My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-28-2017 Council Packet
Orono
>
City Council
>
2017
>
08-28-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 4:59:52 PM
Creation date
5/28/2019 4:55:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No.: <br />Item Description: Curb Replacement Projects 2017 <br />Date: August 28, 2017 <br />Presenter: DJ Goman Agenda Consent Agenda <br />Stormwater Supervisor Section: <br />1. Purpose. The purpose of this action item is to gain approval to proceed with a series of drainage <br />projects though -out Orono in 2017. <br />2. Background. Over the past several months several stormwater/ drainage issues have been rough to <br />the attention of the city. <br />a. The curbing on Bohns point has eroded and needs to be replaced. In its current condition runoff <br />from the road leading into the Cul -de -Sac is directed down the driveway of 3265 Bohns Point Ln causing <br />damage to the properties landscaping. A concrete curb is recommended. <br />b. The curbing on Caroline Avenue has peeled away from the roadway. The curbing is on a tight <br />corner and suffers from snowplows and service vehicle traffic. A concrete replacement is recommended. <br />3. Project Scope, (See Exhibit A for Map) <br />a. Installation of 140 ft. of 136-18 curb and gutter on Bohns Point Lane. <br />b. Installation of 120 ft. of 136-18 curb and gutter on Caroline Avenue. <br />4. Cost. The City received 2 quotes for the curb work, listed below. <br />Contractor <br />Per linial <br />foot Cost <br />Bohns <br />Point Ln <br />Caroline <br />Ave <br />Total Quote <br />Lee Johnson Concrete, LLC <br />$28.00 <br />$3920.00 <br />$3360.00 <br />$7280.00 <br />Minnesota Curb and Gutter <br />$22.85 <br />$3199.00 <br />$2742.00 <br />$5941.00 <br />5. Funding. This project will be funded through the Storm Water Enterprise Fund. The Capital <br />Improvement Plan (CIP) budgeted $76,500 for General Strom sewer improvement projects for 2017. The <br />EOY 17 Fund balance is projected to be $1,453,394. <br />6. Staff Recommendation. Staff recommends that council accept the low quote for the two curb and <br />gutter projects. <br />COUNCIL ACTION REQUESTED <br />Motion to accept the quote from Minnesota Curb and Gutter for $5,941.00 to install Curb and Gutter on <br />Caroline Avenue and Bohns Point Lane. <br />Prepared By: DG <br />Reviewed By: <br />Approvcd By: W <br />
The URL can be used to link to this page
Your browser does not support the video tag.