My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-08-2017 Council Packet
Orono
>
City Council
>
2017
>
05-08-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 2:42:35 PM
Creation date
5/24/2019 2:27:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, April 17,2.017 <br />6:30 o'clock p.m. 44 <br />440(*' <br />Gaffron stated B would also need to be approved. Gaff-ron noted that similar to the conditional use code <br />section, if a conditional use or interim use is not listed in the zoning district, then it is not allowed. <br />Thiesse stated this type of use would need to be identified in the RR- I B district prior to issuing an interim <br />use permit. <br />Leskinen commented she has concerns about this particular use since it is so industrial for the RR- 1 B <br />district. <br />Landgraver stated the only identified interim use the City would have is what is listed in B and the only <br />place where it can be done is in the RR-lB district. Landgraver stated all this is doing is giving the City a <br />too]. <br />Thiesse noted the RR- I B district cover the majority of the City. <br />Landgraver stated someone would still have to apply for an interim use permit and meet all the conditions <br />that will be set. <br />Leskinen noted the Planning Commission is not approving the specific interim use permit being requested <br />by the applicant by approving B but they are saying the City now has this new tool in theory that has to <br />meet all the conditions the City feels are appropriate. <br />Thiesse noted there will be equipment that will be generating noise, such as backup beepers and trucks <br />coming and going. Thiesse stated he does not care about the storage of items on the property but that <br />there will be a lot of noise and distractions that come from a site like this. Thiesse stated he could <br />understand it if they are taking the material from Orono's road and recycling it, but that he is not looking <br />for even a short-term business to come in and do this type of work. <br />Leskinen stated her concern is bringing in materials from outside projects. Leskinen noted the 3 -page <br />letter also cited concerns with air quality as well as a number of other concerns regardless of the location. <br />Leskinen stated the use feels so industrial and that she does not want to regret the decision afterwards. <br />Page 22 of 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.