My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
call for bids/re-roof-1994
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0645 Tonkawa Road - 05-117-23-33-0019
>
Misc
>
call for bids/re-roof-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:14:00 PM
Creation date
5/28/2019 1:30:34 PM
Metadata
Fields
Template:
x Address Old
Address
0645 Tonkawa Rd
Document Type
Misc
PIN
0511723330019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. The insurance shall cover the full value of the Contract, together with <br /> all materials located on the site during the entire period of <br /> construction, and until said project is accepted in writing by Temple <br /> Israel. The Contractor shall be responsible for payment of all <br /> deductibles resulting from losses under the coverage provided herein. <br /> 3. The insurance shall be of the type know as "Multiple Peril Builder's <br /> Risk" policy on a completed value form. Such policy shall provide <br /> ' minimum coverage as recommended by the Construction Industry <br /> Cooperative Committee of Minnesota. In the event of occupancy the <br /> Contractor shall notify the insurance company and obtain a "Use of <br /> ' Occupancy Wavier" such that the policy will not be invalidated by <br /> occupancy. The Contractor shall file such endorsement with the <br /> Project Manager and Maintenance Supervisors. <br /> 10. LAYOUT OF WORK <br /> The Contractor shall take measurements and verify dimensions of existing or <br /> old work if any, that affect his work or to which his work is to be fitted. The <br /> ' Contractor alone shall be responsible for the correctness of all measurements <br /> and shall verify all grades, lines. levels. elevation and dimensions. <br /> ( 11. MISCELLANEOUS <br /> The following terms may have been stated but this will not alleviate Contractor from <br /> all set of Terms and Conditions. <br /> ' 1. That no extra work or changes done by the Contractor shall be paid for <br /> unless authorized by Temple Israel in writing. <br /> 1 2. That this Agreement constitutes the entire understanding of the parties and <br /> that this Agreement may be modified only by written agreement of both <br /> parties. <br /> t3. That absent contrary provision on the face hereof, the Job price includes all <br /> freight charges and all taxes assignable to the Job. <br /> 1 4. To protect partially completed work on the Job and equipment or materials <br /> left at the Job site and to be financially responsible for any damage occurring <br /> by Contractor's failure to do so. <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.