Laserfiche WebLink
©2018 Westwood Professional Services, Inc. <br />SWPPP NARRATIVE <br />THE SWPPP IS PREPARED IN ACCORDANCE WITH THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) <br />REGULATIONS AS ESTABLISHED BY THE CLEAN WATER ACT. THIS REPORT SHALL BE ON THE SITE AT ALL TIMES DURING <br />CONSTRUCTION. THE OWNER MUST ALSO KEEP THIS SWPPP ON FILE FOR THREE YEARS AFTER SUBMITTAL OF THE NOTICE OF <br />TERMINATION. THE FOLLOWING ARE OUTLINED IN THIS SWPPP: <br />- CONTROL MEASURES FOR STORM WATER POLLUTION PREVENTION PRIOR TO AND DURING CONSTRUCTION <br />- CONTROL MEASURES FOR STORM WATER POLLUTION PREVENTION AFTER CONSTRUCTION <br />- INSPECTION AND MAINTENANCE PROCEDURES <br />THE GRADING AND EROSION CONTROL PLAN PREPARED FOR ORONO SENIOR HOUSING SHALL BE CONSIDERED PART OF THE <br />SWPPP. <br />PROJECT LOCATION <br />THIS DOCUMENT PRESENTS A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR ORONO SENIOR HOUSING IN ORONO, <br />MINNESOTA. THE SITE IS LOCATED IN THE BETWEEN KELLEY PARKWAY AND WAYZATA BVLD W, THE 3RD PARCEL EAST OF N. <br />OLD CRYSTAL BAY RD. <br />OWNER/OPERATOR INFORMATION <br />ORONO SENIOR HOUSING IS OWNED BY APEX HOLDINGS LLC, 2110 LYNDALE AVENUE SOUTH, SUITE C, MINNEAPOLIS, MN 55405. <br />ORONO SENIOR HOUSING IS OPERATED BY TBD. <br />OWNER/OPERATOR RESPONSIBILITIES <br />OWNER <br />-DEVELOPMENT OF SWPPP PRIOR TO APPLICATION/NOI SUBMITTAL. <br />-SUBMIT A COMPLETE AND ACCURATE APPLICATION FORM (NOI) <br />-COMPLIANCE W/ ALL TERMS AND CONDITIONS OF PERMIT <br />-SWPPP SUBMITTAL FOR 30 REVIEW FOR PROTECT GREATER THAN 50 ACRES & DISCHARGING TO <br />SPECIAL/IMPAIRED WATERS WITHIN 1 MILE OF SITE DISCHARGE. <br />-KEEPING PERMIT COVERAGE UP-TO-DATE (TRANSFER/SUBDIVISION) (PART II.B.5) <br />-NOT WITHIN 30 DAYS OF COMPLETING NPDES REQUIREMENTS & COMPLETING ACTIVITY ON SITE. <br />-IDENTIFY WHO HAS LONG TERM 0&M PERMANENT STORMWATER SYSTEM. <br />-DEVELOP CHAIN OF RESPONSIBILITY WITH ALL OPERATORS TO ENSURE NPDES COMPLIANCE. <br />CONSTRUCTION MATERIALS, CHEMICALS AND WASTE MATERIALS THAT WILL BE USED OR STORED AT THE SITE: <br />POTENTIAL POLLUTANT <br />LOCATION <br />CONTROL MEASURE <br />ANTIFREEZE <br />DIESEL FUEL <br />FERTILIZER <br />VARIOUS <br />SECONDARY CONTAINMENT DRIP PAN <br />VARIOUS <br />SECONDARY CONTAINMENT DRIP PAN <br />LANDSCAPE <br />CONTRACTOR <br />IN EQUIPMENT <br />FUELING AREA <br />SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT / DRIP PAN <br />GASOLINE <br />GLUE ADHESIVES <br />CONTRACTOR <br />SECONDARY