br />TEMPORARY EROSION CONTROL SEEDING, MULCHING & BLANKET.
<br />SEED
<br />• TEMPORARY SEED SHALL BE MNDOT SEED MIX 21-112 (WINTER WHEAT COVER CROP) FOR WINTER AND 21-111 (OATS COVER CROP) FOR SPRING/SUMMER
<br />APPLICATIONS. BOTH SEED MIXES SHALL BE APPLIED AT A SEEDING RATE OF 100 LBS/ACRE.
<br />MULCH
<br />• IMMEDIATELY AFTER SEEDING, WITHIN 24 HOURS, MNDOT TYPE 1 MULCH SHOULD BE APPLIED TO PROTECT AND ENHANCE SEED GERMINATION. MULCH SHALL
<br />BE APPLIED AT 90% COVERAGE (2 TONS PER ACRE OF STRAW MULCH)
<br />SLOPES
<br />• 3:1 (HORIZIVERT.) OR FLATTER MUCH SHALL BE COVERED WITH MULCH
<br />• SLOPES STEEPER THAN 3:1 OR DITCH BOTTOMS SHALL BE COVERED WITH EROSION CONTROL BLANKET.
<br />• SEE PLAN FOR MORE DETAILED DITCH AND STEEP SLOPE EROSION CONTROL TREATMENTS.
<br />SEDIMENT CONTROL (PART IV.C):
<br />SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT FROM ENTERING SURFACE WATERS, INCLUDING CURB AND GUTTER SYSTEMS AND STORM SEWER
<br />INLETS.
<br />a. TEMPORARY OR PERMANENT DRAINAGE DITCHES AND SEDIMENT BASINS THAT ARE DESIGNED AS PART OF A SEDIMENT CONTAINMENT SYSTEM (E.G.,
<br />DITCHES WITH ROCK CHECK DAMS) REQUIRE SEDIMENT CONTROL PRACTICES ONLY AS APPROPRIATE FOR SITE CONDITIONS.
<br />b. IF THE DOWN GRADIENT TREATMENT SYSTEM IS OVERLOADED, ADDITIONAL UPGRADIENT SEDIMENT CONTROL PRACTICES OR REDUNDANT BMPS MUST BE
<br />INSTALLED TO ELIMINATE THE OVERLOADING, AND THE SWPPP MUST BE AMENDED TO IDENTIFY THESE ADDITIONAL PRACTICES AS REQUIRED IN PART III.A.4,
<br />A. THROUGH C.
<br />c. IN ORDER TO MAINTAIN SHEET FLOW AND MINIMIZE RILLS AND/OR GULLIES, THERE SHALL BE NO UNBROKEN SLOPE LENGTH OF GREATER THAN 75 FEET FOR
<br />SLOPES WITH A GRADE OF 3:1 OR STEEPER.
<br />SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON ALL DOWN GRADIENT PERIMETERS BEFORE ANY UPGRADIENT LAND DISTURBING ACTIVITIES BEGIN
<br />THESE PRACTICES SHALL REMAIN IN PLACE UNTIL FINAL STABILIZATION HAS BEEN ESTABLISHED IN ACCORDANCE WITH PART IV.G.
<br />THE TIMING OF THE INSTALLATION OF SEDIMENT CONTROL PRACTICES MAY BE ADJUSTED TO ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR
<br />GRUBBING, OR PASSAGE OF VEHICLES. ANY SHORT-TERM ACTIVITY MUST BE COMPLETED AS QUICKLY AS POSSIBLE AND THE SEDIMENT CONTROL PRACTICES
<br />MUST BE INSTALLED IMMEDIATELY AFTER THE ACTIVITY IS COMPLETED. HOWEVER, SEDIMENT CONTROL PRACTICES MUST BE INSTALLED BEFORE THE NEXT
<br />PRECIPITATION EVENT EVEN IF THE ACTIVITY IS NOT COMPLETE.
