Laserfiche WebLink
GENERAL SWPPP REQUIREMENTS AND NOTES: <br />THE CONTRACTOR AND ALL SUBCONTRACTORS INVOLVED WITH A CONSTRUCTION ACTIVITY THAT DISTURBS SITE SOIL OR WHO IMPLEMENT A POLLUTANT CONTROL <br />MEASURE IDENTIFIED IN THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) MUST COMPLY WITH THE REQUIREMENTS OF THE NATIONAL POLLUTION <br />DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL PERMIT (DATED AUGUST 1, 2013 # MNR100001 PAGES 1-35) AND ANY LOCAL GOVERNING AGENCY HAVING <br />JURISDICTION CONCERNING EROSION AND SEDIMENTATION CONTROL. <br />PART III STORMWATER DISCHARGE DESIGN REQUIREMENTS <br />SWPPP (PART III.A) <br />THE NATURE OF THIS PROJECT WILL BE CONSISTENT WITH WHAT IS REPRESENTED IN THIS SET OF CONSTRUCTION PLANS AND SPECIFICATIONS. SEE THE SWPPP <br />PLAN SHEETS AND SWPPP NARRATIVE (ATTACHMENT A: CONSTRUCTION SWPPP TEMPLATE) FOR ADDITIONAL SITE SPECIFIC SWPPP INFORMATION. THE PLANS <br />SHOW LOCATIONS AND TYPES OF ALL TEMPORARY AND PERMANENT EROSION PREVENTION AND SEDIMENT CONTROL BMP'S. STANDARD DETAILS ARE ATTACHED TO <br />THIS SWPPP DOCUMENT. <br />THE INTENDED SEQUENCING OF MAJOR CONSTRUCTION ACTIVITIES IS AS FOLLOWS: <br />1. INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCE <br />2. INSTALLATION OF SILT FENCE AROUND SITE <br />3. INSTALL ORANGE CONSTRUCTION FENCING AROUND INFILTRATION AREAS. <br />4. CLEAR AND GRUB FOR TEMPORARY SEDIMENT BASIN / POND INSTALL <br />5. CONSTRUCT TEMPORARY SEDIMENT BASIN / POND (PART 111.6) <br />6. CLEAR AND GRUB REMAINDER OF SITE <br />7. STRIP AND STOCKPILE TOPSOIL <br />8. ROUGH GRADING OF SITE <br />9. STABILIZE DENUDED AREAS AND STOCKPILES <br />10. INSTALL SANITARY SEWER, WATER MAIN STORM SEWER AND SERVICES <br />11. INSTALL SILT FENCE / INLET PROTECTION AROUND CB'S <br />12. INSTALL STREET SECTION <br />13. INSTALL CURB AND GUTTER <br />14. BITUMINOUS ON STREETS <br />15. FINAL GRADE BOULEVARD, INSTALL SEED AND MULCH <br />16. REMOVE ACCUMULATED SEDIMENT FROM BASIN / POND <br />17. FINAL GRADE POND / INFILTRATION BASINS (DO NOT COMPACT SOILS IN INFILTRATION AREAS.) (PART III.C) <br />18. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED BY EITHER SEED OR SOD/LANDSCAPING, REMOVE SILT FENCE AND RESEED ANY <br />AREAS DISTURBED BY THE REMOVAL. <br />RECORDS RETENTION (PART III.E): <br />THE SWPPP (ORIGINAL OR COPIES) INCLUDING, ALL CHANGES TO IT, AND INSPECTIONS AND MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING <br />CONSTRUCTION BY THE PERMITTEE WHO HAS OPERATIONAL CONTROL OF THAT PORTION OF THE SITE. THE SWPPP CAN BE KEPT IN EITHER THE FIELD OFFICE OR IN <br />AN ON SITE VEHICLE DURING NORMAL WORKING HOURS. <br />ALL OWNER(S) MUST KEEP THE SWPPP, ALONG WITH THE FOLLOWING ADDITIONAL RECORDS, ON FILE FOR THREE (3) YEARS AFTER SUBMITTAL OF THE NOT AS <br />OUTLINED IN PART II.C. THIS DOES NOT INCLUDE ANY RECORDS AFTER SUBMITTAL OF THE NOT. <br />1. THE FINAL SWPPP; <br />2. ANY OTHER STORMWATER RELATED PERMITS REQUIRED FOR THE PROJECT; <br />3. RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION (SEE PART IV.E. INSPECTIONS AND MAINTENANCE); <br />4. ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED, INCLUDING ALL RIGHT OF WAY, CONTRACTS, COVENANTS AND <br />OTHER BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCE; AND <br />5. ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STORMWATER MANAGEMENT SYSTEMS. <br />SWPPP IMPLEMENTATION RESPONSIBILITIES: <br />1. THE OWNER AND CONTRACTOR ARE PERMITTEE(S) AS IDENTIFIED BY THE NPDES PERMIT. <br />2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ON-SITE IMPLEMENTATION OF THE SWPPP, INCLUDING THE ACTIVITIES OF ALL OF THE CONTRACTOR'S <br />SUBCONTRACTORS. <br />3. CONTRACTOR SHALL PROVIDE A PERSON(S) KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF EROSION PREVENTION AND SEDIMENT CONTROL <br />BMPS TO OVERSEE ALL INSTALLATION AND MAINTENANCE OF BMPS AND IMPLEMENTATION OF THE SWPPP. <br />4. CONTRACTOR SHALL PROVIDE PERSON(S) MEETING THE TRAINING REQUIREMENTS OF THE NPDES PERMIT TO CONDUCT INSPECTION AND MAINTENANCE OF <br />ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS IN ACCORDANCE WITH THE REQUIREMENTS OF THE PERMIT. ONE OF THESE INDIVIDUAL(S) MUST BE <br />AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY MPCA. CONTRACTOR SHALL PROVIDE TRAINING DOCUMENTATION FOR THESE <br />INDIVIDUAL() AS REQS UIRED BY THE NPDES PERMIT. THIS TRAINING DOCUMENTATION SHALL BE RECORDED IN OR WITH THE SWPPP BEFORE THE START OF <br />CONSTRUCTION OR AS SOON AS THE PERSONNEL FOR THE PROJECT HAVE BEEN DETERMINED. DOCUMENTATION SHALL INCLUDE: <br />4.1. NAMES OF THE PERSONNEL ASSOCIATED WITH THE PROJECT THAT ARE REQUIRED TO BE TRAINED PER PART III.F.1 OF THE PERMIT. <br />4.2. DATES OF TRAINING AND NAME OF INSTRUCTOR AND ENTITY PROVIDING TRAINING. <br />4.3. CONTENT OF TRAINING COURSE OR WORKSHOP INCLUDING THE NUMBER OF HOURS OF TRAINING. <br />5. FOLLOWING FINAL STABILIZATION AND THE TERMINATION OF COVERAGE FOR THE NPDES PERMIT, THE OWNER IS EXPECTED TO FURNISH LONG TERM <br />OPERATION AND MAINTENANCE (0 & M) OF THE PERMANENT STORM WATER MANAGEMENT SYSTEM. <br />PART IV. CONSTRUCTION ACTIVITY REQUIREMENTS <br />CONSTRUCTION ACTIVITY FIELD REQUIREMENTS: <br />1. ALL FIELD REQUIREMENTS SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THE NPDES PERMIT AND STORMWATER POLLUTION <br />PREVENTION PLAN (SWPPP). <br />2. THE CONTRACTOR MUST IMPLEMENT THE SWPPP AND PROVIDE BMPS IDENTIFIED IN THE SWPPP IN AN APPROPRIATE AND FUNCTION MANNER. <br />3. THE CONTRACTOR SHALL RESPOND TO CHANGING SITE CONDITIONS AND IMPLEMENT/SUPPLEMENT EROSION PREVENTION AND SEDIMENT CONTROL <br />MEASURES UTILIZED TO PROVIDE ADEQUATE PROTECTION OF DISTURBED SOILS AND ADEQUATE PREVENTION OF SEDIMENT TRANSPORT OFF-SITE. AT A <br />MINIMUM, THE FOLLOWING STORMWATER POLLUTION PREVENTION CONSTRUCTION ACTIVITY FIELD REQUIREMENTS SHALL BE FURNISHED BY THE <br />CONTRACTOR. <br />EROSION PREVENTION (PART IV.B): <br />THE CONTRACTOR IS RESPONSIBLE FOR PLANING FOR AND IMPLEMENTING APPROPRIATE CONSTRUCTION PHASING, VEGETATIVE BUFFER STRIPS, HORIZONTAL <br />SLOPE GRADING, AND OTHER CONSTRUCTION PRACTICES THAT MINIMIZE EROSION, SO THAT THE INSPECTION AND MAINTENANCE REQUIREMENTS OF PART IV.E <br />ARE COMPLIED WITH. THE LOCATION OF AREAS NOT TO BE DISTURBED MUST BE DELINEATED (E.G. WITH FLAGS, STAKES, SIGNS, SILT FENCE ETC.) ON THE <br />DEVELOPMENT SITE BEFORE WORK BEGINS. <br />ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO LIMIT SOIL EROSION BUT NO LATER THAN THE END OF THE NEXT WORK DAY WHEN <br />EARTH -DISTURBING ACTIVITIES WILL CEASE FOR