CONTAINMENT <br />HYDRAULIC OILS FLUIDS <br />CONTRACTOR <br />SECONDARY CONTAINMENT <br />PAINTS <br />CONTRACTOR <br />SECONDARY CONTAINMENT <br />GREASE <br />CONTRACTOR <br />SECONDARY CONTAINMENT DRIP PAN <br />SANITARY WASTE <br />PORTABLE <br />BATHROOMS <br />SERVICE PROVIDER TO SECURE UNITS FROM <br />TIPPING OVER AND MAINTAINED <br />SOIL AMENDMENTS <br />VARIOUS <br />SECONDARY CONTAINMENT <br />LANDSCAPING MATERIALS <br />LANDSCAPE <br />CONTRACTOR <br />CONTRACTOR RESPONSIBLE <br />CONCRETE <br />TRUCK WASHOUT <br />WASHOUT AREA <br />CONCRETE MORTAR <br />MOBILE MIXER <br />S.C. WASHOUT AREA <br />ENSURE <br />ADEQUATE TREATMENT IS OBTAINED AND DISCHARGE WATER WILL NOT CONTRIBUTE EXCESSIVE SEDIMENT OR <br />CONSTRUCTION NOTES <br />IT IS HIGHLY RECOMMENDED THAT THE CONTRACTOR MAINTAIN A STOCKPILE OF EROSION CONTROL DEVICES AND SEDIMENT <br />CONTROL BMP'S ON SITE AT ALL TIMES FOR IMMEDIATE USAGE. IN THE EVENT OF AN ACCIDENTAL SEDIMENT DISCHARGE TO <br />WATERS OF THE STATE, OR ANY DISCHARGE OF HAZARDOUS MATERIAL OF REPORTABLE QUANTITY, CONTACT THE MPCA STATE <br />DUTY OFFICER AT 1-800-422-0798. <br />TIMING OF BMP INSTALLATION <br />THE EROSION PREVENTION AND SEDIMENT CONTROL BMP'S SHALL BE INSTALLED TO MINIMIZE EROSION FROM DISTURBED <br />(PART II.C.) SURFACES AND CAPTURE SEDIMENT ON SITE. THE FOLLOWING LIST DEFINES THE TIMING OF EROSION PREVENTION AND <br />SEDIMENT CONTROL MEASURES IN SPECIFIC AREAS. <br />OPERATOR <br />-RESPONSIBLE FOR PARTS II.B., II.C., IV. & APPENDIX A, PART C. IF APPLICABLE. (JOINTLY WITH OWNER) <br />-COMPLETE AND SIGN APPLICATIONS FOR PERMIT TRANSFER AND MODIFICATION AND NOTICE OF TERMINATION WITH OWNER <br />AS NEEDED, <br />THE OWNER MUST IDENTIFY PERSONNEL KNOWLEDGEABLE AND EXPERIENCED (TRAINED PERSONNEL) IN THE APPLICATION OF <br />EROSION PREVENTION AND SEDIMENT CONTROL BMP'S WHO WILL OVERSEE THE IMPLEMENTATION OF THE SWPPP, AND THE <br />INSTALLATION, INSPECTION AND MAINTENANCE OF THE EROSION PREVENTION AND SEDIMENT CONTROL BMP'S BEFORE AND <br />DURING CONSTRUCTION. TRAINING DOCUMENTATION AND INFORMATION WILL BE INCLUDED WITH THE ON-SITE SWPPP WORKBOOK <br />AND DOCUMENTATION. <br />PROJECT DESCRIPTION <br />THE SITE IS APPROXIMATELY 3.50 ACRES. CONSTRUCTION WILL CONSIST OF, BUT IS NOT LIMITED TO, GRADING, UTILITIES, <br />CONSTRUCTION OF A MULTI -STORY BUILDING WITH AN APPROXIMATE 40,000 SQ FOOTPRINT, AND LANDSCAPING. <br />PRE -DEVELOPMENT SITE CONDITIONS <br />THE EXISTING SITE IS AN UNDEVELOPED FIELD. THE SITE HAS A SLIGHT