My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-23-2018 Council Packet
Orono
>
City Council
>
2018
>
04-23-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 9:02:29 AM
Creation date
5/24/2019 8:56:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Item No.: 12 <br />Date: April 23, 2018 <br />Item Description: 2018 Stormwater Improvement Projects <br />Presenter: Adam T. Edwards, PE Agenda Consent Agenda <br />City Engineer/Director of Public Works Section: <br />1. Purpose. The purpose of this action item is to gain approval to proceed with the 2018 Stormwater <br />improvement projects and accept the proposal from Bolton and Menk (BMI) for engineering support. <br />2. Background. Each year the public works department works to repair and upgrade the City's <br />stormwater infrastructure. Inspections in 2017 identified a number of structures for repair or replacement. <br />Project Scope. Replace, repair or install new stormwater structures as listed below: <br />a. Carman Road — Replace storm sewer outlet <br />b. Orono Orchard Road — Replace storm sewer <br />c. Farview Lane — Replace multiple culverts and stabilize ravine <br />d. Turnham Road — Replace inlet and storm sewer outlet <br />e. Chevy Chase Drive — Replace culvert <br />f. North Arm Drive — Install drop structure on culvert and stabilize ravine <br />g. Fagerness Point Road — Replace inlet and storm sewer outlet <br />h. Park Lane — Install inlets and storm sewer <br />i. Casco Cove — Replace inlet and storm sewer outlet <br />j. Casco Circle — Replace inlet and storm sewer <br />k. Watertown Road — Install curb and gutter <br />4. Cost. BMI provided an estimate not to exceed $42,000 to perform engineering for the projects. <br />5. Funding. This project will be funded through the Stormwater Enterprise Fund. The Capital <br />Improvement Plan (CIP) budgeted $209,989 for general storm sewer improvement projects for 2018. The <br />EOY 2018 Fund balance is projected to be $1,410,101. <br />6. Staff Recommendation. I recommend that council accept the proposal from BMI and authorize staff <br />to being working begin the planning of the 2018 stormwater projects. <br />COUNCIL ACTION REQUESTED <br />Motion to accept the proposal from BMI for an amount not to exceed $42,000 for Stormwater engineering <br />and authorize staff to being working begin the planning of the 2018 Stormwater projects. <br />Exhibits <br />Exhibit A. BMI Proposal <br />Prepared By: <br />Reviewed By: <br />Approved By: -Sb9a <br />
The URL can be used to link to this page
Your browser does not support the video tag.