Laserfiche WebLink
AGENDA ITEM <br />Street <br />Pavement <br />CIP Estimated Cost <br />Stormwater Utilities <br />Pavement Fund <br />Total <br />East Long Lake Road (South) <br />$ <br />166,900 <br />$ <br />77,000 <br />$ 58,874 <br />$ 1,594,158 <br />$ <br />243,900 <br />Windjammer Lane <br />$ <br />71,834 <br />$ <br />7,200 <br />$ <br />24,750 <br />$ <br />103,784 <br />Lyman Avenue <br />$ <br />46,321 <br />$ <br />4,600 <br />$ <br />50,921 <br />Tonkaview Lane <br />$ <br />90,204 <br />$ <br />9,000 <br />$ <br />99,204 <br />Chevy Chase Drive <br />$ <br />175,532 <br />$ <br />17,500 <br />$ <br />193,032 <br />Kenwood Way <br />$ <br />22,795 <br />$ <br />2,300 <br />$ <br />25,095 <br />Casco Circle <br />$ <br />120,435 <br />$ <br />12,000 <br />$ <br />132,435 <br />2019 projects TOTAL <br />$ <br />694,021 <br />$ <br />129,600 <br />$ <br />24,750 <br />$ <br />848,371 <br />Forest Arms Lane (2018 deferred)* <br />$ <br />383,856 <br />$ <br />13,101 <br />$ <br />34,124 <br />$ <br />431,081 <br />TOTAL <br />$ <br />1,077,877 <br />$ <br />142,701 <br />$ <br />58,874 <br />$ <br />1,279,452 <br />* Forest Arms Lane Cost estimates are based on 2018 Bid Amounts. <br />6. Funding. The engineering as well and the eventual projects will be funded with a combination of the <br />Pavement Management Fund, Utility Funds, and Stormwater Fund. The Pavement Fund continues to be <br />of concern. Adequate funding for the 2019 projects is based on several assumptions: one, the pavement <br />levy for 2019 is set at $750K; two, $450K is available for Positive fund balances from 2018; and that <br />$100K of water tower lease revenue is dedicated to street maintenance. See Pavement CIP/Funding <br />Table at Exhibit C. <br />Fund <br />Total <br />Est. 2019 End of Year <br />Fund Balance <br />Pavement Fund <br />$ 1,077,877 <br />$ 120,053 <br />Stormwater Fund <br />$ 142,701 <br />$ 1,366,573 <br />Utility Funds <br />$ 58,874 <br />$ 1,594,158 <br />Total <br />$ 134,000 <br />COUNCIL ACTION REQUESTED: <br />Move to: <br />Approve the 2019 Road Maintenance plan <br />Acceptance of the Bolton and Menk's proposal for design and engineering services for a fee not <br />to exceed $ 165,000. <br />Direction to Staff on way forward for East Long Lake Road. <br />Exhibits <br />Exhibit A. Casco Point Petition <br />Exhibit B. Bolton and Menk Construction Proposal <br />Exhibit C. Pavement CIP/Funding Table <br />Prepared By: Reviewed By: Approved By: -TV <br />