SLOPE FROM WEST TO EAST WITH SOIL STOCKPILES <br />AT A FEW LOCATIONS. <br />POST -DEVELOPMENT SITE CONDITIONS <br />THE PROPOSED SITE WILL CONSIST OF A MULTI -STORY BUILDING, WITH ASSOCIATED DRIVE LANES AND PARKING. PERVIOUS <br />AREAS WILL BE VEGETATED. DRAINAGE WILL BE COLLECTED VIA SITE STORM SEWER WHICH WILL DISCHARGE TO AN EXISTING <br />REGIONAL POND TO THE EAST OF THE SITE. THE POND WAS DESIGNED TO HANDLE STORMWATER RUNOFF FROM THIS SITE. <br />LAND FEATURE CHANGES <br />THE DISTURBED AREA IS 3.5 ACRES. <br />EXISTING SITE IS 100% PERVIOUS. <br />THE PROPOSED SITE IS 62.6 % IMPERVIOUS <br />THE NET INCREASE IN IMPERVIOUS AREA IS 2.19 ACRE. <br />IMPAIRED WATERS <br />THERE IS ONE IMPAIRED WATERS WITHIN 1 (ONE) MILE OF THE PROJECT SITE DISCHARGE LOCATIONS) AS INDICATED ON THE <br />PCA IMPAIRED WATERS MAP. LONG LAKE IS IMPAIRED FOR MERCURY IN FISH TISSUE AND NUTRIENT/EUTHROPHICATION <br />BIOLOGICAL INDICATORS, AND IS LOCATED 5215' EAST OF THE PROJECT SITE. <br />SPECIAL WATERS <br />THERE ARE NO SPECIAL WATERS WITHIN 1 (ONE) MILE OF THE PROJECT SITE DISCHARGE LOCATIONS) AS INDICATED ON THE <br />PCA SPECIAL WATERS MAP. <br />SOIL TYPES <br />THE SITE CONTAINS 1.5 TO 4' THICK LAYER OF TOPSOIL, OVERLAYING FILL AND DEPOSITS CONSISTING MAINLY OF CLAYEY <br />SAND AND LEAN CLAY. REFER TO THE GEOTECHNICAL REPORT DATED 01/18/2018 completed by BRAUN INTERTEC. THE SOILS <br />HAVE SLIGHT EROSION POTENTIAL. <br />STORM WATER MANAGEMENT PLAN <br />THE PERMANENT STORM WATER MANAGEMENT PLAN WILL CONSIST OF THE EXISTING WET SEDIMENTATION BASIN CONSTRUCTED <br />EAST OF THE PROJECT. THE POND WAS DESIGNED FOR MNDOT HIGHWAY WORK AND A FEW AREA DEVELOPMENTS. THE DESIGN <br />POND STORAGE IS 14.2 ACRE-FEET. <br />EROSION/SEDIMENT CONTROL PREVENTION MEASURES <br />TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL BMP'S ALONG WITH THE PROCEDURES TO BE USED TO <br />ESTABLISHED ADDITIONAL TEMPORARY BMP'S AS NECESSARY FOR SITE CONDITIONS DURING CONSTRUCTION ARE IDENTIFIED ON <br />THE SITE GRADING AND EROSION CONTROL PLAN PREPARED FOR THE DEVELOPMENT OF THIS PROJECT, AND WITHIN THE <br />PROJECT STORM WATER POLLUTION PREVENTION PLAN. <br />PERMANENT VEGETATION ESTABLISHMENT <br />PERMANENT TURF SHALL FOLLOW THE RECOMMENDATIONS PER NOTES AND SPECIFICATIONS IN THE GRADING AND/OR <br />LANDSCAPE PLAN. SEEDING THAT IS TO OCCUR AFTER OCTOBER 20TH SHALL CONFORM TO THE MN/DOT SPECIFICATIONS FOR <br />DORMANT SEEDING PER THE MN/DOT SEEDING MANUAL 2007. <br />POTENTIAL STORM WATER POLLUTANTS <br />POTENTIAL POLLUTANT SOURCES, INCLUDING CONSTRUCTION AND WASTE MATERIALS THAT ARE USED OR STORED AT THE SITE, <br />ARE DESCRIBED IN THE SECTION. BY IMPLEMENTATION OF THESE BMPS, THE POTENTIAL POLLUTANT SOURCES ARE NOT <br />REASONABLY EXPECTED TO AFFECT THE STORM WATER DISCHARGES FROM THE SITE. <br />Westwood <br />Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 <br />Fax (952) 937-5822 Minnetonka, MN 55343 <br />Toll Free (888) 937-5150 westwoodps.com <br />Westwood Professional Services, Inc. <br />I hereby certify that this plan was prepared by me or under my <br />direct supervision and that I am a duly licensed PROFESSIONAL <br />ENGINEER under the laws of the State of Minnesota <br />Ryan U Bluhm <br />Data 08/08/18 Uowse No. 41257 <br />PRIOR TO START OF CONSTRUCTION <br />THE FOLLOWING EROSION PREVENTION AND SEDIMENT CONTROL MEASURES ARE SHOWN IN THE PLANS AND SHALL BE <br />IMPLEMENTED PRIOR TO CONSTRUCTION: <br />1. INSTALL SILT FENCE OR OTHER SEDIMENT CONTROL AROUND THE PERIMETER OF AREAS TO BE GRADED AND ALL AREAS <br />WHICH ARE NOT TO BE DISTURBED AS SHOWN ON THE GRADING AND EROSION CONTROL PLAN. <br />2. CONSTRUCT GRAVEL CONSTRUCTION ENTRANCES AT FIELD ENTRANCES TO THE SITE AS SHOWN ON THE CONSTRUCTION <br />PLANS. <br />3. INLET PROTECTION IS TO BE INSTALLED AT ALL STORM WATER INLETS WHICH HAVE THE POTENTIAL TO RECEIVE STORM <br />WATER RUNOFF FROM THE CONSTRUCTION SITE WITHIN 200 FEET OF LIMITS OF CONSTRUCTION. <br />4. INSTALL SILT FENCE OR OTHER SEDIMENT CONTROL AROUND ALL TEMPORARY INACTIVE STOCKPILES. ALL SILT FENCES <br />FOR STOCKPILES SHALL BE INCIDENTAL TO GRADING CONTRACT IF STOCKPILES ARE PLACED OUTSIDE OF SILT FENCES <br />SHOWN ON THE PLAN. <br />DURING CONSTRUCTION <br />THE FOLLOWING EROSION PREVENTION AND SEDIMENT CONTROL MEASURES ARE SHOWN IN THE PLANS AND SHALL BE <br />IMPLEMENTED DURING CONSTRUCTION: <br />1. PHASE GRADING WORK TO MINIMIZE THE DURATION THAT ANY DISTURBED SOIL IS EXPOSED. <br />2. ALL DISTURBED AREAS SHALL HAVE TEMPORARY PROTECTION OR PERMANENT COVER OVER EXPOSED SOIL <br />AREAS IF NOT BEING ACTIVELY GRADED AND/OR IF NOT AT FINAL GRADE WITHIN 7 DAYS OF DISTURBANCE ACTIVITY <br />TEMPORARILY OR PERMANENTLY CEASING. TEMPORARY SEED MIX 150, APPLIED AT A RATE OF 40 LBS/ACRE, SHALL BE <br />USED PRIOR TO WINTER, IF SITE NOT SODDED. <br />3. STRIP AND STOCKPILE TOPSOIL FOR REPLACEMENT OF 6 INCHES OF TOPSOIL OVER TURF AREAS WHEN GRADING IS <br />COMPLETE. <br />4. PLACE A MINIMUM OF 2 TONS/ACRE OF STRAW ON ALL AREAS AFTER