Laserfiche WebLink
PUD NO. 2C AGREEMENT AND <br />DEVELOPMENT CONTRACT <br />EXMI T A - SITE A PROVEMENTS COST ESTIMATE <br />3121;12007 <br />Amber Woods Office Center Plat 07.3250 <br />Cost Estimate for Financial Guarantee (160%) <br />Sanitary Sewer Im ents <br />Units <br />Qty <br />$Knit <br />Total <br />McbMuNon <br />LS <br />1 $ <br />6,ODD.00 <br />$5, 00.00 <br />TimFcControl <br />LS <br />1 $ <br />1,000.00 <br />$1,000,00 <br />Canned to Usting 0" Sanitary Sewer <br />EA <br />1 $ <br />2,500.00 <br />$2,500.00 <br />8" PVC Sanitary Sewer <br />LF <br />360 $ <br />30.00 <br />$10,800.00 <br />6" X 6" Wye <br />EA <br />a $ <br />100.00 <br />$6W.00 <br />4' Diann ter Sankey Sewer Manhole <br />EA <br />4 $ <br />2,000,00 <br />$8,000.00 <br />4' DiarneW Sankey Surer Maathole Overdepth <br />LF <br />rz To <br />IOU -00 <br />$2,200.00 <br />-hmmyed fte Foundatlon <br />LF <br />400 $ <br />1.00 <br />$400.00 <br />Es*nated Construction Cost . <br />$30,400.00 <br />Water Main fm rovements <br />Units <br />ek <br />$/Unit <br />Total <br />Remove Existing Watennrafrn Pipe <br />LF <br />200 $ <br />5.00 <br />.$1,200.00 <br />Remove Hydrant <br />EA <br />2 S <br />600.00 <br />$1,200.D0' <br />Connect to Existing Water Main <br />EA <br />2 $ <br />2,500.00 <br />$5,000.00 <br />8" DIP Water Main <br />LF <br />700 $ <br />40,00 <br />$30.400.00 <br />6" DIP Waller Main <br />LF <br />$5 $ <br />30.00 <br />$2,550.00 <br />8" Fittings <br />EA <br />16 $ <br />250.00 <br />$8,760.00 <br />Meulat m <br />SY <br />10 $ <br />' 10.00 <br />$100.00 <br />Hydrant <br />EEA <br />3 $ <br />2,600.00 <br />$71500.00 <br />r Gv end Box <br />EA <br />2 $ <br />1,300.00 <br />$2.600.00 <br />W Gv and Bax <br />EA <br />3 $ <br />1,200.00 <br />$81600.00 <br />Es*raftd Co+nstructlorr Cost <br />$57.900.00 <br />Services Irn rovements <br />Units <br />Qty. <br />EnIt <br />Total <br />IV PNC, Service Pipe <br />LF <br />355 $ <br />22.00 <br />77810.0D <br />1.S kwh Dopper service <br />LF <br />305 $ <br />16.00 <br />$4,880.00 <br />1.6 Brch carp <br />EA <br />6 S <br />200.00 <br />$1.000.00 <br />1.5 inch curb <br />EA <br />5 $ <br />250.00 <br />$1250.00 <br />Estlawed Construction Cost <br />$14,90.00 <br />