<br />ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE BMPS DURING CONSTRUCTION UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE
<br />INLET HAVE BEEN STABILIZED. INLET PROTECTION MAY BE REMOVED FOR A PARTICULAR INLET IF A SPECIFIC SAFETY CONCERN (STREET FLOODING/FREEZING) HAS
<br />BEEN IDENTIFIED AND THE PERMITTEE(S) HAVE RECEIVED WRITTEN CORRESPONDENCE FROM THE JURISDICTIONAL AUTHORITY (E.G.
<br />CITY/COUNTY/TOWNSHIP/MNDOT ENGINEER) VERIFYING THE NEED FOR REMOVAL. THE WRITTEN CORRESPONDENCE MUST BE DOCUMENTED IN THE SWPPP OR
<br />AVAILABLE WITHIN 72 HOURS UPON REQUEST. WHEN WRITTEN CORRESPONDENCE CAN NOT BE OBTAINED IN A TIMELY MANNER, THE SPECIFIC INLET PROTECTION
<br />CAN BE REMOVED TO ALLEVIATE THE IMMEDIATE SAFETY CONCERN. HOWEVER, EFFORTS TO OBTAIN WRITTEN CORRESPONDENCE MUST BE DOCUMENTED IN THE
<br />SWPPP AND AVAILABLE WITHIN 72 HOURS UPON REQUEST. PERMISSION TO REMOVE INLET PROTECTION BASED ON A SPECIFIC SAFETY CONCERN MUST STILL BE
<br />OBTAINED FROM THE JURISDICTIONAL AUTHORITY WITHIN 30 DAYS OF REMOVAL.
<br />TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS, AND
<br />CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR CONDUITS AND DITCHES UNLESS
<br />THERE IS A BYPASS IN PLACE FOR THE STORMWATER.
<br />VEHICLE TRACKING OF SEDIMENT FROM THE CONSTRUCTION SITE (OR ONTO STREETS WITHIN THE SITE) MUST BE MINIMIZED BY BMPS SUCH AS STONE PADS,
<br />CONCRETE OR STEEL WASH RACKS, OR EQUIVALENT SYSTEMS. STREET SWEEPING MUST BE USED IF SUCH BMPS ARE NOT ADEQUATE TO PREVENT SEDIMENT
<br />FROM BEING TRACKED ONTO THE STREET (SEE PART IV.E.4.D.).
<br />THE PERMITEE MUST MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. MINIMIZING SOIL COMPACTION IS NOT REQUIRED WHERE THE
<br />FUNCTION OF THE SPECIFIC AREA OF THE SITE DICTATES THAT IT BE COMPACTED. METHODS FOR MINIMIZING COMPACTION INCLUDE THE USE OF TRACKED
<br />EQUIPMENT, AND STAYING OFF OF AREAS TO BE LEFT UN -COMPACTED. METHODS TO PRESERVE TOPSOIL INCLUDE STRIPPING AND STOCKPILING TOPSOIL PRIOR
<br />TO GRADING OR EXCAVATION OPERATIONS.
<br />THE PERMITTEE MUST INSTALL TEMPORARY SEDIMENTATION BASINS AS REQUIRED IN PART III.B. OF THIS PERMIT
<br />DEWATERING AND BASIN DRAINING (PART IV.D)
<br />DEWATERING OR BASIN DRAINING (E.G., PUMPED DISCHARGES, TRENCH/DITCH CUTS FOR DRAINAGE) RELATED TO THE CONSTRUCTION ACTIVITY THAT MAY HAVE
<br />TURBID OR SEDIMENT LADEN DISCHARGE WATER MUST BE DISCHARGED TO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN ON THE PROJECT SITE
<br />WHENEVER POSSIBLE. IF THE WATER CANNOT BE DISCHARGED TO A SEDIMENTATION BASIN PRIOR TO ENTERING THE SURFACE WATER, IT MUST BE TREATED WITH
<br />THE APPROPRIATE BMP'S SUCH THAT THE DISCHARGE DOES NOT ADVERSELY AFFECT THE RECEIVING WATER, DOWNSTREAM LANDOWNERS OR WETLANDS. THE
<br />CONTRACTOR MUST ENSURE THAT DISCHARGE POINTS ARE ADEQUATELY PROTECTED FROM EROSION AND SCOUR. THE DISCHARGE MUST BE DISPERSED OVER
<br />NATURAL ROCK RIPRAP, SAND BAGS, PLASTIC SHEATHING OR OTHER ACCEPTED ENERGY DISSIPATION MEASURES. ADEQUATE SEDIMENTATION CONTROL
<br />MEASURES ARE REQUIRED FOR DISCHARGE WATER THAT CONTAINS SUSPENDED SOLIDS.