REACHING FINAL GRADE WITH TOPSOIL AND <br />ANCHOR STRAW WITH EITHER A STRAIGHT DISK, HYDROMULCH OR POLYMER. <br />5. STABILIZATION OF TEMPORARY OR PERMANENT DRAINAGE DITCHES THAT DRAIN WATER FROM THE CONSTRUCTION SITE <br />MUST BE INITIATED WITHIN 24 HOURS OF CONNECTING THE DRAINAGE DITCH TO ANY CONVEYANCE SYSTEM THAT <br />DISCHARGES TO SURFACE WATERS. THE FIRST 200 LINEAR FEET MUST BE STABILIZED WITHIN 24 HOURS. THE <br />REMAINING DITCH SHALL BE STABILIZED WITHIN 7 DAYS. <br />6. INSTALL SILT FENCE AROUND ALL TEMPORARY INACTIVE STOCKPILES WHICH ARE NOT PLACED WITHIN EXISTING SILT <br />FENCES OR OTHER PERIMETER CONTROLS. <br />7. TEMPORARY OR PERMANENT ENERGY DISSIPATION AT PIPE APRON OUTLETS WILL BE PLACED PRIOR TO BUT NO SOONER <br />THAN 7 DAYS BEFORE APRON IS INSTALLED. RIPRAP SHALL BE INSTALLED UNDER APRON LIP ACCORDING TO THE <br />STANDARD DETAIL. <br />8. SUFFICIENT PERSONNEL, EQUIPMENT, AND MATERIALS SHALL BE MOBILIZED WITHIN 24 HOURS OF A WRITTEN ORDER BY <br />THE OWNER OR OWNER'S REPRESENTATIVE TO CONDUCT CORRECTIVE WORK AND INSTALL TEMPORARY EROSION CONTROL <br />WORK IN THE CASE OF AN EMERGENCY. <br />9. REMOVE ANY SEDIMENT THAT HAS BEEN TRACKED ONTO PUBLIC STREETS AT THE END OF THE DAY OR WITHIN 24 <br />HOURS OF DETECTION, OR MORE FREQUENT AT DIRECTION OF SITE INSPECTOR. <br />10. COLLECT ALL CONSTRUCTION DEBRIS IN DUMPSTERS AND ROLL -OFF BOXES, EMPTY WHEN DEBRIS REACHES TOP OF <br />DUMPSTER <br />11. INSPECT POLLUTION CONTROL MEASURES AS SPECIFIED WITHIN PART IV.F OF THE GENERAL PERMIT. <br />12. REPAIR SILT FENCES, INLET PROTECTION, GRAVEL CONSTRUCTION ENTRANCES AND OTHER EROSION AND SEDIMENT <br />CONTROLS AS NEEDED AND AS DEFINED IN THE PART IV.E.4 <br />INLET SEDIMENT CONTROL BMP REMOVAL <br />IF INLET SEDIMENT CONTROLS (WIMCO TYPE OR EQUAL) BMPS ARE REMOVED FOR FLOODING / FREEZING CONCERNS UPON <br />REQUEST OF THE MUNICIPALITY, WATERSHED DISTRICT OR OTHER AGENCY, DOCUMENTATION SHALL BE ATTACHED TO THE <br />INSPECTION REPORTS AND THIS SWPPP OR BE AVAILABLE WITHIN 72 HOURS OF REQUEST. DOCUMENTATION SHALL BE A <br />WRITTEN FORM OF CORRESPONDENCE VERIFYING THE NEED FOR REMOVAL. <br />UPON COMPLETION OF CONSTRUCTION ACTIVITIES <br />THE FOLLOWING EROSION PREVENTION AND SEDIMENT CONTROL MEASURES ARE SHOWN IN THE PLANS AND SHALL BE <br />IMPLEMENTED UPON COMPLETION OF CONSTRUCTION ACTIVITIES: <br />1. ALL DISTURBED AREAS WITHOUT PERMANENT IMPERMEABLE SURFACES WILL BE VEGETATED FOR FINAL STABILIZATION. IF <br />EROSION CONTROL BLANKET IS NOT REQUIRED, THE