Laserfiche WebLink
the home 4101 is set back +/- 16 feet behind the 75 foot set back resulting in an inadvertent <br />hardship for sight line set backs on this lot. <br />2. Planning Council did not recommend any increase to the sq footage of the decking and the new <br />proposed deck is the same size. They recommended a "reconfigu ration". See the actual <br />meeting minutes on what was discussed> <br />a. Meeting Minutes copied from applicatioli: Thiesse indicated he is in agreement with <br />Commissioner Schoenzeit. Thiesse stated in his view the deck is not very practical since <br />it is not even four feet. Thiesse noted they are placing the whole house out of the 75 - <br />foot area but placing the deck within the 0-75 foot zone. Olson commented the deck is <br />also oddly shaped. Peterson concurred the deck is awkward, and if they are not going to <br />be able to have the steps on the west side due to the encroachment, they maybe could <br />look at redesigning it. Peterson noted it is approximately15 feet up and that they would <br />like to have stairs going down. Thiesse stated he hates to meet the intent of the <br />ordinance simply to meet the intent of the ordinance and then not be able to use what <br />they have. Schwingler commented it is a great improvement to the property and <br />decreases the hardcover. Schwinger stated in his view there is a practical difficulty. <br />Schoenzeit stated by giving them some credit for keeping the five feet, they could <br />maybe have more on the lakeside. Schoenzeit stated the way to go would be to have a <br />normal shaped deck that is six or eight feet lakeward of the end of the house but not <br />going past the 5 -foot line. Thiesse noted eight feet is not very much but that they would <br />be able to have a round table with some chairs on it. Thiesse stated he would prefer to <br />have a usable deck. Schoenzeit stated he would prefer not to have anything within the <br />5 -foot setback and that they could redesign it to come off the end of the house. <br />3. The new construction of the home is in full height compliance and the home is 2 level and <br />basement to be clear. I have made many accommodations to reduce the height as much as the <br />architect said is possible due to elevations with connecting to the garage. We have also reduced <br />the pitch and made cut outs in the corner on south east and west side 5 feet which involves <br />significantly more expenses although this was done in the design for me to help provide greater <br />line of sight of the home to the neighbors especially to the east 4101 Highwood to help all in <br />the spirt to be neighborly even though we are in compliance. We also updated the design to <br />move the footprint of home further to the west so there is no side variance on the east which <br />was out of a request of 4101 neighbor. <br />4. 1 have provided nothing but consistent communication and stopped over to the site many times <br />and responded with many compromises and efforts as I stated to work Together on the project <br />not build walls with neighbors that is part of my foundation in all this project. My wife and I <br />even dropped of a card and wine stating how we appreciate in advance the construction <br />disruptions and looking forward to being neighbors. The specific comment that "I have not <br />Heard from HIM" is not correct as I have been in constant communication. see screen shot of <br />my response: <br />