My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
call for bids/re-roof-1994
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0645 Tonkawa Road - 05-117-23-33-0019
>
Misc
>
call for bids/re-roof-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:14:00 PM
Creation date
5/28/2019 1:30:34 PM
Metadata
Fields
Template:
x Address Old
Address
0645 Tonkawa Rd
Document Type
Misc
PIN
0511723330019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BIDDERS INSTRUCTIONS <br /> ' FOR <br /> TEMPLE ISRAEL <br /> ROOF REPLACEMENT <br /> ' NOTE TO ALL BIDDERS <br /> The following Scope of Work is considered to be an integral part of the <br /> ' specifications. Contractor will coordinate with Temple Israel on this project. <br /> A pre-bid conference will be held on June 28, 1994 at 9:00 A. M. at the Camp Teko on <br /> behalf of Temple Israel. A prerequisite for any Contractor wishing to bid this project <br /> ' means the Contractor or his Subcontractors must be present at the Pre Bid Meeting. <br /> Any bids supplied by contractors not at the Pre-Bid meeting will be null and void. <br /> ' Sealed bids will be received on July 8, 1994 at 11:00 A. M. to furnish all labor <br /> materials, tools equipment, transportation and all else necessary to complete the <br /> described work. <br /> ' Bid opening will be private and not public. All bids become the property of <br /> Temple Israel. <br /> ' All roof tear off will be removed from Job site to an approved State Land Fill. <br /> Failure to comply to all rules and regulations becomes the responsibility of the <br /> Roofing Contractor. <br /> All Contractors must conform to the most current rules and regulations of OSHA. <br /> ' Roofing Contractor to remove only as much roof as can be replaced on that day <br /> to insure water tightness of roof. <br /> ' Field Measurements: <br /> The applicator shall have the sole responsibility for the accuracy of all <br /> measurements, and for the estimate of material quantities required and <br /> necessary to satisfy the requirements of these specifications. <br /> ' Late or incomplete quotations may be viewed as "NO BID". <br /> 1 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.