My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-11-2019 Council Packet
Orono
>
City Council
>
2019
>
03-11-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 12:16:46 PM
Creation date
5/22/2019 12:14:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />favorably act on a formal development proposal until the Met Council approves the 2020-2040 Comprehensive Plan. <br />The proposed number of units 75-90 fall within the desired density range. <br /> <br />Fees. I have provided an estimate of fees associated with this project, assuming 75 units and 75 SAC units. Final <br />numbers will be determined at the time of Final Plat approval and Building Permit issuance. <br /> <br />Park dedication is applied on a per unit cost, and the City Council establishes a minimum and maximum land value <br />range due to the wide range of land values in Orono. The minimum land value range is $3,250.00. Park dedication <br />for 75 dwelling units is $243,750.00. Full methodology is attached. <br /> <br />Utility fees. Sanitary sewer and water connection charges are based on a per unit costs. Assuming 75 SAC units, <br />where the Met Council determines the number of SAC units, the Water connection charge is $318,000 ($4,250 x <br />75 SAC units) and the sanitary sewer is $391,875 ($5,225 x 75 SAC units). <br /> <br />The City charges a Storm Water Trunk fee, which is based on a density number applied to the number of acres. For <br />attached family development with a density of 43 units per acre or more, the charge of $8,490 per acre, or $31,328 <br />($8,490 x 3.69). <br /> <br />Next Steps. Following Planning Commission and City Council feedback, as well as Met Council approval of the 2020- <br />2040 Comprehensive Plan, the property will need to be rezoned, platted, and the Master Development Plan approved. <br /> <br />I will be your primary contact through the review process, please direct all information or questions to me. I can <br />be reached at 952.249.4626 or by email at jbarnhart@ci.orono.mn.us. <br /> <br /> <br />Sincerely, <br />CITY OF ORONO <br /> <br /> <br />Jeremy Barnhart, AICP <br />Community Development Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.