Laserfiche WebLink
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. <br />for a 3 -lot plat per the Preliminary Plat survey/drawing David Knaeble dated 12/12/17 and <br />Bennetts Woods Plans dated 12/12/17 and attached hereto as Exhibits A through H, subject to <br />the following conditions: <br />1. Council approval is based on the entire record, above Findings. <br />2. The Developer shall implement and adhere to the provisions of the Conservation Plan by <br />Jacobson Environmental dated December 12, 2017. <br />3. The Developer shall establish covenants providing for a Homeowners Association which <br />will be responsible for all future maintenance activities related to the stormwater facilities <br />and the Conservation Plan. <br />4. Existing grade for all lots for building height determination shall be the proposed grades <br />as shown on the Preliminary Grading Plan dated 12/12/17 attached as Exhibit B. The <br />grading plan as approved establishes new existing grades for building pads. <br />5. Development Fees <br />a. Park Dedication - The Parks, Open Space and Trail Plan element of the Orono <br />Comprehensive Plan does not specify the need for a neighborhood park at this <br />location. A Park Dedication Fee in lieu of land would be appropriate per City <br />Ordinance. The Park Fee is determined as 8% of the fair market value of the land <br />being subdivided, but must be between a minimum of $3,250 and a maximum of <br />$5,550 per residential dwelling unit. For the proposed lots, the Park Fee would be <br />based on only the 2 new lots. The City's Assessor will be consulted to determine <br />the market value of the land for establishing the amount of the fee. Park Fee Due <br />$11,100. <br />b. Stormwater and Drainage Trunk Fee. The development is subject to the 2018 <br />Stormwater and Drainage Trunk Fee of $6,050 per acre. For the 1/2 -acre zoning <br />districts, any lot exceeding 0.5 gross acres, including wetland, shall be charged a <br />maximum trunk fee equal to the trunk fee for a 0.5 acre parcel. Therefore $6,050 <br />x 1.5 [3 lots x 0.5 = 1.5 total acres] = $9,075.00. <br />6. Utilities. The property is within the MUSA. Sewer and water service is available to the <br />Property. According to the as -built record sewer plan, the Property has one stub on Togo <br />Road and two stubs at Northern Avenue. The property was fully assessed for 294 feet of <br />front footage, which includes both Togo and Northern frontages. <br />