AT LEAST 14 DAYS. TEMPORARY STOCKPILES WITHOUT SIGNIFICANT SILT, CLAY OR ORGANIC COMPONENTS (E.G., <br />CLEAN AGGREGATE STOCKPILES, DEMOLITION CONCRETE STOCKPILES, SAND STOCKPILES) AND THE CONSTRUCTED BASE COMPONENTS OF ROADS, PARKING LOTS <br />AND SIMILAR SURFACES ARE EXEMPT FROM THIS REQUIREMENT BUT MUST COMPLY WITH PART IV.C.5. <br />SOILS WITHIN 200 FEET OF A PUBLIC WATER (AS DESIGNATED BY THE MINNESOTA DNR) MUST BE STABILIZED WITHIN 24 HOURS DURING FISH SPAWNING TIMES. <br />THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE THAT DRAINS WATER FROM ANY PORTION OF THE <br />CONSTRUCTION SITE, OR DIVERTS WATER AROUND THE SITE, MUST BE STABILIZED WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF <br />DISCHARGE INTO ANY SURFACE WATER. STABILIZATION OF THE LAST 200 LINEAL FEET MUST BE COMPLETED WITHIN 24 HOURS AFTER CONNECTING TO A SURFACE <br />WATER. <br />STABILIZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY OR PERMANENT DITCHES OR SWALES MUST BE COMPLETE WITHIN 14 DAYS AFTER CONNECTING <br />TO A SURFACE WATER AND CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY OR PERMANENTLY CEASED. <br />TEMPORARY OR PERMANENT DITCHES OR SWALES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT SYSTEM (WITH PROPERLY DESIGNED ROCK DITCH <br />CHECKS, BIO ROLLS, SILT DIKES ETC.) DO NOT NEED TO BE STABILIZED. THESE AREAS MUST BE STABILIZED WITHIN 24 HOURS AFTER NO LONGER BEING USED AS A <br />SEDIMENT CONTAINMENT SYSTEM. <br />PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS AFTER CONNECTION TO A SURFACE WATER. <br />SEED NOTES (PART III.A,4.A): <br />ALL SEED MIXES AND APPLICATION SHALL BE IN ACCORDANCE WITH THE MNDOT SEEDING MANUAL. <br />GENERAL RECOMMENDATIONS: <br />IMMEDIATELY BEFORE SEEDING THE SOIL SHALL BE TILLED TO A MINIMUM DEPTH OF 3 INCHES. <br />TEMPORARY EROSION CONTROL SEEDING, MULCHING & BLANKET. <br />SEED <br />• TEMPORARY SEED SHALL BE MNDOT SEED MIX 21-112 (WINTER WHEAT COVER CROP) FOR WINTER AND 21-111 (OATS COVER CROP) FOR SPRING/SUMMER <br />APPLICATIONS. BOTH SEED MIXES SHALL BE APPLIED AT A SEEDING RATE OF 100 LBS/ACRE. <br />MULCH <br />• IMMEDIATELY AFTER SEEDING, WITHIN 24 HOURS, MNDOT TYPE 1 MULCH SHOULD BE APPLIED TO PROTECT AND ENHANCE SEED GERMINATION. MULCH SHALL <br />BE APPLIED AT 90% COVERAGE (2 TONS PER ACRE OF STRAW MULCH) <br />SLOPES <br />• 3:1 (HORIZIVERT.) OR FLATTER MUCH SHALL BE COVERED WITH MULCH <br />• SLOPES STEEPER THAN 3:1 OR DITCH BOTTOMS SHALL BE COVERED WITH EROSION CONTROL BLANKET. <br />• SEE PLAN FOR MORE DETAILED DITCH AND STEEP SLOPE EROSION CONTROL TREATMENTS. <br />SEDIMENT CONTROL (PART IV.C): <br />SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT FROM ENTERING SURFACE WATERS, INCLUDING CURB AND GUTTER SYSTEMS AND STORM SEWER <br />INLETS. <br />a. TEMPORARY OR PERMANENT DRAINAGE DITCHES AND SEDIMENT BASINS THAT ARE DESIGNED AS PART OF A SEDIMENT CONTAINMENT SYSTEM (E.G., <br />DITCHES WITH ROCK CHECK DAMS) REQUIRE SEDIMENT CONTROL PRACTICES ONLY AS APPROPRIATE FOR SITE CONDITIONS. <br />b. IF THE DOWN GRADIENT TREATMENT SYSTEM IS OVERLOADED, ADDITIONAL UPGRADIENT SEDIMENT CONTROL PRACTICES OR REDUNDANT BMPS MUST BE <br />INSTALLED TO ELIMINATE THE OVERLOADING, AND THE SWPPP MUST BE AMENDED TO IDENTIFY THESE ADDITIONAL PRACTICES AS REQUIRED IN PART