My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-26-2018 Council Packet
Orono
>
City Council
>
2018
>
02-26-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 9:34:56 AM
Creation date
5/24/2019 9:26:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No.: 10 <br />Date: February 26, 2018 <br />Item Description: Leaf Street- Approval to Solicit Bids <br />Presenter: Adam Edwards Agenda Public Works Director/ <br />Public Works Director/City Engineer Section: City Engineer Report <br />1. Purpose. The purpose of this action item is to update the Council on the designs for the Leaf Street <br />Project and authorize the solicitation of bids for the project. <br />2. Background. At the March 22"d, 2017 Council Work Session the Council provided guidance on a <br />way forward for road maintenance funding and projects for the 2017 and 2018 construction seasons. At <br />the April 24`x', 2018 council meeting, council provided direction to staff on roads to include in 2018 Street <br />Maintenance Project which included Leaf Street. On July 24t1i, 2017 the Council approved the <br />engineering and design for the selected roads. City staff and Bolton and Menk then conducted surveying, <br />assessments and prepared draft designs for the subject roads. Draft plans were shared with residents at <br />the open house on December 13', 2017. The draft plan and bid packet is now ready for bid solicitation. <br />3. Scope of Work. The project consist of the mill and overlay of the bituminous pavement, select <br />subgrade corrections, and the replacement of the associated stormwater systems on Leaf Street. <br />4. Cost. The estimated cost based on the engineer's estimate is shown in the table below. This estimate <br />is based on the results of soils analysis, resident feedback and detailed design. <br />5. Funding. Funding for the project will come from a combination of the Municipal State Aid Fund <br />(MSA), Stormwater Fund, Sewer fund. <br />Fund <br />Engineer's Estimate <br />CIP <br />Estimate <br />City Streets <br />Pavement Storm Utilities <br />Total <br />Leaf Street <br />$161,750 $13,250 $10,000 <br />$185,000 <br />Engineering Design <br />$20,000 <br />$20,000 <br />Engineering Construction Services <br />$16,800 <br />$16,800 <br />Total <br />$198,550 $13,250 $10,000 <br />$221,800 <br />5. Funding. Funding for the project will come from a combination of the Municipal State Aid Fund <br />(MSA), Stormwater Fund, Sewer fund. <br />Fund <br />Cost <br />Estimate <br />CIP <br />Estimate <br />Estimated EOY 2018 Fund Balance <br />MSA <br />$ 161,750 <br />$ 210,000 <br />$ 204,663* <br />Stormwater <br />$ 13,250 <br />$ 1,410,101 <br />Sewer <br />$ 10,000 <br />$ 1,797,833 <br />Total <br />$ 198,550 <br />$ 210,000 <br />* Does not include planned OCB Work nor MSA <br />advance for same. <br />6. Timing. <br />Advertise for Bids............................................................................March 2018 <br />Open Bids/ Award..............................................................................April 2018 <br />Construction.................................................................................Summer 2018 <br />7. Staff Recommendation. I recommend the council approve the plans and authorize staff to solicit <br />bids. <br />COUNCIL ACTION REQUESTED <br />Move to authorize the solicitation of Bids for the project. <br />Prepared By: <br />Reviewed By: <br />Approved By: -1V <br />
The URL can be used to link to this page
Your browser does not support the video tag.