My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-26-2018 Council Packet
Orono
>
City Council
>
2018
>
11-26-2018 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 2:00:32 PM
Creation date
5/23/2019 1:56:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
p CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />s, <br />G <br />No. 6907 <br />qKESH <br />CONCLUSIONS, ORDER AND CONDITIONS: <br />NOW, THEREFORE, BE IT RESOLVED, based upon one or more of the above findings, <br />the Orono City Council hereby grants Preliminary Plat Approval to allow the subdivision of the <br />Property into two building lots and one outlot, as depicted on the preliminary plat drawing and <br />grading plans dated 09/25/18 prepared by Gronberg and Associates, attached as Exhibit A, <br />subject to the following conditions: <br />1) Approval is subject to Minnehaha Creek Watershed District (hereinafter the "MCWD") <br />approval and permits as required. Final Plat approval shall not be granted until the Owners <br />have provided evidence that all required MCWD permits have been obtained. <br />2) Approval is subject to Hennepin County approval of permits as required. Final Plat approval <br />shall not be granted until the Owners have provided evidence that all required Hennepin <br />County permits have been obtained. <br />3) The Owners shall address the engineering comments and conditions provided by City <br />Engineer in a memo dated September 20, 2018 attached hereto as Exhibit B with the final <br />development plan submittal. <br />4) No driveway connection over Lot 2 to the private driveway shared by Lot 2 and 2715 Pence <br />Lane shall be provided for Lot 1 or any other lot. <br />5) The applicant will be required to obtain a General Construction Permit (NPDES) to discharge <br />stormwater associated with construction activity since more than 1 acre will be disturbed. A <br />copy of the coverage letter should be submitted prior to any land disturbing activity. <br />6) The common driveway shared by Lot 2 and 2715 Pence Lane shall be maintained to provide <br />an acceptable driving surFace at all times. <br />7) Erosion control shall adhere to "Best Management Practices for Protecting Water Quality in <br />Urban Areas" and to the approved SWPPP. All erosion controls as required by the City and <br />the MCWD shall be in place prior to commencing grading and excavation on the site. All such <br />erosion control measures shall be maintained in working order until the site is vegetated and <br />stabilized. <br />8) The construction limits shall be clearly marked with adequate fencing to prevent any <br />construction damage or disturbance of any trees and vegetation outside of the construction <br />limits area. Owners shall identify trees to be preserved on site, shall mark them on a site plan, <br />and shall take extraordinary measures such as fencing, signage, etc. to ensure they are not <br />disturbed. <br />3
The URL can be used to link to this page
Your browser does not support the video tag.