My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-2018 Council Packet
Orono
>
City Council
>
2018
>
03-12-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 10:54:09 AM
Creation date
5/24/2019 10:45:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2122/2018 <br />Page 3 of 6 <br />SRF Consulting Group, Inc. <br />Work Tasks <br />and Person -Hour Estimates; <br />Client: <br />City of Orono <br />Project: <br />Wayzata Boulevard (County Road 112) - Phase 2 Landscaping <br />ConsullIng Group, Inc. <br />P11400 <br />TASK NO. <br />TASK DESCRIPTION <br />PRINCIPAL <br />SR. ASSOC. <br />ASSOCIATE SR. PROF <br />PROF. <br />TECHNICAL <br />CLERICAL <br />TOTALS <br />EST. FEE <br />Client Deliverables: <br />- Confirm authorization from Hennepin County to utilize electronic data from the <br />CSAH 112 roadway project. <br />- Plans for drainage and erosion control improvements in nearby ravine north of <br />Old Long Lake Rd. (by other) <br />- Available information for proposed redevelopment of the parcel immediately to <br />the west ofthe CSAH 112/Old Long Lake Rd. intersection within Long Lake limits <br />- Review of exhibits and preliminary plans for compliance with project goals, City of <br />Orono standards, and maintenance requirements. <br />3.1 <br />Visit site and document existing conditions of nearby surroundings with <br />0 <br />0 <br />0 <br />1 <br />1 <br />0 <br />0 <br />2 <br />$197 <br />photographs. <br />3.2 <br />Prepare existing conditions basemapping (aerial and CAD). <br />0 <br />0 <br />0 <br />0 <br />2 <br />0 <br />0 <br />2 <br />$182 <br />3.3 <br />Develop an illustrative Preliminary Landscape Layout Plan. <br />0 <br />1 <br />0 <br />10 <br />10 <br />0 <br />0 <br />21 <br />$2,124 <br />3.5 <br />Create one 3D photo -realistic visualization ofthe proposed design overlayed on a <br />0 <br />0 <br />0 <br />0 <br />12 <br />0 <br />0 <br />12 <br />$1,092 <br />photo background of the surroundings. <br />3.6 <br />Prepare a Preliminary Construction Cost Estimate. <br />0 <br />0.5 <br />0 <br />0.5 <br />4 <br />0 <br />0 <br />5 <br />$494 <br />SRF Deliverables: <br />- Preliminary Landscape Layout Plan <br />- One 3D photo -realistic visualization <br />- Preliminary Construction Cost Estimate <br />SUBTOTAL - TASK 3 <br />0 <br />1.5 <br />0 <br />11.5 <br />29 <br />0 <br />0 <br />42 <br />$4,089 <br />4.0 <br />Landscape Construction Plans <br />Assumptions: <br />- Landscape Plan will be based on CSAH 112 phase 2 Roadway Reconstruction <br />which includes permanent turf establishment of impacted areas. <br />- Plans will be submitted for review at 75% and 100% completion for review by <br />City, Hennepin County, and MnDOT State Aid in electronic pdf format. <br />- Tasks below include all internal design coordination and meetings. <br />Client Deliverables: <br />- City standard terms and conditions for bidding documents <br />- Review of plans, specifications, bidding documents <br />4.1 <br />Prepare Draft 75% Complete Plans. <br />0 <br />1 <br />0 <br />8 <br />16 <br />0 <br />0 <br />25 <br />$2,458 <br />4.2 <br />Prepare Final 100% Complete Plans. <br />0 <br />1 <br />0 <br />6 <br />12 <br />0 <br />0 <br />19 <br />$1,882 <br />4.3 <br />Perform internal quality review of plans. <br />0 <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />2 <br />$308 <br />SRF Deliverables: <br />- Draft 75% Complete Plans <br />- Final 100% Complete Plans <br />SUBTOTAL -TASK 4 <br />0 <br />4 <br />0 <br />14 <br />28 <br />0 <br />0 <br />46 <br />$4,648 <br />5.0 <br />Specifications <br />Assumptions: <br />- SRF will prepare the necessary Division S Special Provisions to supplement the <br />2018 MnDOT Standard Specifications. <br />- SRF will prepare the necessary Special Provisions to amend or supplement the <br />2018 MnDOT Standard Specifications for Plant Installation. <br />11400-CSAH 112-Ph2landscape-Orono.xlsx <br />SRF CONSULTING GROUP, INC. ENGINEERS AND PLANNERS MINNEAPOLIS. MN <br />
The URL can be used to link to this page
Your browser does not support the video tag.