III.A.4, <br />A. THROUGH C. <br />c. IN ORDER TO MAINTAIN SHEET FLOW AND MINIMIZE RILLS AND/OR GULLIES, THERE SHALL BE NO UNBROKEN SLOPE LENGTH OF GREATER THAN 75 FEET FOR <br />SLOPES WITH A GRADE OF 3:1 OR STEEPER. <br />SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON ALL DOWN GRADIENT PERIMETERS BEFORE ANY UPGRADIENT LAND DISTURBING ACTIVITIES BEGIN <br />THESE PRACTICES SHALL REMAIN IN PLACE UNTIL FINAL STABILIZATION HAS BEEN ESTABLISHED IN ACCORDANCE WITH PART IV.G. <br />THE TIMING OF THE INSTALLATION OF SEDIMENT CONTROL PRACTICES MAY BE ADJUSTED TO ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR <br />GRUBBING, OR PASSAGE OF VEHICLES. ANY SHORT-TERM ACTIVITY MUST BE COMPLETED AS QUICKLY AS POSSIBLE AND THE SEDIMENT CONTROL PRACTICES <br />MUST BE INSTALLED IMMEDIATELY AFTER THE ACTIVITY IS COMPLETED. HOWEVER, SEDIMENT CONTROL PRACTICES MUST BE INSTALLED BEFORE THE NEXT <br />PRECIPITATION EVENT EVEN IF THE ACTIVITY IS NOT COMPLETE. <br />ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE BMPS DURING CONSTRUCTION UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE <br />INLET HAVE BEEN STABILIZED. INLET PROTECTION MAY BE REMOVED FOR A PARTICULAR INLET IF A SPECIFIC SAFETY CONCERN (STREET FLOODING/FREEZING) HAS <br />BEEN IDENTIFIED AND THE PERMITTEE(S) HAVE RECEIVED WRITTEN CORRESPONDENCE FROM THE JURISDICTIONAL AUTHORITY (E.G. <br />CITY/COUNTY/TOWNSHIP/MNDOT ENGINEER) VERIFYING THE NEED FOR REMOVAL. THE WRITTEN CORRESPONDENCE MUST BE DOCUMENTED IN THE SWPPP OR <br />AVAILABLE WITHIN 72 HOURS UPON REQUEST. WHEN WRITTEN CORRESPONDENCE CAN NOT BE OBTAINED IN A TIMELY MANNER, THE SPECIFIC INLET PROTECTION <br />CAN BE REMOVED TO ALLEVIATE THE IMMEDIATE SAFETY CONCERN. HOWEVER, EFFORTS TO OBTAIN WRITTEN CORRESPONDENCE MUST BE DOCUMENTED IN THE <br />SWPPP AND AVAILABLE WITHIN 72 HOURS UPON REQUEST. PERMISSION TO REMOVE INLET PROTECTION BASED ON A SPECIFIC SAFETY CONCERN MUST STILL BE <br />OBTAINED FROM THE JURISDICTIONAL AUTHORITY WITHIN 30 DAYS OF REMOVAL. <br />TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS, AND <br />CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR CONDUITS AND DITCHES UNLESS <br />THERE IS A BYPASS IN PLACE FOR THE STORMWATER. <br />VEHICLE TRACKING OF SEDIMENT FROM THE CONSTRUCTION SITE (OR ONTO STREETS WITHIN THE SITE) MUST BE MINIMIZED BY BMPS SUCH AS STONE PADS, <br />CONCRETE OR STEEL WASH RACKS, OR EQUIVALENT SYSTEMS. STREET SWEEPING MUST BE USED IF SUCH BMPS ARE NOT ADEQUATE TO PREVENT SEDIMENT <br />FROM BEING TRACKED ONTO THE STREET (SEE PART IV.E.4.D.). <br />THE PERMITEE MUST MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. MINIMIZING SOIL COMPACTION IS NOT REQUIRED WHERE THE <br />FUNCTION OF THE SPECIFIC AREA OF THE SITE DICTATES THAT IT BE COMPACTED. METHODS FOR MINIMIZING COMPACTION INCLUDE THE USE OF TRACKED <br />EQUIPMENT, AND STAYING OFF OF AREAS TO BE LEFT UN -COMPACTED. METHODS TO PRESERVE TOPSOIL INCLUDE STRIPPING AND STOCKPILING TOPSOIL PRIOR <br />TO GRADING OR EXCAVATION OPERATIONS. <br />THE PERMITTEE MUST INSTALL TEMPORARY SEDIMENTATION BASINS AS REQUIRED IN PART III.B. OF THIS PERMIT <br />DEWATERING AND BASIN DRAINING (PART IV.D) <br />DEWATERING OR BASIN DRAINING (E.G., PUMPED DISCHARGES, TRENCH/DITCH CUTS FOR DRAINAGE) RELATED TO THE CONSTRUCTION