Laserfiche WebLink
PROPOSAL # QN18031601-02 <br />To: City of Orono <br />2700 Kelley Parkway <br />Orono, MN 55356 <br />Attn: Adam Edwards <br />Re: Water System Improvements <br />Date: May 4, 2018 <br />From: Troy Neurauter <br />Valid: 90 days <br />Page: 1 of 5 <br />Thank you for the opportunity to recommend improvements to the water treatment plants in the City of Orono. <br />We have worked together to identify and prioritize a list of items that will improve the operational capability of <br />systems, increase personnel safety and create a more reliable system. <br />The items have been itemized based on independent hardware requirements and software improvements <br />required. Field service expenses have been removed. This will allow the City to combine or separate the tasks <br />as desired. In Control will add field service expenses at cost to the invoices with a goal to minimize the number <br />of visits and in turn reduce the overall cost to the City. <br />The recent addition of Well 4 to the north water treatment plant is of most importance and directly coupled <br />with the ability to control chemical dosing at the proper rate between the flow rates of well 3 and well 4. Should <br />we gain approval for this work, we would execute as quickly as possible before summer demand increases. <br />Reporting requirements from Minnesota DNR and MCES have increased over the past years. We are proposing <br />an automated monthly and annual reporting template to ease the ability to meet these requirements. This will <br />allow the City Staff to quickly validate the information and increase the amount of data being reported. <br />A number of improvements are focused on the chemicals utilized for water treatment including bulk storage and <br />post treatment analysis. Bulk storage monitoring allows staff to properly manage the volume of chemicals on <br />site and validate overall usage or detect losses. The new analyzer at each plant, which is part of another project, <br />will provide increased safety to the drinking water system while allowing the City to closely track overall usage. <br />We have identified longer term items that have been identified as potential improvements based on product <br />availability. These are intended to allow insight and budgeting to minimize risk of downtime with the water <br />treatment systems. Some components at the facilities are near or past obsolescence and availability. <br />Why should you select In Control as your Systems Integrator and Partner? <br />In Control is a premier systems integrator and professional services provider serving the water and <br />wastewater industry since 1995. Our highly reputable engineering staff has developed numerous best <br />practices and frequently acts as consultants throughout a project's journey. The relationships earned during <br />projects frequently grow into long term commitments to keep systems up to date with minimal downtime. <br />Our mission is to provide the most cost effective, reliable control system in a professional manner. <br />We keep you in control of expenses through thoughtful consulting, consistent pricing and exceptional service. <br />In Control, Inc. <br />10350 Jamestown Street NE Phone: (763) 783-9500 <br />Blaine, MN 55449 Fax: (763) 783-9502 <br />