Laserfiche WebLink
• A deck on the boat house and concrete stoop on the lake side of the boat house were shown on the <br /> approved/proposed plan. They are not shown on the as-built survey. Were these re-built? <br /> Grading, riprap, and retaining wall within 75-foot setback. <br /> • No grade changes were proposed or approved within 75' of the lake. The as-built survey shows that <br /> the grades were changed around the area of the boat house. Additionally, based on the surveys it <br /> appears that the riprap extends landward farther than it should, and that the retaining wall was changed <br /> or expanded. Please provide grading/disturbance calculations for the 0-75' zone. Note, only 50 cubic <br /> yard of total disturbance is permitted; and no change to the retaining wall was permitted. <br /> • A rip rap permit was issued by the MCWD, but it appears the retaining wall was possibly expanded <br /> without proper City approvals. <br /> Hardcover. <br /> • The as-built hardcover calculations submitted show the property at 26.73% where a maximum of <br /> 25% is allowed. It appears the access to the property via the western driveway was abandoned and <br /> now access to the property is only off of Frederick Street. If the access from the west is no longer <br /> benefitting the property, this bituminous driveway area can be removed from the hardcover <br /> calculations. Reference the City's Hardcover Information Packet. Hardcover in excess of 25% is not <br /> permitted and must be removed. <br /> The issues above must be resolved; the as-built survey is not approved. Please contact me with <br /> questions. <br /> Thank you, <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway !, Orono MN ! 55356 (physical address) <br /> PO Box 66 Crystal Bay MN 55323-0066 (mailing address) <br /> ror 952.249.4620 6 952.249.4616 <br /> cmattson(a�ci.orono.mn.us ; www.ci.orono.mn.us <br /> 6 <br />