Laserfiche WebLink
MINUTES OF TBE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, April 17,2017 <br />6:30 o'clock p.m. it <br />Gaffron stated the City has not allowed strip driveways in the past and that the entire width is counted BNA. <br />hardcover. <br />Thiesse asked if most of the trees will be gone as a result of the fill. <br />Fretham indicated it is likely that most of the trees will be removed but they will be planting better trees <br />with higher sustainability. A tree quality study has been completed and a number of the trees are storm <br />damaged or of poor quality. Fretham indicated they have not created a landscape plan at this point but <br />that they do plan on planting additional trees with some longevity. <br />Thiesse asked if he has any concerns about the possible mitigation. <br />Frediam stated they will be doing some floodplain mitigation. <br />Gaffron stated the 93 1.5 contour is the I 00 -year floodplain elevation. <br />Landgraver asked if there is a small wetland on the property. <br />Gaff-ron pointed out the location of the wetland on the property. Gaffron stated it would be difficult to tell <br />that it is a wetland if you were standing on the property. <br />Fretham indicated they are proposing to relocate that wetland to the point. <br />Thiesse asked if they will be bringing any materials into the property across the lake. <br />Fretharn commented that might be one way to address some of the construction traffic concerns. Fretham. <br />noted the property is two acres and that they can create some onsite construction traffic parking as well to <br />alleviate concerns with neighborhood street parking. In addition, wood chips can be put down on a <br />temporary basis to avoid compacting the ground. <br />Thiesse asked if the footprints shown in the sketch plan drawings are their best guess. <br />Page 50 of 72 <br />