<br />FILTER BACKWASH WATERS MUST BE HAULED AWAY FOR DISPOSAL, RETURNED TO THE BEGINNING OF THE TREATMENT PROCESS, OR INCORPORATE INTO THE
<br />SITE IN A MANNER THAT DOES NOT CAUSE EROSION. DISCHARGE OF THE BACKWASH WATER TO SANITARY SEWER IS ALLOWED WITH PERMISSION OF THE SANITARY
<br />SEWER AUTHORITY.
<br />INSPECTIONS AND MAINTENANCE (PART IV.E):
<br />THE CONTRACTOR IS RESPONSIBLE AT ALL TIMES FOR THE MAINTENANCE AND PROPER OPERATION OF EROSION AND SEDIMENT CONTROL FACILITIES. THE
<br />CONTRACTOR SHALL AT A MINIMUM, INSPECT, MAINTAIN AND REPAIR ALL DISTURBED SURFACES AND ALL EROSION AND SEDIMENT CONTROL FACILITIES AND SOIL
<br />STABILIZATION MEASURES ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS FOLLOWING A RAINFALL OF 0.5 INCHES OR
<br />GREATER AND WITHIN 7 DAYS AFTER THAT. CONTINUE INSPECTION ACTIVITIES UNTIL LAND -DISTURBING ACTIVITY HAS CEASED. THEREAFTER THE CONTRACTOR
<br />SHALL PERFORM THESE RESPONSIBILITIES AT LEAST WEEKLY UNTIL VEGETATIVE COVER IS ESTABLISHED. INSPECTIONS MUST INCLUDE STABILIZED AREAS,
<br />EROSION PREVENTION AND SEDIMENT CONTROL BMP'S AND INFILTRATION AREAS.
<br />BASED ON INSPECTION RESULTS THECONTRACTOR MAY MODIFY THE SWPPP IN ORDER TO PREVENT POLLUTANTS FROM LEAVING THE SITE VIA STORM WATER
<br />RUNOFF. THIS MODIFICATION MUST BE MADE WITHIN 7 CALENDAR DAYS OF THE INSPECTION UNLESS OTHERWISE REQUIRED BY THE TERMS OF THE PERMIT, LEGAL,
<br />REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS.
<br />INSPECTION REPORTS MUST BE RECORDED WITHIN 24 HOURS IN WRITING AND KEPT ON FILE BY THE CONTRACTOR AS AN INTEGRAL PART OF THE SWPPP ON SITE
<br />AND THEN FOR AT LEAST 3 YEARS FROM THE DATE OF COMPLETION OF THIS PROJECT.
<br />ALL PERIMETER CONTROL DEVICES MUST BE REPAIRED, REPLACED OR SUPPLEMENTED WHEN THEY BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES 1/2 OF
<br />THE HEIGHT OF THE DEVICE. THESE REPAIRS MUST BE MADE BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY, OR THEREAFTER AS SOON AS FIELD
<br />CONDITIONS ALLOW ACCESS.
<br />REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS, AND
<br />RESTABILIZE THE AREAS WHERE SEDIMENT REMOVAL RESULTS IN EXPOSED TOPSOIL. THIS REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN 7 DAYS OF
<br />DISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS.
<br />SEE (ATTACHMENT A: CONSTRUCTION SWPPP TEMPLATE) FOR SITE SPECIFIC INSPECTIONS AND MAINTENANCE REQUIREMENTS.
