©2018 Westwood Professional Services, Inc. <br />SWPPP NOTES <br />Listed below are additional BMP's that may be considered for use if the BMP's identified in the <br />erosion control plans prove to be insufficient. Payment for these BMP's may only be made if <br />prior approval from an Owner has been given. <br />2. <br />3. <br />4. <br />5. <br />A <br />7. <br />STORM SEWER INLET PROTECTION <br />• STORM DRAIN INLETS SHALL BE PROTECTED UNTIL THE DISTURBED AREAS THAT COULD <br />DISCHARGE TO AN INLET HAVE BEEN STABILIZED. <br />• • INFRASAFE SEDIMENT CONTROL BARRIERS OR APPROVED EQUAL SHALL BE USED WHEN <br />CASTINGS ARE NOT IN PLACE. AS INDICATED ON THE UTILITY PLAN AND AS APPROVED BY <br />THE OWNER. <br />• • INFRASAFE DEBRIS COLLECTION DEVICE OR APPROVED EQUIVALENT SHALL BE USED WHEN <br />CASTINGS ARE IN PLACE AS INDICATED ON THE UTILITY PLAN AND AS APPROVED BY THE <br />OWNER. <br />• DOCUMENTATION IS NEEDED WITHIN 72 HOURS IF REMOVAL OF PROTECTION BMPS IS NEEDED <br />DUE TO WINTER CONDITIONS OR FLOODING CONCERNS. <br />STOCKPILES (TEMPORARY AND PERMANENT) <br />• LOCATE STOCKPILES A MINIMUM OF 100 FEET FROM CATCH BASIN INLETS, PONDS, AND SITE <br />DRAINAGE ROUTES <br />• PERIMETER CONTROLS SUCH AS SILT FENCE SHALL BE INSTALLED AROUND ALL STOCKPILES <br />IF NOT PLACED WITHIN EXISTING SILT FENCES OR OTHER SEDIMENT CONTROL. <br />• • TEMPORARY SEED AND MULCH SHALL BE USED TO STABILIZE THE STOCKPILES AND THE <br />STOCKPILES SHALL BE SHAPED TO FACILITATE SEEDING AND MINIMIZE EROSION AND SHALL <br />BE SEEDED WITHIN 7 DAYS. TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO <br />CONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL <br />TO THE GRADING CONTRACT. <br />• • IF TEMPORARY SEED AND MULCH CANNOT BE USED, THEN THE STOCKPILES SHALL BE <br />COVERED WITH HYDROMULCH, TARPS OR PLASTIC SHEETING AS APPROVED BY THE OWNER. <br />• IF STOCKPILES MUST BE PLACED WITHIN A CONVEYANCE A TEMPORARY BYPASS SHALL BE <br />INSTALLED (I.E. PVC PIPE) TO ADEQUATELY CONVEY RUNOFF. TEMPORARY BYPASS BMPS <br />SHALL BE INCIDENTAL TO THE CONTRACT UNLESS PREVIOUSLY APPROVED BY THE OWNER / <br />ENGINEER <br />CONSTRUCTION DEWATERING <br />• DURING DEWATERING ACTIVITIES, THE SEDIMENT LADEN WATER CANNOT BE DIRECTLY <br />DISCHARGED TO SURFACE WATERS. OPTIONS FOR REDUCING THE TURBIDITY OF THE WATER <br />INCLUDE: (TEMPORARY EROSION CONTROL DEVICES REQUIRED DUE TO CONTRACTORS METHOD <br />OF SEQUENCING THEIR CONSTRUCTION WORK SHALL BE INCIDENTAL TO THE GRADING <br />CONTRACT): <br />o CONSTRUCT A TEMPORARY SEDIMENT TRAP FOR TURBID WATER DISCHARGE. <br />o USE A PORTABLE SEDIMENT TRAP SYSTEM. <br />o APPLY NATURAL BASED FLOCCULENT TECHNOLOGY SUCH AS CHITOSAN IN SEDIMENT <br />TRAPS OR A SERIES OF DITCH CHECKS TO CONTAIN SEDIMENT. <br />o DISCHARGE THROUGH FIBER LOGS OR A ROCK WEEPER INTO A LARGE VEGETATIVE <br />BUFFER AREA. <br />o PUMP TO A TEMPORARY SEDIMENT BASIN. <br />• ENERGY DISSIPATION WILL BE PROVIDED AT ALL DISCHARGE POINTS. <br />• DEWATERING OR BASIN DRAINING ACTIVITIES WILL NOT CAUSE EROSION IN RECEIVING <br />CHANNELS OR