Laserfiche WebLink
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, Apiril 17,2017 <br />6:30 o'clock p.m. <br />The applicants are also proposing an outlot with a driveway as far away from the wetland as possible but <br />still remain within the outlot. The driveway will require a hardcover variance. While eight feet of width <br />is minimal for a driveway serving two residences, that is the maximum width allowed by code within 75 <br />feet of the lake. With the driveway located so close to the lake, it would be appropriate that stormwater <br />management facilities be established to mitigate impacts of runoff from the driveway. <br />Gaffron noted there was a City project completed approximately five years ago to enhance the shoreline <br />in the area adjacent to the lagoon to cover the City's sewer line. An easement was also created for a cul- <br />de-sac on the property many years ago but the cul-de-sac was never constructed. City sewer and water <br />are available to the property. <br />A very small wetland was delineated within existing Lot 3. If it is determined that filling of this wetland <br />is required, mitigation may or may not be necessary. The applicants are well aware that the majority of <br />the property is a filled wetland and likely will require extraordinary measures such as pilings in order to <br />support homes. <br />Each of the proposed two lots exceeds the minimum acreage requirements. Lot I consists of <br />approximately 0.6 acres in area and Lot 2, being platted as a back lot given the unusual property shape <br />and access limitations, more than meets the 150 percent lot area requirement at approximately 1.4 acres. <br />Each lot exceeds the 1 00 -foot width requirement. <br />The ftont/back lot configuration was recommended by Staff as the most conforming method of converting <br />these three lots into two. The existing driveway easement with cul-de-sac becomes a limiting factor for <br />development of the site and cannot be counted towards lot area. In order to convert the three lots into two <br />lots, a new, relocated access corridor to get past proposed Lot I is necessary. <br />The Planning Commission should consider the following issues: <br />Applicants should be asked to address how they plan to resolve the noted easement and/or <br />encroachment issues, including the Powell view easement; the potential sewer connection <br />encroachment from the adjacent home at 3560 Ivy; and the deck and driveway encroachments <br />from 3560 Ivy. <br />Page 46 of 72 <br />