Laserfiche WebLink
' 3.07 FLAT SECTION <br /> A. Install three plies of Type IV felts set in a solid mopping of asphalt. <br /> B. One layer of a 160 mil Mineral Surfaced will be installed in a solid <br /> mopping of steep asphalt. Apply extra mineral surfacing into hot asphalt. <br /> 3.08 CLEAN UP <br /> A. Clean Up: <br /> ' Immediately upon completion of all work specified the roof membrane <br /> surfaces and the ground set-up shall be cleaned of any debris, construction <br /> dirt or other flaws in appearance. <br /> 3.09 FIELD QUALITY CONTROL <br /> A. Authorized Field Representative: <br /> ' 1. The designated project representative shall make periodic job-site <br /> inspections to observe and report on job progress and quality of work <br /> in progress and work completed to date. <br /> ' B. Final Inspection and Approval: <br /> ' 1. Formal final inspection of completed work shall be made jointly by <br /> the designated Project Representative, Owner's Representative and <br /> the Roofing Contractor. <br /> 3.10 ADJUSTING AND CLEANING <br /> ' A. Repair of Deficiencies: <br /> 1. Installations or details noted as deficient during Final Inspection must <br /> ' be repaired and corrected by the applicator, and made ready for <br /> re-inspection within five (5) working days. <br /> 33 <br />