Laserfiche WebLink
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, May 21, 2018 <br />6:30 o'clock p.m. <br />3. LA18-000040 MATTHEW AND ANGELA HOPPING, 95 SMITH AVENUE, <br />CONDITIONAL USE PERMIT, 6:35 P.M. — 6:58 P.M. <br />The applicant was not present. <br />Curtis stated the applicant is requesting approval of a conditional use permit for grading over 500 cubic <br />yards. Also as part of this plan the applicant is requesting City Council approval of a second driveway <br />access onto Smith Avenue to access a lower level garage. <br />The applicants are redeveloping the subject property and constructing a new residence. Their grading <br />plan involves the import of approximately 250 cubic yards of soil with a total site disturbance balance of <br />approximately 815 cubic yards. The new home is proposed to have an upper, main garage, as well as a <br />lower garage to accommodate their desired number of vehicles on site. The proposed new home is more <br />in keeping with the immediate neighborhood. <br />Staff has provided an analysis of the conditional use permit criteria in the report and individual criteria <br />can be discussed if the Planning Commission wishes. <br />To accomplish the desired home and the tuck -under garage, the grade must be adjusted with fill in the <br />area between the house and the road on the northeast side. The proposed home will have a first -floor <br />garage elevated above the current grades by approximately seven feet and the lower level garage floor <br />will be set within a foot or so of the existing grade. <br />The property is situated along Smith Avenue. According to City Code, one driveway approach is <br />permitted per property. In addition to the conditional use permit, the City Council will need to grant <br />approval to allow the second driveway approach. This requirement is not within the zoning code and <br />therefore a public hearing for this type of variance is not necessary, but the City Council shall consider <br />the second driveway request when the conditional use permit is reviewed. <br />Curtis stated the City has not received any written public comments regarding this application but that she <br />did speak with a couple of the neighbors regarding the grading plan and that Staff can meet with them and <br />the applicant to discuss the plan further if they desire. <br />Planning Staff recommends approval of the conditional use permit subject to the following conditions: <br />1. City Engineer and Watershed District shall approve the erosion control plan. <br />2. The street swept daily or as needed to keep debris off of Smith Avenue. <br />3. The applicant must conform to the City's and MCWD's erosion control regulations. <br />4. Only clean fill to be imported to the site. <br />5. Conformance with the City Engineer's requirements at the time of the building permit. <br />6. Hauling shall occur during allowed construction hours only Monday through Friday, <br />7 a.m. to 8 p.m. and between 8 a.m. and 8 p.m. on weekends and holidays. <br />7. Contractor shall post a contact number and be able to respond to complaints in a timely <br />fashion. <br />Curtis noted the applicant is unable to be here this evening due to a family emergency. <br />The Planning Commission had no questions for Staff. <br />