14. EROSION CONTROL. Prior to initiating site grading, the storm water pollution <br />prevention plan, and the erosion control plan shall be implemented by the Developer and <br />inspected and approved by the City. The City may impose additional erosion control requirements <br />if reasonably required. All areas disturbed by excavation and backfilling operations shall be <br />reseeded within five (5) days after the completion of the work, weather permitting, or in an area <br />that is inactive for more than ten (10) days unless authorized and approved by the City Engineer. <br />Except as otherwise provided in the erosion control plan, seed shall be in accordance with the <br />City's current seeding specification which may include certified oat seed to provide a temporary <br />ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc <br />anchored as necessary for seed retention. The parties recognize that time is of the essence in <br />controlling erosion. If the Developer does not comply with the erosion control plan and schedule <br />or supplementary instructions received from the City, the City may take such action as it deems <br />appropriate to control erosion. The City will endeavor to notify the Developer in advance of any <br />proposed action, but failure of the City to do so will not affect the Developer's and City's rights or <br />obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred <br />for such work within ten (10) days, the City may draw down the "security" to pay any costs. No <br />development, utility or street construction will be allowed and no building permits will be issued <br />unless the Land is in full compliance with the approved erosion control plan. <br />15. GRADING PLAN. The Land shall be graded in accordance with the approved <br />grading, drainage, and erosion control plan, Plan "B". The plan shall conform to City of Orono <br />specifications. Within thirty (30) days after completion of the grading and before the City <br />approves individual building permits the Developer shall provide the City with an "as <br />constructed" grading plan certified by a registered land surveyor or engineer that all ponds, <br />6 <br />5outhways V3 <br />