My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-2017 Council Packet
Orono
>
City Council
>
2017
>
09-11-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 8:02:13 AM
Creation date
5/29/2019 7:49:04 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Item No.: 16 Date: September 11, 2017 <br />Item Description: #17-3962, Lake West Development, LLC o/b/o Rick & Barbara <br />Lupient, PIDs 20-117-23-42-0001/0002/0003 (Lots 1, 2 & 3 Casco Point Addition) "Ivy <br />Place", Preliminary Plat <br />Presenter: Jeremy Barnhart, Community Agenda Planning Department <br />Development Director Section: Report <br />1. Purpose. The purpose of this action item is to consider a preliminary plat request that would <br />replat an existing 3 lot parcel into 2 buildable lots and one outlot for access. <br />2. 15.99 Deadline. The application was deemed complete on July 19, 2017 and a decision must <br />be made by November 16, 2017. <br />3. Background/ Summary. The applicant is requesting preliminary plat approval of a proposed <br />two -lot subdivision of a vacant property located at the northerly end of Ivy Place on Casco Point. <br />The property consists of 3 existing tax parcels, which the applicants propose to reconfigure to <br />result in two residential building lots, each exceeding the 1/2 -acre minimum lot size of the LR - <br />1 C district. <br />The lots meet requirements to size, area, provide adequate building areas within setbacks <br />including average lake shore and lake yard on three sides. A conservation design study has been <br />completed. <br />Ancillary actions are necessary to support this proposed development including, vacating a <br />utility easement that does not correspond with the actual location of the pipe, variance from the <br />wetland setback in the SW corner of the site to allow the extension of the access drive, issuance <br />of a Conditional Use Permit to allow filling to elevate the houses above the flood elevation, <br />vacation of a driveway easement that terminates in a cul de sac that will not be utilized and <br />clouds the title. It is expected that these actions and Fire, Engineering, and Watershed District <br />comments be addressed prior to Final Plat approval. <br />The attached staff report to the Planning Commission (Exhibit D) provides greater detail on the <br />proposal. <br />4. Planning Commission vote and comment. The Planning Commission reviewed the <br />application on August 21, 2017. The Commission recommended approval 7-0. The Commission <br />requested additional information regarding the amount of fill, (they anticipated 1,300 cy of fill <br />being brought to the site) and wanted to verify the condition of Ivy Place prior to construction. <br />5. Public Comment. At the public hearing, there was substantial comment received, generally <br />in opposition to the development due to potential negative impacts of the development. Concerns <br />include additional stormwater entering the lake from Ivy Place and impacting adjacent parcels, the <br />location of the driveway being too close to the lake, lack of turn around for the traffic within the <br />existing right of way for Ivy Place, safety of traffic on Ivy Place due to its narrow width, and <br />wetland impacts. Written public comment has been received regarding the view easement, <br />attached is attached as Exhibit E. <br />Prepared By: J. Barnhart Reviewed By: J. Barnhart Approved By: _Sb <br />
The URL can be used to link to this page
Your browser does not support the video tag.