Laserfiche WebLink
BIDDERS INSTRUCTIONS <br /> ' FOR <br /> TEMPLE ISRAEL <br /> ROOF REPLACEMENT <br /> ' NOTE TO ALL BIDDERS <br /> The following Scope of Work is considered to be an integral part of the <br /> ' specifications. Contractor will coordinate with Temple Israel on this project. <br /> A pre-bid conference will be held on June 28, 1994 at 9:00 A. M. at the Camp Teko on <br /> behalf of Temple Israel. A prerequisite for any Contractor wishing to bid this project <br /> ' means the Contractor or his Subcontractors must be present at the Pre Bid Meeting. <br /> Any bids supplied by contractors not at the Pre-Bid meeting will be null and void. <br /> ' Sealed bids will be received on July 8, 1994 at 11:00 A. M. to furnish all labor <br /> materials, tools equipment, transportation and all else necessary to complete the <br /> described work. <br /> ' Bid opening will be private and not public. All bids become the property of <br /> Temple Israel. <br /> ' All roof tear off will be removed from Job site to an approved State Land Fill. <br /> Failure to comply to all rules and regulations becomes the responsibility of the <br /> Roofing Contractor. <br /> All Contractors must conform to the most current rules and regulations of OSHA. <br /> ' Roofing Contractor to remove only as much roof as can be replaced on that day <br /> to insure water tightness of roof. <br /> ' Field Measurements: <br /> The applicator shall have the sole responsibility for the accuracy of all <br /> measurements, and for the estimate of material quantities required and <br /> necessary to satisfy the requirements of these specifications. <br /> ' Late or incomplete quotations may be viewed as "NO BID". <br /> 1 <br /> 3 <br />