My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-29-2018 Council Packet
Orono
>
City Council
>
2018
>
05-29-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 8:47:06 AM
Creation date
5/24/2019 8:39:26 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Item No.: <br />Item Description: Right of Way Ordinance Update <br />Date: May 29, 2018 <br />Presenter: Adam T. Edwards, P.E. Agenda Consent Agenda <br />Public Works Director/City Engineer Section: <br />1. Purpose. The purpose of this action item is to adopt an updated Right of Way (ROW) Ordinance. <br />2. Background. In 2017 the State of Minnesota adopted legislation impacting how municipalities may <br />regulate their right of ways with respect to small wireless facilities. In order to address the new state <br />requirements staff developed a ROW ordinance (Exhibit A). The draft ROW ordinance is based on a <br />League of Minnesota Cities (LMC) template that was adapted to Orono's situation by the City Attorney <br />and Engineer. Background information from the LMC on the state legislation and its impact to ROWS is <br />at Exhibit B. <br />3. Summary. The attached ordinance updates the existing ROW ordinance by providing direction on the <br />process for ROW permits, the conditions of the permit, fees, and inspections. Permits are broken into three <br />categories: excavation, obstruction and small cell. <br />4. Staff Recommendation. Staff recommend that adoption of the attached ordinance change. <br />COUNCIL ACTION REQUESTED <br />Motion to adopt the resolution at Exhibit A. <br />Exhibits <br />Exhibit A. Draft ROW ordinance. <br />Exhibit B. 2017 Telecommunications Right -of -Way User Amendments Permitting Process for Small <br />Wireless Facilities <br />Prepared By: <br />Reviewed By: -Sb)R <br />Approved By: -T) <br />
The URL can be used to link to this page
Your browser does not support the video tag.