My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-12-2018 Council Packet
Orono
>
City Council
>
2018
>
02-12-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 10:32:01 AM
Creation date
5/24/2019 10:20:16 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. <br />a. At the time of building permit for each of the new lots a Met Council SAC fee in the <br />amount of $2,485.00 and $50 sewer permit fee will be due for each lot. <br />b. One additional water unit is due with the creation of two new lots. The 3rd water <br />unit charge is $4,240.00 per the 2018 Fee Schedule. <br />7. City Engineer Approval. Approval is subject to the recommendations of the City Engineer <br />in his comment letter dated January 8, 2018 and any forthcoming comments as may be <br />warranted. <br />8. Plans and Specifications. The following plans and specifications shall be submitted for <br />review and approval by the City and other appropriate jurisdictions, to ensure that the <br />proposed plat will accomplish the intended purposes: <br />a. Final plans and specifications for all proposed utility lines and services, including <br />proposed revisions, if any, to existing service facilities. <br />b. Final grading, drainage and erosion control plan showing existing and proposed <br />contours, building locations, elevations, stormwater facilities and calculations, <br />utilities and erosion control measures to be used during construction. Final Plat <br />Approval will not be granted until the Minnehaha Creek Watershed District has <br />approved the stormwater management plans. <br />c. Sufficient detail to meet the recommendations of the City Engineer. <br />9. Drainage and Utility Easements shall be dedicated to the public on the final plat 10' along <br />all exterior property lines, and 5' either side of interior property lines, and such easements <br />shall be increased to accommodate drainage and utilities where required, subject to City <br />staff approval. <br />10. Developers Agreement. Developer shall execute a Developer's Agreement for <br />construction of improvements on the Property to ensure all site improvements are installed <br />to the City's specifications and satisfaction. Said Developers Agreement may contain <br />additional conditions not noted in this Preliminary Plat Approval resolution. No land <br />alterations can take place until erosion control is established and the City is in receipt of a <br />final grading. No improvements can begin until the City Engineer has approved all <br />improvement plans. No improvements can begin until 24 hours after the final plat has <br />been recorded with Hennepin County. A Letter of Credit must accompany a fully executed <br />Developer's Agreement written to 150% of the cost of the proposed site improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.