ACTIVITY THAT MAY HAVE <br />TURBID OR SEDIMENT LADEN DISCHARGE WATER MUST BE DISCHARGED TO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN ON THE PROJECT SITE <br />WHENEVER POSSIBLE. IF THE WATER CANNOT BE DISCHARGED TO A SEDIMENTATION BASIN PRIOR TO ENTERING THE SURFACE WATER, IT MUST BE TREATED WITH <br />THE APPROPRIATE BMP'S SUCH THAT THE DISCHARGE DOES NOT ADVERSELY AFFECT THE RECEIVING WATER, DOWNSTREAM LANDOWNERS OR WETLANDS. THE <br />CONTRACTOR MUST ENSURE THAT DISCHARGE POINTS ARE ADEQUATELY PROTECTED FROM EROSION AND SCOUR. THE DISCHARGE MUST BE DISPERSED OVER <br />NATURAL ROCK RIPRAP, SAND BAGS, PLASTIC SHEATHING OR OTHER ACCEPTED ENERGY DISSIPATION MEASURES. ADEQUATE SEDIMENTATION CONTROL <br />MEASURES ARE REQUIRED FOR DISCHARGE WATER THAT CONTAINS SUSPENDED SOLIDS. <br />FILTER BACKWASH WATERS MUST BE HAULED AWAY FOR DISPOSAL, RETURNED TO THE BEGINNING OF THE TREATMENT PROCESS, OR INCORPORATE INTO THE <br />SITE IN A MANNER THAT DOES NOT CAUSE EROSION. DISCHARGE OF THE BACKWASH WATER TO SANITARY SEWER IS ALLOWED WITH PERMISSION OF THE SANITARY <br />SEWER AUTHORITY. <br />INSPECTIONS AND MAINTENANCE (PART IV.E): <br />THE CONTRACTOR IS RESPONSIBLE AT ALL TIMES FOR THE MAINTENANCE AND PROPER OPERATION OF EROSION AND SEDIMENT CONTROL FACILITIES. THE <br />CONTRACTOR SHALL AT A MINIMUM, INSPECT, MAINTAIN AND REPAIR ALL DISTURBED SURFACES AND ALL EROSION AND SEDIMENT CONTROL FACILITIES AND SOIL <br />STABILIZATION MEASURES ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS FOLLOWING A RAINFALL OF 0.5 INCHES OR <br />GREATER AND WITHIN 7 DAYS AFTER THAT. CONTINUE INSPECTION ACTIVITIES UNTIL LAND -DISTURBING ACTIVITY HAS CEASED. THEREAFTER THE CONTRACTOR <br />SHALL PERFORM THESE RESPONSIBILITIES AT LEAST WEEKLY UNTIL VEGETATIVE COVER IS ESTABLISHED. INSPECTIONS MUST INCLUDE STABILIZED AREAS, <br />EROSION PREVENTION AND SEDIMENT CONTROL BMP'S AND INFILTRATION AREAS. <br />BASED ON INSPECTION RESULTS THECONTRACTOR MAY MODIFY THE SWPPP IN ORDER TO PREVENT POLLUTANTS FROM LEAVING THE SITE VIA STORM WATER <br />RUNOFF. THIS MODIFICATION MUST BE MADE WITHIN 7 CALENDAR DAYS OF THE INSPECTION UNLESS OTHERWISE REQUIRED BY THE TERMS OF THE PERMIT, LEGAL, <br />REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS. <br />INSPECTION REPORTS MUST BE RECORDED WITHIN 24 HOURS IN WRITING AND KEPT ON FILE BY THE CONTRACTOR AS AN INTEGRAL PART OF THE SWPPP ON SITE <br />AND THEN FOR AT LEAST 3 YEARS FROM THE DATE OF COMPLETION OF THIS PROJECT. <br />ALL PERIMETER CONTROL DEVICES MUST BE REPAIRED, REPLACED OR SUPPLEMENTED WHEN THEY BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES 1/2 OF <br />THE HEIGHT OF THE DEVICE. THESE REPAIRS MUST BE MADE BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY, OR THEREAFTER AS SOON AS FIELD <br />CONDITIONS ALLOW ACCESS. <br />REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS, AND <br />RESTABILIZE THE AREAS WHERE SEDIMENT REMOVAL RESULTS IN EXPOSED TOPSOIL. THIS REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN 7 DAYS OF <br />DISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS. <br />SEE (ATTACHMENT A: CONSTRUCTION SWPPP TEMPLATE) FOR SITE SPECIFIC INSPECTIONS AND MAINTENANCE REQUIREMENTS. <br />POLLUTION PREVENTION MANAGEMENT (PART IV.F): <br />THE CONTRACTOR