My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-23-2018 Council Packet
Orono
>
City Council
>
2018
>
04-23-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 9:02:29 AM
Creation date
5/24/2019 8:56:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
QBOLTON <br />& MENK <br />Real People. Real Solutions. <br />April 16, 2018 <br />City of Orono <br />Attn: Adam Edwards <br />PO Box 66 <br />Orono, MN 55323 <br />RE: 2018 Street Improvements — Design and Bidding Services <br />Dear Adam: <br />2638 Shadow Lane <br />Suite 200 <br />Chaska, MN 55318-1172 <br />Ph: [9521448-8838 <br />Fax: [9521448-8805 <br />Balton-Menk.com <br />As requested, we have prepared a scope of services and design fee estimate for the proposed 2019 Street <br />Improvements Project. It is our understanding that the scope of the project will include the following: <br />• East Long Lake Road — Reconstruction with minor drainage improvements <br />• Windjammer Lane — Reconstruction with minor drainage improvements <br />• Lyman Avenue — Mill and overlay <br />• Tonkaview Lane — Mill and overlay <br />• Chevy Chase Drive — Mill and overlay with minor drainage improvements <br />• Kenwood Way — Mill and overlay <br />• Casco Circle — Mill and overlay <br />Proposed Scope of Engineering Services <br />To assist the City with this improvement project, Bolton & Menk proposes the following Scope of <br />Services: <br />Topographic Survey and Soil Borings — We will document existing conditions within the right of way <br />where necessary. Bolton & Menk will coordinate with a sub -consultant to collect and analyze soil <br />borings along the alignment of the roads where necessary. Existing soil characteristics will be used to <br />assist with the design of the pavement structure for the streets to be reconstructed. <br />StaffDesjpn Meetings — Our team will work with City staff to develop the scope of the project and to get <br />input on design details. The goal of these meetings is to ensure that the project is designed consistent <br />with City standards and that the City's maintenance practices and operations are considered throughout <br />the design process. <br />C:\Users\jessicaka\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.0utlook\8G7WGMS2\Fee Estimate - 2019 Street Improvements.docx <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.