SITE SHALL BE STABILIZED WITH MN/DOT SEED MIXTURE 250 <br />APPLIED AT 70 LBS/ACRE AND TYPE -1 MULCH APPLIED AT 2 TONS/ACRE IN ACCORDANCE WITH MN/DOT SPECIFICATION <br />2575. <br />2. REMOVE ALL SILT FENCE, INLET PROTECTION AND OTHER EROSION AND SEDIMENT CONTROL DEVICES AFTER VEGETATION <br />IS 70% ESTABLISHED BY UNIFORM PERENNIAL VEGETATION COVER OVER THE ENTIRE PERVIOUS SURFACE AREA. REPAIR <br />ALL AREAS DISTURBED DURING REMOVAL OF BMPS. <br />3. CLEAN OUT ALL SEDIMENT FROM CONVEYANCES AND FROM TEMPORARY SEDIMENT BASINS THAT ARE TO BE USED AS <br />PERMANENT WATER QUALITY MANAGEMENT BASINS. THE CLEAN OUT OF PERMANENT BASINS MUST BE SUFFICIENT TO <br />RETURN THE BASIN TO DESIGN CAPACITY. <br />4. THE ORIGINAL PERMITTEES (OWNER AND OPERATOR) WHO HOLD THE NPDES PERMIT MUST SUBMIT NOTICE OF <br />TERMINATION (NOT) WITHIN 30 DAYS AFTER CONSTRUCTION AND FINAL STABILIZATION IS COMPLETE. <br />Rens: <br />08/07/17 - City Comments <br />03/20/18 - Final Development Approval Plans <br />05/30/18 - City Comm ents/Stormwater <br />07/11/18 - Watershed Comments <br />08/06/18 - City/Watershed Comments <br />08/08/18 - City Comments <br />Designed: RMB <br />Checked: RMB <br />Drawn: SYS <br />Record Drawing by/date: <br />A NOTICE OF TERMINATION (NOT) CAN BE APPLIED FOR PRIOR TO COMPLETION OF ALL CONSTRUCTION ACTIVITY IF ALL THE <br />FOLLOWING CONDITIONS ARE MET: <br />1. CONSTRUCTION ACTIVITY HAS CEASED FOR AT LEAST 90 DAYS <br />2. AT LEAST 90% BY AREA, OF ALL ORIGINALLY PROPOSED CONSTRUCTION ACTIVITY HAS BEEN COMPLETED AND <br />PERMANENT COVER IS ESTABLISHED ON THOSE AREAS. <br />3. ON AREAS WHERE CONSTRUCTION ACTIVITY IS NOT COMPLETE, PERMANENT COVER HAS BEEN ESTABLISHED. <br />SWPPP INSPECTIONS AND MAINTENANCE <br />EROSION AND SEDIMENT CONTROL INSPECTIONS <br />INSPECTIONS SHALL BE CONDUCTED BY A TRAINED AND QUALIFIED PERSON EVERY SEVEN DAYS AND WITHIN 24 HOURS AFTER <br />A RAINFALL EVENT EXCEEDING 0.5 INCHES IN A 24 HOUR PERIOD. THE OWNER OR AN ALTERNATE WILL CONDUCT THE <br />INSPECTIONS AS SPECIFIED IN THIS SWPPP. ALTERNATES WILL INCLUDE INDIVIDUALS TO BE DESIGNATED BY THE OWNER AND <br />MAY INCLUDE CONTRACTOR PERSONNEL OR OTHER QUALIFIED INDIVIDUALS AND SHALL BE LISTED IN THE PROJECT CONTACT <br />INFORMATION SECTION OF THIS REPORT. <br />FOLLOWING A RAIN EVENT INSPECTION, THE NEXT ROUTINE (WEEKLY) INSPECTION WILL TAKE PLACE WITHIN SEVEN (7) DAYS. <br />THE FOLLOWING SHALL BE COMPLETED DURING EACH INSPECTION: <br />1. <br />RECORD <br />DATE AND TIME OF INSPECTION <br />2. <br />NAME OF PERSON(S) CONDUCTING INSPECTION <br />3. <br />RECORD <br />RAINFALL RECORDS SINCE MOST RECENT INSPECTION <br />4. <br />INSPECT <br />THE SITE FOR EXCESS EROSION AND SEDIMENTATION <br />5. <br />INSPECT <br />SITE FOR DEBRIS, TRASH AND SPILLS <br />6. <br />INSPECT <br />TEMPORARY EROSION AND SEDIMENTATION CONTROL DEVICES <br />7. <br />INSPECT <br />CONSTRUCTION ENTRANCES FOR SEDIMENT TRACKING ONTO PAVED STREETS. <br />8. <br />INSPECT <br />THE ADJACENT STREETS AND CURB AND GUTTER FOR SEDIMENT, LITTER, AND CONSTRUCTION DEBRIS. <br />9. <br />INSPECT <br />SITE RUNOFF OUTFALL OR DISCHARGE AREAS <br />10. <br />RECORD <br />FINDINGS OF INSPECTION, INCLUDING RECOMMENDATIONS FOR CORRECTIVE ACTIONS <br />11. <br />RECORD <br />CORRECTIVE ACTIONS TAKEN (INCLUDING DATES, TIMES AND PARTY COMPLETING MAINTENANCE ACTIVITIES) <br />12. <br />RECORD <br />CHANGES MADE TO THE SWPPP AS REQUIRED IN PART III.A.5 OF THE GENERAL PERMIT <br />13. <br />THE SITE <br />INSPECTOR WILL VISUALLY CHECK A DISCHARGE FROM A TEMPORARY OR PERMANENT SEDIMENTATION BASIN TO <br />ENSURE <br />ADEQUATE TREATMENT IS OBTAINED AND DISCHARGE WATER WILL NOT CONTRIBUTE EXCESSIVE SEDIMENT OR <br />OTHER NUISANCE <br />CONDITIONS. <br />MAINTENANCE OF EROSION AND SEDIMENT CONTROL DEVICES <br />THE OWNER/CONTRACTOR IS RESPONSIBLE FOR THE OPERATION, MAINTENANCE OF TEMPORARY AND PERMANENT WATER <br />QUALITY MANAGEMENT BMPS AS WELL AS ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS, FOR THE DURATION OF <br />THE CONSTRUCTION WORK AT THE SITE. <br />THE FOLLOWING GUIDELINES WILL BE USED TO DETERMINE IF THE EROSION AND SEDIMENT CONTROL DEVICES REQUIRE <br />MAINTENANCE, REPAIR, OR REPLACEMENT: <br />1. IF SEDIMENT CONTROL DEVICES SUCH AS SILT FENCE ARE FILLED TO 1/3 OF THE HEIGHT OF THE CONTROL DEVICE, THE <br />CONTRACTOR SHALL REMOVE ALL SEDIMENT WITHIN 24 HOURS OF DETECTION OR NOTIFICATION. <br />2. IF INLET PROTECTION DEVICES APPEAR PLUGGED WITH SEDIMENT, ARE FILLED TO 1/3 CAPACITY, OR HAVE STANDING <br />WATER AROUND THEM, THE CONTRACTOR SHALL REMOVE THE SEDIMENT AND CLEAN OR REPLACE THE FILTER WITHIN 7 <br />DAYS OF DETECTION OR NOTIFICATION. <br />3. IF THE GRAVEL CONSTRUCTION ENTRANCES ARE FILLED WITH SEDIMENT OR OTHERWISE FAILING THE CONTRACTOR SHALL <br />EITHER REPLACE THE ENTRANCE OR ADD ADDITIONAL GRAVEL WITHIN 24 HOURS OF DETECTION OR NOTIFICATION. <br />4. IF SEDIMENT FROM THE SITE IS OBSERVED ON PAVED ADJACENT STREETS OR OTHER PROPERTIES, THE CONTRACTOR <br />SHALL REMOVE THE SEDIMENT