Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br /> <br />NO. ________________________ <br /> <br /> <br />2 <br /> <br />2) Dedication on the plat of the perimeter Drainage and Utility Easements as required in <br />Resolution 6907. <br /> <br />3) Plans and Specifications. Development within PENCE LANE ADDITION is subject to the City <br />approved plans and specifications: <br /> <br />a) Final grading, stormwater, drainage and erosion control plan, dated 11/16/18. <br /> <br />b) Final stormwater pollution prevention plan (SWPPP), dated 11/16/18. <br /> <br />4) Access to Lot 1 will be via Walters Port Lane only. <br /> <br />5) Access to Lot 2 will be via the private driveway (Pence Lane) that connects to Kelly Avenue. <br />This access is shared with 2715 Pence Lane. <br /> <br />6) Vehicular access to Pence Lane from Lot 1 is expressly prohibited. <br /> <br />7) The common Pence Lane driveway shared by Lot 2 and 2715 Pence Lane shall be maintained <br />to provide an acceptable driving surface at all times. <br /> <br />8) A covenant to outline responsibility for all future maintenance activities related to the <br />stormwater facilities shall be recorded. <br /> <br />9) A title opinion for the Property and certified copies of all recorded easements currently <br />affecting the Property shall be submitted. <br /> <br />10) A Letter of Credit and escrow to ensure that all site improvements are installed and maintained <br />to the City’s specifications and satisfaction, shall be submitted. <br /> <br />11) Payment of Development Fees. Total due: $16,550.00 <br />a. Final plat fee: $500.00. <br />b. Park Dedication Fee: $5,550. <br />c. Stormwater and Drainage Trunk Fee: $10,500.00. <br /> <br />12) Financial Guarantee. The Owners shall submit a final plat review escrow in the amount of <br />$2,500.00 with the final plat application. <br /> <br />Additionally, the Owners shall provide a financial guarantee to ensure the completion of <br />site improvements. The City Engineer shall complete an estimate of improvement costs, <br />including but not limited to storm sewers, landscaping, grading, erosion control, utilities,