SHALL IMPLEMENT THE FOLLOWING POLLUTION PREVENTION MANAGEMENT MEASURES ON THE SITE; <br />SOLID WASTE: COLLECTED SEDIMENT, ASPHALT AND CONCRETE MILLINGS, FLOATING DEBRIS, PAPER, PLASTIC, FABRIC, CONSTRUCTION AND DEMOLITION DEBRIS <br />AND OTHER WASTES MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH MINNESOTA POLLUTION CONTROL AGENCY (MPCA) DISPOSAL REQUIREMENTS. <br />HAZARDOUS MATERIALS: OIL, GASOLINE, PAINT AND ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED, INCLUDING SECONDARY CONTAINMENT, TO <br />PREVENT SPILLS, LEAKS OR OTHER DISCHARGE. RESTRICTED ACCESS TO STORAGE AREAS MUST BE PROVIDED TO PREVENT VANDALISM. STORAGE AND DISPOSAL <br />OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH MPCA REGULATIONS. <br />EXTERNAL WASHING OF TRUCKS AND OTHER CONSTRUCTION VEHICLES MUST BE LIMITED TO A DEFINED AREA OF THE SITE. RUNOFF MUST BE CONTAINED AND <br />WASTEWATER PROPERLY DISPOSED OF. NO ENGINE DEGREASING IS ALLOWED ON SITE. <br />CONCRETE WASHOUT: ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK PROOF CONTAINMENT <br />FACILITY OR IMPERMEABLE LINER. A COMPACTED CLAY LINER THAT DOES NOT ALLOW WASHOUT LIQUIDS TO ENTER THE GROUND IS CONSIDERED AN IMPERMEABLE <br />LINER. THE LIQUID AND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETE WASHOUT OPERATIONS OR <br />AREAS. LIQUID AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO <br />EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. CONCRETE WASHOUT MAY ALSO OCCUR OFF SITE <br />ACCORDING TO THE APPROPRIATE REGULATIONS. <br />FUELING OPERATION PLAN: ALL FUELING SHALL TAKE PLACE AT THE DESIGNATED FUELING LOCATION AND ACCORDING TO BEST PRACTICES FOR SITE FUELING <br />OPERATIONS AS TO MINIMIZE THE POTENTIAL FOR SPILLS. <br />SPILL PREVENTION PLAN: ALL SPILLS SHALL BE IMMEDIATELY CLEANED UP AFTER DISCOVERY. THE SITE SUPERINTENDENT, WHO IS RESPONSIBLE FOR DAY-TO-DAY <br />ONSITE CONSTRUCTION OPERATIONS WILL BE THE SPILL PREVENTION COORDINATOR AND WILL BE RESPONSIBLE FOR IMPLEMENTING CLEAN UP PROCEDURES, <br />POSTING CLEAN UP RECOMMENDATIONS, AND ENSURING PROPER CLEAN UP TRAINING OF APPROPRIATE PERSONNEL. <br />SANITARY AND SEPTIC WASTE: SANITARY/SEPTIC FACILITIES SHALL BE PROVIDED AND MAINTAINED IN A NEAT AND SANITARY CONDITION, FOR THE USE OF THE <br />CONTRACTOR'S EMPLOYEES. A LICENSED SANITARY WASTE MANAGEMENT CONTRACTOR AS REQUIRED BY STATE REGULATIONS WILL COLLECT SANITARY WASTE <br />FROM PORTABLE UNITS. <br />FINAL STABILIZATION (PART IV.G): <br />THE CONTRACTOR MUST ENSURE FINAL STABILIZATION OF THE SITE ACCORDING THE DEFINITIONS IN THE NPDES GENERAL PERMIT PART IV SECTION G. THE <br />CONTRACTOR MUST SUBMIT A NOTICE OF TERMINATION (N.O.T.) WITHIN 30 DAYS AFTER FINAL STABILIZATION IS COMPLETE OR WITHIN 7 DAYS AFTER SELLING THE <br />SITE OR PORTION OF THE SITE (THAT HAS NOT UNDERGONE FINAL STABILIZATION) TO ANOTHER PARTY. A COPY OF THIS NOTICE OF TERMINATION / PERMIT <br />MODIFICATION FORM MUST GO TO THE NEW OWNER. THE ORIGINAL CURRENT OWNER MUST PROVIDE A SWPPP TO THE NEW OWNER THAT SPECIFICALLY <br />ADDRESSES THE REMAINING CONSTRUCTION ACTIVITY. SEE THE SWPPP PLAN SHEETS AND SWPPP NARRATIVE (ATTACHMENT A: CONSTRUCTION SWPPP <br />TEMPLATE) AND SWPPP PLAN SHEETS FOR FINAL STABILIZATION MEASURES <br />I of TA 10 110 0-110110 <br />ML La 2 11 