My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-08-2017 Council Packet
Orono
>
City Council
>
2017
>
05-08-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 2:42:35 PM
Creation date
5/24/2019 2:27:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, April 17,2017 <br />6:30 o'clock p.m. <br />Jean Rehkamp Larson, Applicant, stated she is here tonight on behalf of Bill Tores. Larson indicated they <br />have worked closely with the landscape architect to design a house that has a thoughtful scale and broken <br />into pieces so the massing is not large, and is a much more sensitive plan than the previous proposal. <br />Larson stated in their view it does address the neighbors' concerns and creates a view corridor from the <br />Lebedoff s house. <br />Thiesse asked if what would happen if they rotated the house to be more in line with the average setback. <br />Larson stated in her opinion it would create more of an obstruction to the neighbor than it currently does. <br />If the house is rotated, due to the low level of the site, the drainage that occurs on the northwest part of the <br />site would be reduced and it would be harder to mitigate the water. <br />Charles Fendlayer, Landscape Architect, noted the site is a very complex site and there have been a lot of <br />issues with the complexity of how the house is situated on the property. Fendlayer stated this is basically <br />an unbuildable lot. The highest point on the property is out towards the lakeside where there is the ridge <br />at about the 100 -year floodplain, which is where the previous home used to sit. Soil boring testing closer <br />to the wetland has found peat and other unstable soils in that area. <br />One of the main requirements and challenges was to mitigate stormwater onsite. Fendlayer noted they <br />have been working with a civil engineering firm to create a stormwater management plan, which was one <br />of the requirements from the Minnehaha Creek Watershed District. Approximately two-thirds of the site <br />is located underneath the floodplain area and subject to flooding. The proposed design mitigates the same <br />volume and then some over the requirements of the MCWD. The MCWD has reviewed the plan and <br />have given a green light to proceed forward with the improvements. <br />From a landscaping standpoint, the proposed house is set back from the previous proposal and further <br />away from the western property to help maintain a natural outlet to Lake Minnetonka. The majority of <br />the existing trees on the property will be maintained and additional trees will be planted on the property. <br />The infiltration areas will essentially be one giant rain garden and a good portion of the site will be <br />restored to become a natural meadow to help with mitigation. Fendlayer stated because a lot of the <br />existing site is right at the water table level, there is not much infiltration currently but the prairie should <br />help with that. <br />
The URL can be used to link to this page
Your browser does not support the video tag.