My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
re: new asphalt
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0550 Tonkawa Road - 05-117-23-32-0004/6
>
Correspondence
>
re: new asphalt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:57 PM
Creation date
5/21/2019 2:02:34 PM
Metadata
Fields
Template:
x Address Old
Address
0550 Tonkawa Rd
Document Type
Correspondence
PIN
0511723320004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> CONSTRUCTION <br /> CONSULTING k <br /> INSPECTIONS,LTD. <br /> July 14, 2007 <br /> SPECIFICATIONS-2008 <br /> CARLSON ESTATES NEW ASPHALT <br /> TONKAWA ROAD <br /> ORANO,MN. <br /> This specification has been prepared for asphalt replacement and related work. The contractor <br /> will be responsible for a full and totally complete installation,no matter if this specification lists <br /> all the detail necessary for such a full and totally complete installation or not. The contractor <br /> must point out and list any deficiencies noted in this specification prior to contracting. The <br /> contractor will provide all labor,materials, equipment and resources. Nothing will be provided <br /> by the owner,unless specifically noted in this specification. There are two (2) drawings- C 1 <br /> and C2 dated 7-14-08 for this work. A subsurface geotechnical assessment prepared by SPC <br /> Engineering,PA is also included. All measurements and assumptions for bidding and <br /> contracting must be based on these specifications and field measurements of the property. <br /> I. THE WORK BASE BID) <br /> 1. Mill 2 inches of existing asphalt from roadways and driveways as noted on <br /> Drawing C I. Milled asphalt may be stored on site to be reused as partial subbase <br /> where required. All excess materials to be removed. <br /> 2. Remove all existing asphalt,base material and soil within 15 inches of final, <br /> grades at two(2)noted areas. See Drawing C1. <br /> 3. Remove existing stone gutters as noted on Drawing C1. <br /> 4. Furnish and install new 4 inch diameter PVC pipe for utilities where noted on j <br /> Drawing C 1. Trench minimum 19 inches below finish asphalt surface and fill <br /> with compacted base. <br /> 5. Existing removed stone gutters to be replaced by Larry Barlett Construction(952- <br /> 221-3142)after asphalt work is completed. Such construction is not part of this <br /> work. <br /> Construction Consulting&Inspections,Ltd. <br /> 750 2nd Street NR- <br /> Suite 363 <br /> Hopkins,MN 55343 <br /> Phone:(952)944-7137 <br /> Fax:(952)935-9647 <br />
The URL can be used to link to this page
Your browser does not support the video tag.