My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-11-2018 Council Packet
Orono
>
City Council
>
2018
>
06-11-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 12:25:15 PM
Creation date
5/24/2019 11:50:51 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Hennepin County for County Road Access and Work in County Rights -of - <br />Way <br />• DNR for Dewatering <br />• City of Orono for Building Permits <br />• Minnehaha Creek Watershed District for erosion control permit and storm <br />water management permit <br />• NPDES Permits (National Pollutant Discharge Elimination Systems) issued <br />by MPCA <br />11. DEWATERING. Due to the variable nature of groundwater levels and <br />stormwater flows, it will be the Developer's and the Developer's contractors' and <br />subcontractors' responsibility to satisfy themselves with regard to the elevation of groundwater <br />in the area and the level of effort needed to perform dewatering and storm flow routing <br />operations. All dewatering shall be in accordance with all applicable county, state, and federal <br />rules and regulations. DNR regulations regarding appropriations permits shall also be strictly <br />followed. <br />12. TIME OF PERFORMANCE. The Developer shall install all Improvements as <br />contemplated by Section 8 and the approved Plans by December 31, 2019, with the exception of <br />the final wear course of asphalt on streets. The final wear course on streets shall be installed <br />between August 15th and September 15th the first summer after the base layer of asphalt has been <br />in place one freeze thaw cycle. The Developer may, however, request an extension of time from <br />the City. If an extension is granted, it shall be conditioned upon updating the "security" to reflect <br />cost increases and the extended completion date. Final wear course placement must have the <br />written approval of the City Engineer, and may be delayed or scheduled at any time of the year <br />based upon existing site conditions at the discretion of the City Engineer. <br />13. LICENSE. The Developer hereby grants the City, its agents, employees, officers <br />and contractors a license to enter the Land to perform all work and inspections deemed <br />appropriate by the City in conjunction with development of the Laud. <br />5 <br />Southways V3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.