Laserfiche WebLink
AGENDA ITEM <br />Item No.: <br />Date: September 10, 2018 <br />Item Description: Sanitary Sewer Pump Replacements <br />Presenter: Scott Oberaigner Agenda Consent Agenda <br />Utilities Supervisor Section: <br />1. Purpose. The purpose of this council action is to gain council approval to replace sewer <br />pumps at Lift Station 1 and Lift Station 23. <br />2. Background. This year's lift station inspections have reveled two lift stations that require pump <br />replacements. <br />3. Scope. Replacement of fours pumps and accessories and installation at Lift Stations 1 and 23. <br />4. Cost. The cost to replace the 4 pumps is $ 31,700. <br />5. Funding. This equipment will be funded through the Sanitary Sewer Fund. The estimated balance at <br />then Endo of year 2018 is $1,797,833. There is a positive balance this year from our 2018 Lift Station <br />rehabilitations that will cover the expense of these pump replacements. Also Lift Station one is <br />scheduled for a rehabilitation next year which would have included pump replacement. <br />6. Staff Recommendation. Staff Recommends replacement of the three pumps by Quality Flow <br />Systems. Quality Flows proposal includes KSB pumps which is common to others in our system and <br />includes installation, training and warrantee. <br />COUNCIL ACTION REQUESTED <br />Motion to accept the proposal from Quality Flow Systems Inc for the replacement of three sewer pumps <br />for $ 31,700. <br />Prepared By: <br />Reviewed By: <br />Approved By: -TV <br />