WTIVA <br />DESIGN ENGINEER: MATTHEW R. PAVEK P.E. <br />TRAINING COURSE: DESIGN OF SWPPP <br />TRAINING ENTITY: UNIVERSITY OF MINNESOTA <br />INSTRUCTOR: JOHN CHAPMAN <br />DATES OF TRAINING COURSE: 5/15/2011 - 5/16/2011 <br />TOTAL TRAINING HOURS: 12 <br />RE -CERTIFICATION: 1/13/14-1/13/14 (8 HOURS), EXP. 5/31/2017 <br />OWNER INFORMATION <br />LAKE WEST DEVELOPMENT, LLC <br />14525 HIGHWAY 7, SUITE 265 <br />MINNETONKA, MN 55345 <br />952-653-1359 <br />CONTACT: <br />CURT FRETHAM <br />(C�OVHO <br />SRO�e <br />Crz M © M P <br />4931 W. 35TH ST. SUITE 200 <br />ST. LOUIS PARK, MN 55416 <br />CivilSiteGroup.com <br />Matt Pavek Pat Sarver <br />763-213-3944 952-250-2003 <br />�EST <br />AREAS AND QUANTITIES (PART III.A.4.B&C): I LAKE til <br />►1h 1[dllFit 1[01k1&I <br />IMPERVIOUS SURFACE <br />EXISTING CONDITION <br />EXISTING <br />0.3% <br />PROPOSED LOT 1 <br />6,276 SF <br />PROPOSED LOT 2 <br />OUTLOT A <br />8,996 SF <br />DEVELOP <br />0UTLOTA <br />2,837 SF <br />3.0°% <br />LOT TOTAL ( LOT 1 + LOT 2) <br />15,272 SF <br />16.2% <br />TOTAL (LOT 1 + LOT 2 + OUT LOT A) <br />BUILDINGCOVERAGE <br />0 SF <br />0.0°% <br />4653 SF <br />16.0% <br />7296 SF 12.3% <br />0 SF <br />18.9% <br />*All existing impervious area is owned by the adjacent property owner <br />ENT <br />w0.0% <br />LLC <br />ALL PAVEMENTS <br />302 SF <br />0.3% <br />1,623 SF <br />5.6% <br />1,700 SF 2.9% <br />2,837 SF 49.4% <br />ALL PERVIOUS SURFACES <br />93,778 SF <br />99.7% <br />22,827 SF <br />78.4% <br />50,243 SF 84.8% <br />2,901 SF 50.6% <br />TOTAL SITE AREA <br />94,080 SF <br />100.0°/ <br />29,103 SF <br />100.0°% <br />59,239 SF 100.0% <br />5,738 SF 100.0% <br />IMPERVIOUS SURFACE <br />EXISTING CONDITION <br />302 SF <br />0.3% <br />PROPOSED CONDITION LOT 1 <br />6,276 SF <br />6.7% <br />PROPOSED CONDITION LOT2 <br />8,996 SF <br />9.6% <br />0UTLOTA <br />2,837 SF <br />3.0°% <br />LOT TOTAL ( LOT 1 + LOT 2) <br />15,272 SF <br />16.2% <br />TOTAL (LOT 1 + LOT 2 + OUT LOT A) <br />18,109 SF <br />19.2% <br />LOT DIFFERENCE (EX. VS PROP.) <br />14,970 SF <br />15.9% <br />TOTAL DIFFERENCE (EX. VS PROP.) <br />17,807 SF <br />18.9% <br />*All existing impervious area is owned by the adjacent property owner <br />EROSION CONTROL QUANTITIES <br />DISTURBED AREA 74,000 SF <br />SILT FENCE/BIO-ROLL 2,700 LF <br />EROSION CONTROL BLANKET 0 SF <br />INLETPROTECTION DEVICES ±0 EA <br />NOTE: QUANTITIES ARE FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR SHALL DETERMINE FOR THEMSELVES THE EXACT <br />QUANTITIES FOR BIDDING AND CONSTRUCTION. <br />CONTRACTOR: SWPPP INSPECTOR TRAINING: <br />ALL SWPPP INSPECTIONS MUST BE PERFORMED BY A <br />PERSON THAT MEETS THE TRAINING REQUIREMENTS OF THE <br />NPDES CONSTRUCTION SITE PERMIT. <br />TRAINING CREDENTIALS SHALL BE PROVIDED BY THE <br />CONTRACTOR AND KEPT ON SITE WITH THE SWPPP <br />PARTY RESPONSIBLE FOR LONG TERM OPERATION AND MAINTENANCE OF PERMANENT <br />STORM WATER MANAGEMENT SYSTEM <br />PERMANENT STORMWATER MANAGEMENT IS NOT REQUIRED AS PART OF THIS PROJECT TO MEET NPDES PERMIT REQUIREMENTS. THE <br />PROPERTY OWNER IS RESPONSIBLE FOR THE LONG TERM OPERATION AND MAINTENANCE OF THE PROPOSED STORMWATER SYSTEM. <br />SWPPP ATTACHMENTS (ONLY APPLICABLE IF SITE IS 1 ACRE OR GREATER): <br />CONTRACTOR SHALL OBTAIN A COPY OF THE FOLLOWING SWPPP ATTACHMENTS WHICH ARE A PART OF THE OVERALL SWPPP PACKAGE: <br />ATTACHMENT A. CONSTRUCTION SWPPP TEMPLATE - SITE SPECIFIC SWPPP DOCUMENT <br />ATTACHMENT B. CONSTRUCTION STORMWATER INSPECTION CHECKLIST <br />ATTACHMENT C. MAINTENANCE PLAN FOR PERMANENT STORM WATER TREATMENT SYSTEMS <br />ATTACHMENT D: STORMWATER MANAGEMENT REPORT - ON FILE AT THE OFFICE OF PROJECT ENGINEER. AVAILABLE UPON REQUEST. <br />ATTACHMENT E: GEOTECHNICAL EVALUATION REPORT - ON FILE AT THE OFFICE OF PROJECT ENGINEER. AVAILABLE UPON REQUEST. <br />SUPPLEMENTARY SITE SPECIFIC EROSION CONTROL NOTES: <br />THESE NOTES SUPERCEDE ANY GENERAL SWPPP NOTES. <br />THIS PROJECT IS GREATER THAN 1.0 ACRES SO AN NPDES PERMIT IS REQUIRED AN MUST BE SUBMITTED TO THE MPCA. THE CONTRACTOR IS <br />REQUIRED TO FOLLOW THE GUIDELINES IN THE NPDES PERMIT THROUGHOUT CONSTRUCTION. <br />PROJECT NARRATIVE: <br />PROJECT IS A REDEVELOPMENT OF AN EXISTING VACANT SITE WITH EXTENSIVE TREE GROWTH INTO A RESIDENTIAL SITE WITH 2 SINGLE FAMILY <br />HOMES. SITE AND LANDSCAPE IMPROVEMENTS WILL OCCUR. <br />SPECIAL TMDL BMP REQUIREMENTS SITE SPECIFIC (IF REQUIRED): <br />1. DURING CONSTRUCTION: <br />A. STABILIZATION OF ALL EXPOSED SOIL AREAS MUST BE INITIATED IMMEDIATELY TO LIMIT SOIL EROSION BUT IN NO CASE COMPLETED <br />LATER THAN SEVEN (7) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY <br />CEASED. <br />B. TEMPORARY SEDIMENT BASIN REQUIREMENTS DESCRIBED IN PART III.C. MUST BE USED FOR COMMON DRAINAGE LOCATIONS THAT <br />SERVE AN AREA WITH FIVE (5) OR MORE ACRES DISTURBED AT ONE TIME. <br />2. POST CONSTRUCTION:THE WATER QUALITY VOLUME THAT MUST BE RETAINED ON SITE BY THE PROJECT'S PERMANENT STORMWATER <br />MANAGEMENT SYSTEM DESCRIBED IN PART III.D. SHALL BE ONE (1) INCH OF RUNOFF FROM THE NEW IMPERVIOUS SURFACES CREATED BY THE <br />PROJECT. SEE PART III.D.1. FOR MORE INFORMATION ON INFILTRATION DESIGN, PROHIBITIONS AND APPROPRIATE SITE CONDITIONS. <br />PERMANENT STABILIZATION NOTES SITE SPECIFIC: <br />PERMANENT SEED MIX <br />• FOR THIS PROJECT ALL AREAS THAT ARE NOT TO BE SODDED OR LANDSCAPED SHALL RECEIVE A NATIVE PERMANENT SEED MIX. <br />of AREAS IN BUFFERS AND ADJACENT TO OR IN WET AREAS MNDOT SEED MIX 33-261 (STORMWATER SOUTH AND WEST) AT 35 LBS PER <br />ACRE. <br />•• DRY AREAS MNDOT SEED MIX 35-221 (DRY PRAIRIE GENERAL) AT 40 LBS PER ACRE. <br />• MAINTENANCE SHALL BE IN ACCORDANCE TO THE MNDOT SEEDING MANUAL. <br />U <br />W <br />O <br />Of <br />IL <br />co <br />LO <br />LO <br />O <br />O <br />LUU <br />O <br />O <br />M <br />Lo <br />J M <br />J L0 <br />In <br />., z <br />Z <br />W z <br />O <br />LILI <br />az <br />O z <br />J 2 <br />W(D <br />LoN <br />W Lu <br />V♦ ~ <br />W Q <br />W = <br />Lo <br />N <br />QL0 <br />J <br />I HEREBY CERTIFY THAT THIS PLAN, <br />SPECIFICATION, OR REPORT WAS <br />PREPARED BY ME OR UNDER MY DIRECT <br />SUPERVISION AND THAT I AM A DULY <br />LICENSED PROFESSIONAL ENGINEER <br />UNDER THE LAWS OF THE STATE OF <br />MINNESOTA. <br />- Matthew R. Pavek <br />DATE 07/19/17 LICENSE NO. 44263 <br />ISSUE/SUBMITTAL SUMMARY <br />REVISION SUMMARY <br />PROJECT NO.: 17059 <br />PRELIMINARY SWPPP <br />- NARRATIVE <br />SW1 3 <br />■ <br />©COPYRIGHT 2017 CIVIL SITE GROUP INC. <br />