<br />POLLUTION PREVENTION MANAGEMENT (PART IV.F):
<br />THE CONTRACTOR SHALL IMPLEMENT THE FOLLOWING POLLUTION PREVENTION MANAGEMENT MEASURES ON THE SITE;
<br />SOLID WASTE: COLLECTED SEDIMENT, ASPHALT AND CONCRETE MILLINGS, FLOATING DEBRIS, PAPER, PLASTIC, FABRIC, CONSTRUCTION AND DEMOLITION DEBRIS
<br />AND OTHER WASTES MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH MINNESOTA POLLUTION CONTROL AGENCY (MPCA) DISPOSAL REQUIREMENTS.
<br />HAZARDOUS MATERIALS: OIL, GASOLINE, PAINT AND ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED, INCLUDING SECONDARY CONTAINMENT, TO
<br />PREVENT SPILLS, LEAKS OR OTHER DISCHARGE. RESTRICTED ACCESS TO STORAGE AREAS MUST BE PROVIDED TO PREVENT VANDALISM. STORAGE AND DISPOSAL
<br />OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH MPCA REGULATIONS.
<br />EXTERNAL WASHING OF TRUCKS AND OTHER CONSTRUCTION VEHICLES MUST BE LIMITED TO A DEFINED AREA OF THE SITE. RUNOFF MUST BE CONTAINED AND
<br />WASTEWATER PROPERLY DISPOSED OF. NO ENGINE DEGREASING IS ALLOWED ON SITE.
<br />CONCRETE WASHOUT: ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK PROOF CONTAINMENT
<br />FACILITY OR IMPERMEABLE LINER. A COMPACTED CLAY LINER THAT DOES NOT ALLOW WASHOUT LIQUIDS TO ENTER THE GROUND IS CONSIDERED AN IMPERMEABLE
<br />LINER. THE LIQUID AND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETE WASHOUT OPERATIONS OR
<br />AREAS. LIQUID AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO
<br />EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. CONCRETE WASHOUT MAY ALSO OCCUR OFF SITE
<br />ACCORDING TO THE APPROPRIATE REGULATIONS.
<br />FUELING OPERATION PLAN: ALL FUELING SHALL TAKE PLACE AT THE DESIGNATED FUELING LOCATION AND ACCORDING TO BEST PRACTICES FOR SITE FUELING
<br />OPERATIONS AS TO MINIMIZE THE POTENTIAL FOR SPILLS.
<br />SPILL PREVENTION PLAN: ALL SPILLS SHALL BE IMMEDIATELY CLEANED UP AFTER DISCOVERY. THE SITE SUPERINTENDENT, WHO IS RESPONSIBLE FOR DAY-TO-DAY
<br />ONSITE CONSTRUCTION OPERATIONS WILL BE THE SPILL PREVENTION COORDINATOR AND WILL BE RESPONSIBLE FOR IMPLEMENTING CLEAN UP PROCEDURES,
<br />POSTING CLEAN UP RECOMMENDATIONS, AND ENSURING PROPER CLEAN UP TRAINING OF APPROPRIATE PERSONNEL.
<br />SANITARY AND SEPTIC WASTE: SANITARY/SEPTIC FACILITIES SHALL BE PROVIDED AND MAINTAINED IN A NEAT AND SANITARY CONDITION, FOR THE USE OF THE
<br />CONTRACTOR'S EMPLOYEES. A LICENSED SANITARY WASTE MANAGEMENT CONTRACTOR AS REQUIRED BY STATE REGULATIONS WILL COLLECT SANITARY WASTE
<br />FROM PORTABLE UNITS.
