My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sept.-Dec. 2018 emails re: As-Built survey
Orono
>
Property Files
>
Street Address
>
C
>
Casco Point Road
>
2480 Casco Point Road - 20-117-23-21-0037
>
Correspondence
>
Sept.-Dec. 2018 emails re: As-Built survey
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:52:36 PM
Creation date
5/24/2019 11:00:17 AM
Metadata
Fields
Template:
x Address Old
House Number
2480
Street Name
Casco Point
Street Type
Road
Address
2480 Casco Point Road
Document Type
Correspondence
PIN
2011723210037
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Can you let me know if you've had a chance to talk with Jorj and Jon, and if not <br /> possibly reach out to them for clarification. I'm just curious where things are at. <br /> Thanks. <br /> Steve Rudolph <br /> 763-464-8057 <br /> On Friday, October 12, 2018, 8:26:32 AM CDT, Christine Mattson <CMattson©ci.orono.mn.us> wrote: <br /> Good Morning, <br /> We reviewed the as-built survey submitted for 2480 Casco Point Road and have concerns or need <br /> clarification on the following: <br /> Boat House. <br /> • The boat house on the as-built survey is shown larger than documented on the survey for the boat <br /> house permit dated 06/29/16 and on the survey for the permit for the addition to the home dated <br /> 08/19/16 . The existing boat house was 18.9' x 33.2'; the as-built boat house is 19.6' x 33.4'. This is an <br /> unpermitted increase of 0.7 feet in width and 0.2 feet in length, or 27.16 square feet. <br /> • Our building official visited the property on October 11, 2018 and noted also that boat house <br /> exceeds the height and width of the pre-existing structure. <br /> • NOTE: The building exceeds the in-kind replacement permitted, it will need to be reduced/modified <br /> to conform to the in-kind replacement; or you may apply for after-the-fact average lakeshore setback, <br /> lake setback, and hardcover variances. Please note the fact that the building exists today as-is is not a <br /> practical difficulty. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.