My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-23-2018 Council Packet
Orono
>
City Council
>
2018
>
04-23-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 9:02:29 AM
Creation date
5/24/2019 8:56:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2018 Street Improvement Project - Construction Services <br />April 16, 2018 <br />Page 2 <br />Record drawings detailing the completed improvements as recorded by the construction observer and the <br />City of Orono's contractor will be completed and furnished to the City in hard copy and electronic format. <br />Record plans will also be linked to the City mapping system. <br />Fee Estimate <br />Based on the Scope of Services described above, we propose a not -to -exceed fee of $283,000 to be billed <br />on an hourly basis. This fee accounts for the additional design services that were provided to evaluate <br />drainage issues not included in the original scope of the project and includes coordinating the work of a <br />geotechnical engineering firm to complete materials testing for the project. A separate proposal for <br />materials testing services will be submitted to the City for review. <br />Please let me know if you have questions or need additional information. <br />Sincerely, <br />Bolton & Menk, Inc. <br />David P. Martini, P.E. <br />Principal Engineer <br />C:\Users\jessicaka\Desktop\2018 Street Improvements Construction Services 4-16-18.docx <br />Bolton & Monk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.