My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-24-2017 Council Packet
Orono
>
City Council
>
2017
>
04-24-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 2:23:26 PM
Creation date
5/24/2019 2:19:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CBOLTON <br />D& MENK <br />Real People. Real Solutions. <br />April 18, 2017 <br />City of Orono <br />Attn: Adam Edwards <br />PO Box 66 <br />Orono,MN 55323 <br />RE: Fox Street <br />Dear Adam: <br />2638 Shadow Lane <br />Suite 200 <br />Chaska, IVIN 55318-1172 <br />Ph: (952) 448-8838 <br />Fax: (952) 448-8805 <br />BoLton-Menk.com <br />Enclosed is the bid tabulation for the Fox Street Improvement Project. As directed, the project was bid <br />with alternate completion dates. Part A corresponds to a completion date of July 14, 2017 and Part B <br />corresponds to a completion date of September 1, 2017: <br />Part A — July 14, 2017 Completion Date <br />Part B — September 1, 2017 Completion Date <br />Wm. Mueller & Sons <br />$807,838.40 <br />Park Construction <br />$750,485.03 <br />Valley Paving <br />$825,211.85 <br />GMH Asphalt <br />$772,240.36 <br />Park Construction <br />$828,738.54 <br />Valley Paving <br />$805,942.25 <br />New Look Contracting <br />$828,891.50 <br />Wm. Mueller & Sons <br />$807,838.40 <br />GMH Asphalt <br />$839,015.57 <br />New Look Contracting <br />$828,891.50 <br />Biftuninous Roadways <br />$877,636.30 <br />McCrossan Cosntiruction <br />$857,928.20 <br />McCrossan Construction <br />$878,783.70 <br />Bituminous Roadways <br />$877,636.30 <br />Astech <br />$900,265.12 <br />Astech <br />$900,265.12 <br />Given the significant cost difference between Part A and Part B, we recommend awarding the low bid of <br />$750,485.03, corresponds to a September 1, 2017 completion date. The construction cost for the <br />Municipal State Aid (MSA) Portion of the project is $321,230.91 and the cost for the non -MSA portion of <br />the project is $429,254.12. <br />Based on our review of the bids, we recommend awarding the project to Park Construction in the amount <br />of $750,485.03. <br />Please let me know if you have questions or need additional information. <br />Sincerely, <br />Bolton & Menk, Inc. <br />--D ,,—Q P V� & <br />David P. Martini, P.E. <br />Principal Engineer <br />H:\0RN0\Cl3110828\l-Corres\C-To Others\Fox Street Bid Tabulation 4-18-17.docx <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.