<br />FINAL STABILIZATION (PART IV.G):
<br />THE CONTRACTOR MUST ENSURE FINAL STABILIZATION OF THE SITE ACCORDING THE DEFINITIONS IN THE NPDES GENERAL PERMIT PART IV SECTION G. THE
<br />CONTRACTOR MUST SUBMIT A NOTICE OF TERMINATION (N.O.T.) WITHIN 30 DAYS AFTER FINAL STABILIZATION IS COMPLETE OR WITHIN 7 DAYS AFTER SELLING THE
<br />SITE OR PORTION OF THE SITE (THAT HAS NOT UNDERGONE FINAL STABILIZATION) TO ANOTHER PARTY. A COPY OF THIS NOTICE OF TERMINATION / PERMIT
<br />MODIFICATION FORM MUST GO TO THE NEW OWNER. THE ORIGINAL CURRENT OWNER MUST PROVIDE A SWPPP TO THE NEW OWNER THAT SPECIFICALLY
<br />ADDRESSES THE REMAINING CONSTRUCTION ACTIVITY. SEE THE SWPPP PLAN SHEETS AND SWPPP NARRATIVE (ATTACHMENT A: CONSTRUCTION SWPPP
<br />TEMPLATE) AND SWPPP PLAN SHEETS FOR FINAL STABILIZATION MEASURES
<br />I of TA 10 110 0-110110
<br />ML La 2 11 WTIVA
<br />DESIGN ENGINEER: MATTHEW R. PAVEK P.E.
<br />TRAINING COURSE: DESIGN OF SWPPP
<br />TRAINING ENTITY: UNIVERSITY OF MINNESOTA
<br />INSTRUCTOR: JOHN CHAPMAN
<br />DATES OF TRAINING COURSE: 5/15/2011 - 5/16/2011
<br />TOTAL TRAINING HOURS: 12
<br />RE -CERTIFICATION: 1/13/14-1/13/14 (8 HOURS), EXP. 5/31/2017
<br />OWNER INFORMATION
<br />LAKE WEST DEVELOPMENT, LLC
<br />14525 HIGHWAY 7, SUITE 265
<br />MINNETONKA, MN 55345
<br />952-653-1359
<br />CONTACT:
<br />CURT FRETHAM
<br />(C�OVHO
<br />SRO�e
<br />Crz M © M P
<br />4931 W. 35TH ST. SUITE 200
<br />ST. LOUIS PARK, MN 55416
<br />CivilSiteGroup.com
<br />Matt Pavek Pat Sarver
<br />763-213-3944 952-250-2003
<br />�EST
<br />AREAS AND QUANTITIES (PART III.A.4.B&C): I LAKE til
<br />►1h 1[dllFit 1[01k1&I
<br />IMPERVIOUS SURFACE
<br />EXISTING CONDITION
<br />EXISTING
<br />0.3%
<br />PROPOSED LOT 1
<br />6,276 SF
<br />PROPOSED LOT 2
<br />OUTLOT A
<br />8,996 SF
<br />DEVELOP
<br />0UTLOTA
<br />2,837 SF
<br />3.0°%
<br />LOT TOTAL ( LOT 1 + LOT 2)
<br />15,272 SF
<br />16.2%
<br />TOTAL (LOT 1 + LOT 2 + OUT LOT A)
<br />BUILDINGCOVERAGE
<br />0 SF
<br />0.0°%
<br />4653 SF
<br />16.0%
<br />7296 SF 12.3%
<br />0 SF
<br />18.9%
<br />*All existing impervious area is owned by the adjacent property owner
<br />ENT
<br />w0.0%
<br />LLC
<br />ALL PAVEMENTS
<br />302 SF
<br />0.3%
<br />1,623 SF
<br />5.6%
<br />1,700 SF 2.9%
<br />2,837 SF 49.4%
<br />ALL PERVIOUS SURFACES
<br />93,778 SF
<br />99.7%
<br />22,827 SF
<br />78.4%
<br />50,243 SF 84.8%
<br />2,901 SF 50.6%
<br />TOTAL SITE AREA
<br />94,080 SF
<br />100.0°/
<br />29,103 SF
<br />100.0°%
<br />59,239 SF 100.0%
<br />5,738 SF 100.0%
<br />IMPERVIOUS SURFACE
<br />EXISTING CONDITION
<br />302 SF
<br />0.3%
<br />PROPOSED CONDITION LOT 1
<br />6,276 SF
<br />6.7%
<br />PROPOSED CONDITION LOT2
<br />8,996 SF
<br />9.6%
<br />0UTLOTA
<br />2,837 SF
<br />3.0°%
<br />LOT TOTAL ( LOT 1 + LOT 2)
<br />15,272 SF
<br />16.2%
<br />TOTAL (LOT 1 + LOT 2 + OUT LOT A)
<br />18,109 SF
<br />19.2%
<br />LOT DIFFERENCE (EX. VS PROP.)