ADVERSELY IMPACT WETLANDS. <br />• ALL EROSION CONTROL OR SEDIMENT TRAPS REQUIRED FOR CONSTRUCTION DEWATERING <br />SHALL BE CONSIDERED INCIDENTAL TO THE CONSTRUCTION ACTIVITY REQUIRING DEWATERING. <br />CONSTRUCTION ENTRANCES <br />• A TEMPORARY CRUSHED ROCK OR WOOD CHIP PAD SHALL BE LOCATED WHERE VEHICLES <br />LEAVE THE CONSTRUCTION SITE. <br />• THE CONSTRUCTION ENTRANCE PAD SHALL BE AT LEAST 50 FEET IN LENGTH. <br />• GEOTEXTILE FABRIC MAY BE PLACED UNDER THE CRUSHED ROCK OR WOOD CHIPS TO <br />PREVENT MIGRATION OF MUD FROM UNDERLYING SOIL INTO THE CONSTRUCTION ENTRANCE <br />MATERIAL. <br />• ROCK PADS SHALL BE CONSTRUCTED OF ROCK 1 TO 3 INCHES IN SIZE AND PLACED IN 6 <br />INCH LAYERS. <br />• CONSTRUCTION ENTRANCES SHALL BE INSPECTED AT LEAST EVERY 7 DAYS AND MAINTAINED <br />AS NEEDED. <br />• TRACKED SEDIMENTS SHALL BE REMOVED FROM PAVED SURFACES AT THE END OF EACH <br />DAY USING PICK—UP TYPE STREET SWEEPER. <br />• IF TRACKING INTO ROADWAY BECOMES PROBLEMATIC THE ENTRANCE PADS SHALL BE <br />LENGTHENED OR ANOTHER TECHNIQUE APPLIED. TEMPORARY EROSION CONTROL DEVICES <br />REQUIRED DUE TO CONTRACTORS METHOD OF SEQUENCING THEIR CONSTRUCTION WORK <br />SHALL BE INCIDENTAL TO THE GRADING CONTRACT. <br />• THE CONSTRUCTION ENTRANCE SHALL BE MONITORED CLOSELY DURING WET CONDITIONS. IF <br />TRACKING INTO ADJACENT ROADWAYS OCCURS, THE FREQUENCY OF STREET SWEEPING <br />SHALL BE INCREASED. <br />CONCRETE TRUCK WASHOUT <br />• CONCRETE TRUCKS SHALL UTILIZE THE CONCRETE WASHOUT AREA SHOWN ON THE PLANS <br />TO WASH AND RINSE THEIR EQUIPMENT PRIOR TO LEAVING THE SITE. <br />• WASHOUT OF CONCRETE MIXER TRUCKS WILL BE PERFORMED IN THE DESIGNATED AREAS <br />ONLY. <br />• WASHOUTS WILL BE CONSTRUCTED AND MAINTAINED TO PROVIDE SUFFICIENT CONTAINMENT <br />FOR ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS. <br />• WASHOUTS SHALL BE CLEARLY MARKED ON SITE WITH SIGNAGE BY THE UTILITY CONTRACTOR <br />WITH APPROVAL FROM OWNER. <br />• WASHOUTS SHALL BE LOCATED A MINIMUM OF 50 FEET FROM DRAINAGE FACILITIES AND <br />WATERCOURSES. <br />• CONCRETE WASHOUT AREAS WILL HAVE AN IMPERMEABLE LINER TO PREVENT CONCRETE <br />WASHOUT WATER FROM INFILTRATING/CONTACTING WITH SOIL. <br />• IMPERMEABLE LINER INCLUDES 10 MIL POLYLINER OR COMPACTED CLAY LINER. <br />• WASHOUT SYSTEMS CAN BE USED AS ALTERNATE WASHOUT AREAS. <br />VEHICLE MAINTENANCE <br />• ROUTINE MAINTENANCE OF VEHICLES AND EQUIPMENT SHALL OCCUR IN STAGING AREAS <br />ONLY. <br />• VEHICLE WASHING SHOULD BE AVOIDED. IF WASHING IS NECESSARY, RUNOFF FROM THE <br />WASHING WILL BE CONTAINED AND LIMITED TO A DEFINED AREA OF THE SITE. RUNOFF <br />MUST BE CONTAINED AND WASTE PROPERLY DISPOSED OF. <br />• ENGINE DEGREASING SHALL BE AVOIDED. IF DEGREASING IS NECESSARY, RUNOFF FROM <br />THE OPERATION WILL BE CONTAINED IN A LINED SEDIMENT TRAP AND PROPERLY DISPOSED <br />OF AT A TREATMENT FACILITY. <br />• ALL REQUIRED SEDIMENT TRAPS AND CONTAINMENT FACILITIES AND PROPER DISPOSAL OF <br />WASH WATER/DEGREASING AT A TREATMENT FACILITY SHALL BE INCIDENTAL TO THE <br />CONSTRUCTION CONTRACT. <br />FUELING <br />• ANY FUEL TANK OR TRUCK STORED ON THE PROJECT SITE SHALL BE PROTECTED BY A <br />SECONDARY CONTAINMENT SYSTEM. <br />• FUELING AREAS SHALL NOT BE WASHED OR RINSED WITH WATER SINCE THIS COULD CAUSE <br />FUEL SPILLS TO BE DISCHARGED INTO STORM WATER SYSTEMS. <br />• ABSORBENT MATERIALS SHALL BE AVAILABLE ON SITE FOR USE IN CLEANING UP SMALL <br />SPILLS. <br />• ALL REQUIRED FUEL CONTAINMENT AND CLEAN—UP MATERIALS AND THE PROPER DISPOSAL <br />OF THE MATERIALS SHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT. <br />Westwood <br />Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 <br />Fax (952) 937-5822 Minnetonka, MN 55343 <br />Toll Free (888) 937-5150 westwoodps.com <br />Westwood Professional Services, Inc. <br />8. HAZARDOUS MATERIALS <br />• HAZARDOUS MATERIALS SHALL BE PROPERLY STORED TO PREVENT VANDALISM OR <br />UNAUTHORIZED ACCESS. <br />• CONTAINMENT UNITS SHALL BE INSTALLED IN ACCORDANCE WITH FEDERAL, STATE, AND <br />LOCAL REGULATIONS. <br />• MPCA STORING AND DISPOSAL REQUIREMENTS SHALL BE FOLLOWED FOR ALL HAZARDOUS <br />WASTE. <br />• NO HAZARDOUS MATERIAL SHOULD BE STORED WITHIN 200 FEET OF AN IDENTIFIED CRITICAL <br />AREA. <br />• ABSORBENT MATERIALS SHALL BE AVAILABLE FROM THE CONTRACTOR ON SITE FOR USE IN <br />CLEANING UP SMALL SPILLS. <br />• IF BUILDING MATERIALS, CHEMICALS, OR GENERAL REFUSE IS BEING USED, STORED, <br />DISPOSED OF, OR OTHERWISE MANAGED INAPPROPRIATELY, THE CONTRACTOR SHALL <br />CORRECT SUCH DEFECTS WITHIN 24 HOURS OF DETECTION OR NOTIFICATION. <br />• ALL REQUIRED CONTAINMENT / STORAGE UNITS / ABSORBENT MATERIAL AND REQUIRED <br />DISPOSAL SHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT. <br />9. CHEMICAL CONTAINMENT <br />• GASOLINE, OIL, PAINT, SOLVENTS, AND OTHER CHEMICALS NECESSARY FOR CONSTRUCTION <br />ARE NOT ALLOWED TO CONTACT THE GROUND SURFACE, BE EXPOSED TO GROUNDWATER OR <br />BE RELEASED TO A SURFACE OR GROUNDWATER EXCEPT IN DE MINIMIS QUANTITIES. <br />• ALL PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL CONTAINER, WITH ORIGINAL LABELS STILL <br />ATTACHED, UNLESS THE CONTAINER IS NOT RESEALABLE. <br />• HAZARDOUS MATERIALS SHALL BE RETURNED TO THE HAZARDOUS MATERIAL STORAGE AREA <br />AT THE END OF EACH DAY. <br />• AN EFFORT SHOULD BE MADE TO STORE ONLY ENOUGH PRODUCTS TO DO THE REQUIRED <br />JOB. <br />• THE CONTRACTOR SHALL PROVIDE TANKS OR BARRELS TO COLLECT LIQUID BYPRODUCTS <br />THAT POSE A POLLUTION HAZARD. <br />• THE POLLUTANTS SHALL BE REMOVED FROM THE SITE ON A WEEKLY BASIS AND DISPOSED <br />OF IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS. <br />• ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY, IN ACCORDANCE WITH <br />THE MANUFACTURE'S RECOMMENDED METHODS. <br />• ALL REQUIRED CONTAINMENT / STORAGE UNITS / ABSORBENT MATERIAL AND REQUIRED <br />DISPOSAL SHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT <br />• ALL STORAGE AREAS SHALL BE SECURED TO PREVENT UNAUTHORIZED ACCESS. <br />10. SOLID WASTE <br />• SOLID WASTE SHALL BE STORED IN APPROPRIATE CONTAINERS AND PROPERLY DISPOSED OF <br />ON