Laserfiche WebLink
QBOLTON <br />& MENK <br />Real People. Real Solutions. <br />April 18, 2018 <br />City of Orono <br />Attn: Adam Edwards <br />PO Box 66 <br />Orono, MN 55323 <br />RE: 2018 Drainage Improvements — Design and Bidding Services <br />Dear Adam: <br />2638 Shadow Lane <br />Suite 200 <br />Chaska, MN 55318-1172 <br />Ph: (952) 448-8838 <br />Fax: (952) 448-8805 <br />Bolton-Menk.com <br />As requested, we have prepared a scope of services and design fee estimate for the proposed 2018 <br />Drainage Improvements Project. It is our understanding that the scope of the project will include the <br />following: <br />1. Carman Road — Replace storm sewer outlet <br />2. Orono Orchard Road — Replace storm sewer <br />3. Farview Lane — Replace multiple culverts and stabilize ravine <br />4. Turnham Road — Replace inlet and storm sewer outlet <br />5. Chevy Chase Drive — Replace culvert <br />6. North Arm Drive — Install drop structure on culvert and stabilize ravine <br />7. Fagerness Point Road — Replace inlet and storm sewer outlet <br />8. Park Lane — Install inlets and storm sewer <br />9. Casco Cove — Replace inlet and storm sewer outlet <br />10. Casco Circle — Replace inlet and storm sewer <br />11. Watertown Road — Install curb and gutter <br />Proposed Scope of Engineering Services <br />To assist the City with this improvement project, Bolton & Menk proposes the following scope of <br />services: <br />Topographic Survey— We will document existing conditions within the project areas as necessary. <br />Survey information to be obtained will include manholes, sewer, topography, and any other data pertinent <br />to improvements outlined above. This work will include research for existing easements within project <br />areas. <br />Wetland Delineation and Watershed Permitting — We will delineate wetlands as necessary and coordinate <br />delineation approvals with reviewing agencies. We will also submit necessary documents for Minnehaha <br />Creek Watershed District permitting and coordinate permit approvals. Documents may include <br />construction plans, specifications, and stormwater runoff analysis as necessary for connections to <br />wetlands, lakes, and l5t order streams. <br />Sta, f Design Meetings — Our team will work with City staff to develop the scope of the project and to get <br />input on design details. The goal of these meetings is to ensure that the project is designed consistent <br />with City standards and that the City's maintenance practices and operations are considered throughout <br />the design process. <br />H:\ORNO\2018 New Projects\Fee Estimate - 2018 Drainage Improvements.docx <br />Bolton & Menk is an equal opportunity employer. <br />