<br />14,970 SF
<br />15.9%
<br />TOTAL DIFFERENCE (EX. VS PROP.)
<br />17,807 SF
<br />18.9%
<br />*All existing impervious area is owned by the adjacent property owner
<br />EROSION CONTROL QUANTITIES
<br />DISTURBED AREA 74,000 SF
<br />SILT FENCE/BIO-ROLL 2,700 LF
<br />EROSION CONTROL BLANKET 0 SF
<br />INLETPROTECTION DEVICES ±0 EA
<br />NOTE: QUANTITIES ARE FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR SHALL DETERMINE FOR THEMSELVES THE EXACT
<br />QUANTITIES FOR BIDDING AND CONSTRUCTION.
<br />CONTRACTOR: SWPPP INSPECTOR TRAINING:
<br />ALL SWPPP INSPECTIONS MUST BE PERFORMED BY A
<br />PERSON THAT MEETS THE TRAINING REQUIREMENTS OF THE
<br />NPDES CONSTRUCTION SITE PERMIT.
<br />TRAINING CREDENTIALS SHALL BE PROVIDED BY THE
<br />CONTRACTOR AND KEPT ON SITE WITH THE SWPPP
<br />PARTY RESPONSIBLE FOR LONG TERM OPERATION AND MAINTENANCE OF PERMANENT
<br />STORM WATER MANAGEMENT SYSTEM
<br />PERMANENT STORMWATER MANAGEMENT IS NOT REQUIRED AS PART OF THIS PROJECT TO MEET NPDES PERMIT REQUIREMENTS. THE
<br />PROPERTY OWNER IS RESPONSIBLE FOR THE LONG TERM OPERATION AND MAINTENANCE OF THE PROPOSED STORMWATER SYSTEM.
<br />SWPPP ATTACHMENTS (ONLY APPLICABLE IF SITE IS 1 ACRE OR GREATER):
<br />CONTRACTOR SHALL OBTAIN A COPY OF THE FOLLOWING SWPPP ATTACHMENTS WHICH ARE A PART OF THE OVERALL SWPPP PACKAGE:
<br />ATTACHMENT A. CONSTRUCTION SWPPP TEMPLATE - SITE SPECIFIC SWPPP DOCUMENT
<br />ATTACHMENT B. CONSTRUCTION STORMWATER INSPECTION CHECKLIST
<br />ATTACHMENT C. MAINTENANCE PLAN FOR PERMANENT STORM WATER TREATMENT SYSTEMS
<br />ATTACHMENT D: STORMWATER MANAGEMENT REPORT - ON FILE AT THE OFFICE OF PROJECT ENGINEER. AVAILABLE UPON REQUEST.
<br />ATTACHMENT E: GEOTECHNICAL EVALUATION REPORT - ON FILE AT THE OFFICE OF PROJECT ENGINEER. AVAILABLE UPON REQUEST.
<br />SUPPLEMENTARY SITE SPECIFIC EROSION CONTROL NOTES:
<br />THESE NOTES SUPERCEDE ANY GENERAL SWPPP NOTES.
<br />THIS PROJECT IS GREATER THAN 1.0 ACRES SO AN NPDES PERMIT IS REQUIRED AN MUST BE SUBMITTED TO THE MPCA. THE CONTRACTOR IS
<br />REQUIRED TO FOLLOW THE GUIDELINES IN THE NPDES PERMIT THROUGHOUT CONSTRUCTION.
