My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-2018 Council Packet
Orono
>
City Council
>
2018
>
03-12-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 10:54:09 AM
Creation date
5/24/2019 10:45:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SBF P11400.PP <br />February 22, 2018 <br />Mr. Adam Edwards, PE <br />Public Works Director/City Engineer <br />City of Orono <br />2700 Kelley Parkway <br />Orono, MN 55356 <br />Subject: Proposal for Professional Services for Wayzata Boulevard (County Road 112) <br />Phase 2 Landscape, Orono, MN <br />Dear Mr. Edwards: <br />Based on your request, SRF Consulting Group, Inc. (SRF) is pleased to submit this proposal to provide <br />professional services for preparing preliminary and final landscape plans for Wayzata Boulevard consistent <br />with Phase 2 of Hennepin County's roadway reconstruction project. <br />Scope of Services <br />We propose to carry out the work ("Scope of Services"), set forth in Attachment B, attached hereto and <br />incorporated into this Agreement. <br />Assumptions <br />SRF will prepare the plans based on the final design plans for the roadway project and requests that the <br />City confirm authorization from the County to utilize the electronic data from that project. The City will <br />also provide basemapping and construction limits for the drainage and erosion work of the ravine area <br />north of Old Long Lake Road where additional plantings are envisioned. <br />Schedule <br />We will complete this work within a mutually agreed-upon time schedule based on the City's initially stated <br />goal of having plans prepared for bidding in late 2018 and 2019 installation. <br />Basis of Payment/Budget <br />We propose to be reimbursed for our services on an hourly basis for the actual time expended. Other <br />direct project expenses such as printing, supplies, reproduction, etc., will be billed at cost and mileage will <br />be billed at the current allowable IRS rate for business miles. Invoices are submitted on a monthly basis for <br />work performed during the previous month. Payment is due within 30 days. <br />Based on our understanding of the project and our scope of services, we estimate the cost of our services <br />to be $14,119, which includes both time and expenses. <br />Changes in the Scope of Services <br />It is understood that if the scope or extent of work changes, the cost will be adjusted accordingly. Before <br />any out -of -scope work is initiated, however, we will submit a budget request for the new work and will not <br />begin work until we receive authorization from you. <br />www.srfconsuIting.com <br />One Carlson Parkway North, Suite 150 1 Minneapolis, MN 55447-4453 1 763.475.0010 Fax: 1.866.440.6364 <br />An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.