My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-13-2017 Council Packet
Orono
>
City Council
>
2017
>
03-13-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 1:45:07 PM
Creation date
5/24/2019 1:21:35 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Storm Sewer <br />Units <br />535 $ <br />$/unit <br />Total <br />Remove Exlsft Storm Sewct pipe <br />LF <br />15 $ <br />7.00 <br />$105.00 <br />Connect to Existing StnAm <br />EA <br />1 $ <br />11500.00 <br />$1,500.00 <br />15" Storm Seaver <br />LF <br />1,183 $ <br />MOD <br />$335,480.00 <br />2' x T Cath Basin <br />EA <br />2 $ <br />1,5W.00 <br />• $3,000.00 <br />48" Catch BnsiNMarbvie <br />FA <br />18 $ <br />2.000.00 <br />$30.000.00 <br />EdhWed CoeatrucUon Cost <br />TN <br />2.100 $ <br />14.OD <br />$70,085.00 <br />Remove Retaining Walls <br />LF <br />535 $ <br />7.010 <br />9,745. A <br />Remove Curr and Butter <br />LF <br />30 S <br />6.00 <br />$160.00 <br />Grading <br />LS <br />1 $175,00D.OD <br />$356881.88 <br />$17UMAO <br />Retaining Woo <br />SF <br />800 $ <br />26.00 <br />$1$0,000,00 <br />Fence <br />LF <br />81 D $ <br />20.00 <br />$16,200.00 <br />Subgrade Preparation <br />SY <br />4,135 $ <br />1.78 <br />$7,236.25 <br />Aggregate Rase. Class 51OD% Crushed- 8" (Cy) <br />TN <br />2.100 $ <br />14.OD <br />$29,400.00 <br />Concrete Curb and Guft B618 <br />LF <br />1,840 S <br />11.00 <br />$16,040.00 <br />Surmountable Curb and Gutter <br />LF <br />44 $ <br />10.00 <br />$440.00 <br />t3itLlmbvw Base Course- 2" <br />TN <br />605 $ <br />50.00 <br />$25=.00 <br />$lturnhous Weer Course, -1 1fd" <br />TN <br />378 $ <br />56.00 <br />$20,790.00 <br />Bituriib= Material For Teck Coat <br />GAL <br />210 $ <br />200 <br />$420.00 <br />Concrete Skkmtk <br />SF <br />7,715 $ <br />4.60 <br />$34,717.50 <br />Striping <br />LS <br />1 $ <br />31500.00 <br />$3.500.00 <br />Singage <br />LS <br />1 $ <br />500.00 <br />$5D4 00 <br />Landscaping <br />LS <br />1 $ <br />45,000,00 <br />$46,000.00 <br />Tomp Bresion Control <br />LS <br />1 $ <br />10.000.00 <br />$14,000.00 <br />EaWnsted ConWudlon Cost <br />a6ao_3e9.74 <br />SwbrySnw <br />$ ,4 AO <br />Waw Main <br />$57,9D0.00 <br />Services <br />$14,940.00 <br />Storm Sewer <br />$71,095.00 <br />PWWM Lot / Grading / LendscaplEg$540,388.78 <br />Totlal Estimate Construction Cost <br />$713,723.75 <br />$356881.88 <br />Total for Financial Gumntee <br />$1,070,586.63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.