WITHIN 24 HOURS OF DETECTION OR NOTIFICATION. <br />5. IF SEDIMENT FROM THE SITE IS OBSERVED ON ADJACENT STREETS, IN SURFACE WATERS OR OTHER PROPERTIES, THE <br />CONTRACTOR SHALL IDENTIFY THE SOURCE AND DISCHARGE LOCATION OF THE SEDIMENT AND IMPLEMENT ADDITIONAL <br />EROSION AND SEDIMENT CONTROLS AT THOSE LOCATIONS TO PREVENT FUTURE DISCHARGES. (additional controls and <br />information is described within the "SWPPP Notes" plan sheet) SEDIMENT MUST BE RETRIEVED WITHIN 7 DAYS FROM <br />SURFACE WATERS UNLESS ADDITIONAL REGULATORY APPROVAL IS NEEDED. THE PERMITTEE IS RESPONSIBLE TO <br />CONTACT ALL LOCAL, REGIONAL, STATE AND FEDERAL AUTHORITIES AND OBTAIN ANY APPLICABLE PERMITS PRIOR TO <br />CONDUCTING ANY WORK TO REMOVE SEDIMENT THAT HAS BEEN DISCHARGED FROM THE SITE. <br />6. IF TEMPORARY SEDIMENTATION BASINS APPEAR PLUGGED WITH SEDIMENT, OR FILLED TO 1/2 CAPACITY, THE <br />CONTRACTOR SHALL DRAIN THE BASIN AND REMOVE THE SEDIMENT WITHIN 72 HOURS OF DETECTION OR NOTIFICATION. <br />7. IF EXCESSIVE SEDIMENTS OR DEBRIS ARE OBSERVED AT THE FLARED END SECTION OUTFALLS, THE CONTRACTOR SHALL <br />DETERMINE THE SOURCE AND DISCHARGE LOCATIONS OF SUCH MATERIALS. IF THE DISCHARGE HAS OCCURRED ON THE <br />PROPERTY, THE CONTRACTOR SHALL REMOVE THE SEDIMENTS AND DEBRIS WITHIN 7 DAYS OF NOTIFICATION AND <br />CORRECT THE SOURCE OF SUCH MATERIALS. <br />8. IF SEDIMENT FROM THE SITE IS OBSERVED TO BE DISCHARGED FROM THE SITE, THE MPCA WILL BE NOTIFIED THE SAME <br />DAY. <br />AFTER FINAL STABILIZATION, THE RATE OF INSPECTIONS OF THE STABILIZED AREAS MAY BE REDUCED TO ONCE A MONTH IN <br />AREAS WHERE NO CONSTRUCTION IS ACTIVE AND 70% DENSITY VEGETATION IS ESTABLISHED. <br />MONTHLY INSPECTIONS TAKING PLACE WHERE AREAS OF THE SITE OR THE ENTIRE SITE ARE STABILIZED AND NON-ACTIVE WILL <br />BE CEASED AFTER A PERIOD OF 12 MONTHS IF THE SITE OR PORTIONS OF THE SITE ARE NON-ACTIVE AND STABILIZED. <br />INSPECTIONS WILL BE INITIATED ONCE AGAIN UPON CONSTRUCTION ACTIVITY BEGINNING OR UPON REQUEST FROM THE PCA OR <br />THEIR APPOINTED INSPECTOR. INSPECTIONS WILL CEASE DURING FROZEN GROUND CONDITIONS BUT WILL BEGIN AGAIN WITHIN <br />24 HOURS OF A RUNOFF EVENT. <br />Prepared for: <br />Apex HLLC <br />2110 Lyndale Avenue South Suite C <br />Minneapolis, MN 55405 <br />Orono Senior <br />Housing <br />Orono, Minnesota <br />Call 48 Hours before digging: <br />811 or call811.com <br />Common Ground Alliance <br />0011740SWP01. dwg <br />Date: 06/19/17 sheet: 12 OF 13 <br />SWPPP Narrative <br />