Laserfiche WebLink
5. Diversions of Water. A LOP may not be used to e. Damage claims associated with any future <br /> authorize all or any portion of a project that would divert modification,suspension,or revocation of this permit. <br /> more than 10,000 gallons/day of surface water or <br /> groundwater into or out of the Great Lakes Basin. 4. Reliance on Applicant's Data: The determination of this <br /> office that issuance of this permit is not contrary to the <br /> 6.State Section 401 Certification.The Minnesota public interest was made in reliance on the information you <br /> Pollution Control Agency(MPCA)has waived water provided. <br /> quality certification for authorizations under LOP-05-MN. <br /> The MPCA has not waived your responsibility to comply 5. Reevaluation of Permit Decision.This office may <br /> with the water quality standards contained in Minn.R. reevaluate its decision on this permit at any time the <br /> 7050 and other applicable MPCA statutes and rules. circumstances warrant.Circumstances that could require a <br /> reevaluation include,but are not limited to,the following: <br /> 7. Coastal Zone Management consistency <br /> determination. The State of Minnesota has determined a. You fail to comply with the terms and conditions of <br /> that LOP-05-MN is consistent with the Minnesota CZM this permit. <br /> program. <br /> b. The information provided by you in support of your <br /> Further Information. permit application proves to have been false,incomplete,or <br /> 1. Congressional Authorities: You have been authorized to inaccurate(see 4 above). <br /> undertake the activity described above pursuant to Section <br /> 404 of the Clean Water Act(33 U.S.C.1344). c. Significant new information surfaces which this office <br /> did not consider in reaching the original public interest <br /> 2. Limits of this authorization. decision. Such a reevaluation may result in a determination <br /> that it is appropriate to use the suspension,modification, <br /> a. This LOP does not obviate the need to obtain other and revocation procedures contained in 33 CFR 325.7 or <br /> Federal,state,or local authorizations required by law. enforcement procedures such as those contained in 33 CFR <br /> 326.4 and 326.5.The referenced enforcement procedures <br /> b. This LOP does not grant any property rights or provide for the issuance of an administrative order <br /> exclusive privileges. requiring you to comply with the terms and conditions of <br /> your permit and for the initiation of legal action where <br /> c. This LOP does not authorize any injury to the property appropriate.You will be required to pay for any corrective <br /> or rights of others. measures ordered by this office,and if you fail to comply <br /> with such directive,this office may in certain situations <br /> d. This LOP does not authorize interference with any (such as those specified in 33 CFR 209.170)accomplish the <br /> existing or proposed Federal project. corrective measures by contract or otherwise and bill you <br /> for the cost. <br /> 3. Limits of Federal Liability.In authorizing work,the <br /> Federal Government does not assume any liability, 6.No activity or its operation may impinge or abrogate <br /> including but not limited to the following: reserved treaty rights,including,but not limited to, <br /> reserved water rights and treaty fishing and hunting rights. <br /> a. Damages to the permitted project or uses thereof as a <br /> result of other permitted or unpermitted activities or from 7. If you discover any previously unknown historic or <br /> natural causes. archaeological remains while accomplishing the authorized <br /> activity you must immediately stop work and notify this <br /> b. Damages to the permitted project or uses thereof as a office of what you have found.We will initiate the Federal <br /> result of current or future activities undertaken by or on and state coordination required to determine if the remains <br /> behalf of the United States in the public interest. warrant a recovery effort or if the site is eligible for listing <br /> in the National Register of Historic Places. <br /> c. Damages to persons,property,or to other permitted or <br /> unpermitted activities or structures caused by the activity 8.Extensions.General condition 1.,above,establishes a <br /> authorized by this permit. time limit for the completion of the activity authorized by <br /> this permit.Unless there are circumstances requiring either <br /> d. Design or construction deficiencies associated with the a prompt completion of the authorized activity or a <br /> permitted work. reevaluation of the public interest decision,the Corps will <br /> normally give favorable consideration to a request for an <br /> extension of this time limit. <br /> 3 <br />