A REGULAR BASIS. <br />• CONTAINERS SHALL BE COVERED TO PREVENT WIND BLOWING THE WASTE AROUND THE SITE. <br />• MPCA DISPOSAL REQUIREMENTS WILL BE FOLLOWED FOR ALL SOLID WASTE. <br />• SOLID WASTE STORAGE CONTAINERS AND PROPER DISPOSAL SHALL BE CONSIDERED <br />INCIDENTAL TO THE CONSTRUCTION CONTRACT. <br />11. DUST CONTROL <br />• THE CONTRACTOR SHALL USE A VARIETY OF DUST CONTROL INCLUDING BUT NOT LIMITED TO <br />THE FOLLOWING: <br />A. RAPID STABILIZATION METHODS ON SLOPES <br />B. WATER ON ROADWAYS AND GRADED AREAS <br />C. ALTERNATIVES: IN THE FORM OF VEGETABLE POLYMERS, WATER AND CALCIUM <br />CHLORIDE PETROLEUM EMULSION RESINS, OR ACRYLIC COPOLYMERS MAY ALSO BE <br />USED. <br />• ALL REQUIRED DUST CONTROL SHALL BE INCIDENTAL TO THE CONSTRUCTION CONTRACT AS <br />PER SPECIFICATIONS. <br />12. NON—STORMWATER DEWATERING <br />• HYDRANT FLUSHING: FLUSHING OF HYDRANTS WILL BE DISCHARGED THROUGH TEMPORARY <br />PIPES AS NECESSARY, ONTO IMPERVIOUS SURFACES OR TO STABILIZED AREAS WITH ENERGY <br />DISSIPATION AT THE DISCHARGE POINT. THE DISCHARGE SHOULD BE COLLECTED BY THE <br />STORM WATER BASINS AND STORM SEWER SYSTEM. <br />• POTABLE WATER DISCHARGE: ALL WATER LINES WILL BE FLUSHED USING HOSES AND <br />DISCHARGED ONTO AN IMPERVIOUS SURFACE AND DIRECTED TO THE STORM SEWER <br />INFRASTRUCTURE BY NON—EROSIVE MEANS. <br />13. WORK NEAR OR IN IMPAIRED WATERS <br />• EXPOSED SOILS MUST BE STABILIZED WITHIN 7 DAYS OF ACTIVITY TEMPORARILY OR <br />PERMANENTLY CEASED. <br />• TEMPORARY SEDIMENT BASIN NEEDED WITHIN AREAS 5 ACRE DISTURBANCE WITH COMMON <br />POINT OF DISCHARGE. <br />• IF WORK IS NEAR SPECIAL WATERS REFER TO APPENDIX A OF THE NPDES PERMIT FOR <br />ADDITIONAL NOTES AND REQUIREMENTS. <br />• NO UNTREATED DEWATERING WILL TAKE PLACE AND DISCHARGE TO "IMPAIRED WATERS" <br />I hereby certify that thisIan was b me or under m <br />direct supervision and that I am a duly licensed PROFESSIONAL <br />ENGINEER under he laws of the State of Minnesota <br />yy <br />COMPANY <br />FM <br />Prepared for: Apex HLLC <br />2110 Lyndale Avenue South Suite C <br />Minneapolis, MN 55405 <br />08/07/17 — City Comments <br />03/20/18 — Final Development Approval Plans <br />QIeckmh RMB <br />05/30/18 — City Comm ents/Stormwater <br />07/11/18 — Watershed Comments <br />Drawn: sYs <br />Ryan U Bluhm <br />Data 08/08/18 ucwse No. 41257 <br />08/06/18 — City/Watershed Comments <br />08/08/18 — City Comments <br />Remd prate by/date: <br />ALTERNATE <br />Call 48 Hours before digging: <br />811 or call811.com <br />Common Ground Alliance <br />TITLE <br />COMPANY <br />NAME CONTACT NUMBER <br />OWNER <br />CONTRACTOR <br />SITE NPDES INSPECTOR <br />ALTERNATE <br />ENGINEER <br />Westwood Professional Services <br />GRETCHEN SCHROEDER 952-906-7480 <br />STORM WATER <br />INSPECTOR <br />DUTY OFFICER <br />STATE OF MN <br />1-800-422-0798 <br />CITY ENGINEER <br />CITY OF ORONO <br />ADAM EDWARDS 952-249-4600 <br />Orono Senior <br />Housing <br />Orono, Minnesota <br />0011740SWP01. dwg <br />Date: 06/19/17 Sheet: 13 OF 13 <br />SWPPP Notes <br />