<br />PROJECT NARRATIVE:
<br />PROJECT IS A REDEVELOPMENT OF AN EXISTING VACANT SITE WITH EXTENSIVE TREE GROWTH INTO A RESIDENTIAL SITE WITH 2 SINGLE FAMILY
<br />HOMES. SITE AND LANDSCAPE IMPROVEMENTS WILL OCCUR.
<br />SPECIAL TMDL BMP REQUIREMENTS SITE SPECIFIC (IF REQUIRED):
<br />1. DURING CONSTRUCTION:
<br />A. STABILIZATION OF ALL EXPOSED SOIL AREAS MUST BE INITIATED IMMEDIATELY TO LIMIT SOIL EROSION BUT IN NO CASE COMPLETED
<br />LATER THAN SEVEN (7) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY
<br />CEASED.
<br />B. TEMPORARY SEDIMENT BASIN REQUIREMENTS DESCRIBED IN PART III.C. MUST BE USED FOR COMMON DRAINAGE LOCATIONS THAT
<br />SERVE AN AREA WITH FIVE (5) OR MORE ACRES DISTURBED AT ONE TIME.
<br />2. POST CONSTRUCTION:THE WATER QUALITY VOLUME THAT MUST BE RETAINED ON SITE BY THE PROJECT'S PERMANENT STORMWATER
<br />MANAGEMENT SYSTEM DESCRIBED IN PART III.D. SHALL BE ONE (1) INCH OF RUNOFF FROM THE NEW IMPERVIOUS SURFACES CREATED BY THE
<br />PROJECT. SEE PART III.D.1. FOR MORE INFORMATION ON INFILTRATION DESIGN, PROHIBITIONS AND APPROPRIATE SITE CONDITIONS.
<br />PERMANENT STABILIZATION NOTES SITE SPECIFIC:
<br />PERMANENT SEED MIX
<br />• FOR THIS PROJECT ALL AREAS THAT ARE NOT TO BE SODDED OR LANDSCAPED SHALL RECEIVE A NATIVE PERMANENT SEED MIX.
<br />of AREAS IN BUFFERS AND ADJACENT TO OR IN WET AREAS MNDOT SEED MIX 33-261 (STORMWATER SOUTH AND WEST) AT 35 LBS PER
<br />ACRE.
<br />•• DRY AREAS MNDOT SEED MIX 35-221 (DRY PRAIRIE GENERAL) AT 40 LBS PER ACRE.
<br />• MAINTENANCE SHALL BE IN ACCORDANCE TO THE MNDOT SEEDING MANUAL.
<br />U
<br />W
<br />O
<br />Of
<br />IL
<br />co
<br />LO
<br />LO
<br />O
<br />O
<br />LUU
<br />O
<br />O
<br />M
<br />Lo
<br />J M
<br />J L0
<br />In
<br />., z
<br />Z
<br />W z
<br />O
<br />LILI
<br />az
<br />O z
<br />J 2
<br />W(D
<br />LoN
<br />W Lu
<br />V♦ ~
<br />W Q
<br />W =
<br />Lo
<br />N
<br />QL0
<br />J
<br />I HEREBY CERTIFY THAT THIS PLAN,
<br />SPECIFICATION, OR REPORT WAS
<br />PREPARED BY ME OR UNDER MY DIRECT
<br />SUPERVISION AND THAT I AM A DULY
<br />LICENSED PROFESSIONAL ENGINEER
<br />UNDER THE LAWS OF THE STATE OF
<br />MINNESOTA.
<br />- Matthew R. Pavek
<br />DATE 07/19/17 LICENSE NO. 44263
<br />ISSUE/SUBMITTAL SUMMARY
<br />REVISION SUMMARY
<br />PROJECT NO.: 17059
<br />PRELIMINARY SWPPP
<br />- NARRATIVE
<br />SW1 3
<br />■
<br />©COPYRIGHT 2017 CIVIL SITE GROUP INC.
<br />
|